ML20055B753
| ML20055B753 | |
| Person / Time | |
|---|---|
| Site: | 05000375 |
| Issue date: | 03/16/1982 |
| From: | ROCKWELL INTERNATIONAL CORP. |
| To: | |
| Shared Package | |
| ML20055B752 | List: |
| References | |
| NUDOCS 8207230260 | |
| Download: ML20055B753 (4) | |
Text
J
.* ss p ****"",
O SUPPORTING DOCUMENT Eaerty S.ystems Gove GONO.
S/ A NO.
PAGE 1 OF TOTAL PAGES REV LgR,/CHg NO NUMBER 94117 4
4 p' (,
N001ER0000ll PROGR AM TITLE L-85 Reactor DOCUMENT TITLE L-85 Reactor - Annual Operations for the Year 1981 DOCUMENT TYPE KEY NOUNS Engineering Report Reactor Operations A
ORIGINAL ISSUE DATE REL.DATE APPROVALS DATE
}'
l)g
} (C $/
J. H. Walte 1
o PREPARED BY/DATE DEPT MAIL ADDR V. A. Swanson 731 T905 f.k c w w~
IR&D PROGR AM) YES O NO O OF VFS ENTF A TP A NO DISTRIBUTION ABST R ACT This report presents a summary of the reactor MA U
NAME gD operations and related activities conducted at
{Lucas,A.J.(25)
LA34 the L-85 Reactor during 1981. This satisfies t Maki, L.M.
NB02 a reporting requirement in the facility technical Paschall, R.K.
LB02 specifications.
Remley, M.E.
NB13 Schumann, G.
T034 lSwanson, V.A.
T905 L Tuttle, R.J.
NB13 FRoberts,W.J.
LA21 RESERVED FOR PROPRIETARY / LEGAL NOTICES G207230260 920720 PDR ADOCK 05000375 R
PDR I
% COMPLETE DOCUMENT NO ASTERISK, TITLE PAGEi
SUMMARY
OF CHANGE PAGE ONLY F O R M 734 C R E V.12 79
.3 e
Rockwellin'temational NO N001ER0000ll Energy Systems Group PAGE 2
TABLE OF CONTENTS SECTION PAGE 1.
SUMMARY
OF OPERATING EXPERIENCE 3
2.
EMERGENCY SHUTDOWN AND INADVERTENT SCRAMS 3
3.
MAJOR MAINTENANCE OPERATIONS 3
4.
CHANGES TO FACILITY AtlD PROCEDURES 3
5.
RELEASE OF RADI0 ACTIVE EFFLUENTS 3
6.
ENVIR0tiMENTAL SURVEYS 4
FORM 71SP REV. 2-80
I Roc,kwellIn'ternational (40
'. N001ER000011 Energy Systems Group PAGE 3
1.
SUMMARY
OF OPERATING EXPERIENCE No operations were conducted during calendar year 1981. The reactor is being maintained in a standby status until a method of fuel disposal is established.
2.
EMERGENCY SHUTDOWN AND INADVERTENT SCRAMS None 3.
MAJOR MAINTENANCE OPERATIONS No major maintenance operations were performed.
Routine maintenance has been performed to assure the integrity of safety circuits and monitoring instruments.
4.
CHANGES TO FACILITY AND PROCEDURES An application to authorize the dismantling of the L-85 Facility, disposal of the component parts, and the voluntary surrender of the facility license is still pending.
No changes have been made to the facility.
Concurrence was obtained from NRC for not performing the Technical Specifications surveillance tests 4.lb, 4.lc, 4.2d(1) and 4.2d(3) with the stipulation that the reactor may not be brought critical or operated without specific authorization from the NRC.
A bi-weekly standby procedure has been implemented for testing instrumentation and safety circuits and for logging instrument readings.
5.
RELEASE OF RADI0 ACTIVE EFFLUENTS No radioactive effluents were released or discharged to the environs.
l F OR M 714P RE V. 2-80
%welllntemational fj0 N001ER000011 EwgyS M Gnmp PAGE 4
6.
ENVIRONMENTAL SURVEYS Environmental surveys are performed by the Radiation and Nuclear Safety Unit by sampling for radioactive analysis the soil, vegation, watcr and air up to'a distance of 10 miles from Energy Systems Group, California sites. A report by J.D. Moore
- describing the monitoring procedures and results for 1981 summarizes these surveys. This report concludes that environmental radioactivity observed by the monitoring is attributable to natural sources and to fallout of radioactive material from foreign atmospheric testing of nuclear devices rather than to Energy Systems Group operations at California sites.
i r
{
i i
l J. D. Moore, " Energy Systems Group Environmental Monitoring and Facility Effluent Annual Report - 1981."