Forwards Safety Evaluation Re Util 881128,900308 & 0417 Responses to Generic Ltr 88-11.Pressure Temp Limits for Heatup,Cooldown,Leak Test & Criticality of Reactor & Cooling Sys Acceptable & May Be Incorporated Into Plant Tech Specs
ML20055D333
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/27/1990
From: Butler W
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML20055D334 List:
References
RTR-REGGD-01.099 GL-88-11, TAC-71503, NUDOCS 9007060188
Download: ML20055D333 (2)


Text

.--

June 27,1990

,.c

^

DISTRIBUTION Docket No. 50-354 D5 net n ie EJordan NRC PDR ACRS (10) l

- Mr. Steven E.,Miltenberger Local PDR PSwetland Vice President and Chief Nuclear PDI-2 Reading RBlough

' Officer SYarga ADeAgazio Public Service Electric & Gas Company BBoger Post Office Box 236 WButler Hancocks Bridge, New Jersey 08038 M0'Brien 0GC

Dear Mr.'Miltenberger:

SUBJECT:

' RESPONSE TO GENERIC LETTER 88-11, RADIATION EMBRITTLEMENT OF REACTOR VESSEL MATERIALS, HOPE-CREEK GENERATING STATION (TAC NO. 71503)

By letters. dated November 28, 1988, March 8, 1990, and April 17,1990,)Public

[

Service Electric & Gas Company (PSE&G) responded to Generic Letter (GL 88-11 1 and subsequent requests for additional information regarding radiation embrittlement of reactor vessel materials.

With the assistance of EG&G, Idaho, Inc.. the staff has completed its review of the licensee's responses to the GL. The staff's findings are provided in' the enclosed safety evaluation (SE). Based on its evaluation, the' staff has concluded that the current pressure-temperature limits for heatup, cooldown, leak test and criticality of the reactor end its cooling system are acceptable

and they may be maintained in the Hope Crtek Technical Specifications.

Sincerely, i

Original signed b Walter R. Butler,yDirector Project Directorate I-2 Division of Reactor Projects I/II.,

4 Office of Nuclear Reactor. Regulation i

Enclosure:

Saf ety' Evaluation cc=w/ enclosure:

. See next page.

O b

[TACN0.-71503]

rD b

/

3 LA

/ M PDI-2/PM PDI-2/D 1en (

CShiraki:mj WButler h/,p/90 g /2 /90 90 9007060188 900627

'O PDR ADOCK 05000354 I'

P FDC l

g i

I L

s,,s.

i Mr.. Steven E.'Miltenberger.

Hope Creek Generating Station Public Service Electric & Gas Co.

CC*

t

,- M.' J.: Wetterhahn, Esquire Mr. Scott B. Ungerer, Manager

'; Conner & Wetterhahn Joint Generation Projects Department i

Suite 1050-Atlantic Electric Company.

1747 Pennsylvania Avenue' Post Office Box 1500 Washington.D.C.

20006 Pleasantville, New Jersey 08232 R. Fryling, Jr., Esquire Law D oartment - Tower SE l

80 Par k P' ace y

Newark, Bew-Jersey 07101 Resident-Inspector U.S. Nuclear Regulatory Comission P.O. Box 241-Hancocks Bridge', New Jersey. 08038 Mr. S. LaBruna Vice President - Nuclear Operations

-Nuclear Department P.O. Box 236

-Hancocks Bridge,.New Jersey 08038 Mr. J. J. Hagan

' General Manager - Hope Creek Operations Hope Creek Generating Station P.O. Box 236

.Hancocks Bridge, New Jersey 08038 Mr..B. A. Preston, Manager Licensing and Regulation-Nuclear Department' P.O. Box'236 Hancocks Bridge, New Jersey 08038' t

. Regional Administr'ator, Region I U.S. Nuclear Regulatory Comission 475 Allendale Road t

King of Prussia, Pennsylvania 19406 Dr. Jill Lipoti, Asst. Director

-Radiation Protection Programs NJ Department of Environmental Protection CN 415 Trenton, New Jersey 08625-0415,