Third Interim Deficiency Rept Re Possible Malfunction in Agastat E7000 Series Time Delay Relay.Replacement Parts Unavailable So Final Rept Cannot Be Submitted by 820715. Final Rept to Be Issued by 821130
ML20055B717
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/15/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-82-0421, W3K-82-421, NUDOCS 8207230181
Download: ML20055B717 (1)


Text

e-I OUISIANA f 242 OuAnONOe s1nar POW E R & LIG H T/ P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345 UrNEs sY

,1

]

l

.j' July 15, 1982

/

1 f

G D. McLENDON R lQR l

Senior Vice President u

W3K 82-0421 Q-3-A35.07.50 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 Subj ect: Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 50 "Possible Malfunction in Agastat E7000 Series Time-Delay Relay" Third Interim Report

Reference:

LP&L Letter W3K 82-0271 to USNRC dated Iby 17, 1982

Dear Mr. Collins:

LP&L stated in the referenced letter that a final report would be submitted by July 15, 1982. Due to the unavailability of replacement parts, the corrective action has not been completed.

Replacement relays have been ordered by Ebasco and are expected on site by mid-October. A Final Report will be issued on this Significant Construction Deficiency by November 30, 1982.

If you have any questions, please advise.

Very truly yours, M

e GDMcL/LLB/grf cc:

1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
2) Director

((

Office of Management Information and Program Control D. S. Nuclear Regulatory Commission Washington, D. C. 20555 8207230181 820715 PDR ADOCK 05000382 S