ML20055B793

From kanterella
Jump to navigation Jump to search
Second Interim Rept on Significant Const Deficiency 38 Re Flooding of Emergency Diesel Generator Control & Relay Panel,Initially Reported 811130.Replacement Panels Scheduled to Be Onsite by 820715 & Final Rept Submitted by 820816
ML20055B793
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/14/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-82-0414, W3K-82-414, NUDOCS 8207230305
Download: ML20055B793 (1)


Text

LOUISIANA / 142 DRARONDE STRHT POWER & LiG H T/ P O BOX 6008

  • NEW ORLEANS LOUlstANA 70174 * (504) 366-2345 LTA!#sWO

]; [M@{]$fMgg@p V~~~~ _ '

-1 14,1982 G D. McLENDON L) Senior Vice President l

i JUL 191982 .

l'g,<\

~

_____; W3K 82-0414 Q-3-A35.07.38 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 Subj ec t : Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 38

" Start-Up Test Control; Flooding of Emergency Diesel Generator Control and Relay Pancl" Second Interim Report

Reference:

LP&L Letter W3K 81-0422 to NRC dated November 30, 1981

Dear Mr. Collins:

Replacement panels for the Emergency Diesel Generator are scheduled on site for July 15, 1982. Installation should be complete to allow the final report to be submitted on August 16, 1982.

If you have any questions, please call me.

Very truly yours, GDMcL/LLB/grf

. &. M ' A cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Direc tor Office of Management Information and Program Control U. S. Nuclear Regulatory Commission 4 Washington, D. C. 20555 'p/

f Y

8207230305 820714 PDR ADOCK 05000382 PDR S