n February 27, 1990 Docket No. 50-288 Dr. Lawrence Ruby, Director Reactor Facility Reed College 3203 SE Woodstock Blvd.
Portland, Oregon 97202-
Dear Dr. Ruby:
4
SUBJECT:
OPERATOR REQUALIFICATION PROGRAM FOR THE REED COLLEGE TRIGA HUCLEAR REACTOR We have reviewed-the proposed operator requalification plan deteiled:in your letters of July 5,1989 and January 17, 1990. The additional information' that was needed to clarify certain aspects of the written examination ~,; opera-ting test, and on-the-job training, has been ~added in your January 17, 1990 submission. Our review indicates that the program now meets the criteria in 10 CFR Part 55, and is acceptable.
Sincerely, Original signed by:
Theodore S. Michaels, Senior Project Manager Non-Power Reactor, Decommissioning and Environmental Project Directorate Division of Reactor Projects --III, IV, V and Special Projects-Office of Nuclear Reactor Regulation DISTRIBUTION EDocket fjler NRC & Local PDRs PDNP r/f WTravers EHylton TMichaels OGC EJordan ACRS (10)
Plant file
[TM LTR2 LRuby]
900308on.c; y06227
[DR ADtG OM 00288
[
Q PDC L
)t P
,[A-PDNP:PM PDNP:D O t en TMichael mj SWe)ss 2
/90 2/7.)/90 2/fy, /90
e.
~~ g% REC -
'o UNITED STATES.
f"'.
Ig NUCLEAR REGULATORY COMMISSION p
g
- 2. E WASHING TON, D. C. 20555
%...../
February. 27, 1990
- Decket No. 50-288 Dr. Lawrence Ruby, Director Reactor Facility Reed College 3203 SE Woodstock Blvd.
Portland,_0regon--97202
Dear Dr. Ruby:
SUBJECT:
OPERATOR REQUALIFICATION PROGRAM'FOR THE REED COLLEGE TRIGA NUCLEAR REACTOR We have reviewed the proposed operator requalification plan detailed in your letters of July 5,1989, and January 17,1990._ : The additional'.information that was needed to clarify certain aspects of the written examination, opera-ting test, and on-the-job training, has been added-in your January _ 17, 1990 submission. Our review indicates that the program now meets the criteria in 10 CFR Part 55, and is acceptable.
l-Sincerely,.
3 s
J heodoreS..pichaes,SeniorProjectManag
'Non-Power Reactor,. Decommissioning and Environmental Project Directorate-Division of Reactor Projects - III, IV, V.and Special Projects-Office of-Nuclear. Reactor Regulation i
?
-v---
.s----
r u
a, r--
r e
LFebruary 27, 1990
~~
Docket No.-50-288 Dr. Lawrence Ruby, Director Reactor Facility Reed College-3203 SE Woodstock Blvd..
s Portland, Oregon 97202
Dear Dr. Ruby:
SUBJECT:
0PERATOR REQUALIFICATION PROGRAM FOR THE REED COLLEGE TRIGA NUCLEAR REACTOR We have reviewed the proposed operator requalification plan detailed in-your letters of July 5,1989 and January 17 1990. The additional information that was needed to clarify certain aspects of the written examination, opera-ting test, and on-the-job training, has been added in your January 17, 1990 submission. Our review indicates that the program now meets the criteria in 10 CFR Part 55, and is acceptable.
-[
Sincerely, L
Original-signed by:
Theodore S. Michaels, Senior Project Manager Non-Power Reactor, Decomissioning and Environmental Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects-i l
Office.of Nuclear Reactor Regulation DISTRIBUTION Docket file NRC & Local PDRs PDNP r/f WTravers i
EHylton J
TMichaels OGC EJordan ACRS (10)
Plant file
[TM LTR2 LRuby]
k h
PDNP:PM h PDNP:b P
on TMichaels:dmj SWe$ss 2
/90 2/J)/90 2/fy /90
A g
.u m
a
_.,m#
s a--_
m___ - - - - _
1 L
=*
-/pg areg%
UNITED STATES '
I,g -
NUCLEAR REGULATORY COMMISSION 3
-E WASHINGTON, D. C. 20555
{
/
February 27, 1990
....+
'I Docket No. 50-288
[
Dr. Lawrence Ruby, Director Reactor Facility Reed College 3203 SE Woodstock Blvd..
Portland, Oregon 97202
Dear Dr. Ruby:
SUBJECT:
OPERATOR REQUALIFICATION PROGRAM FOR THE REED C0'LLEGE--
TRIGA NUCLEAR REACTOR We have reviewed the proposed operator requalification plan detailed in your letters of July-5,1989 and January 17, 1990. The additional information that was needed to clarify certain aspects of the written examination, opera-i ting test, and on-the-job training, has been added-in'your January 17, 1990 submission. Our review indicates-that the program now meets-the criteria in 10 CFR Part 55, and is acceptable.
Sincerely,
)
o
(
4 heodore S.-
ichae s, Senior Project' Manager Non-Power Reactor, Decommissioning and Environmental Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation i
--