Text
Db b 8Ed ORICi!TAL E
o BALTIMORE G AS AND ELE,QMI,9 {0MPANY.,
i P.O. SON f 47's.
' ' ',/
sAuimont. uAnyLAno rips Amun E.WWm.
4 m m,
$sme
. June 29,1982-
/
Mr. Ronald C. Haynes, Director Docket No. 30-3!7 Offim cf Inspection and Enforcement License No. DPR-53 U. S. Nuclear Regulatory Commisssion y'
Region 1 l
631 Park Amme Kingof Prussia,PA.19406
,- y 4
SUBJECT:
82-29 Unit 1 4
^
Dear Mr.Haynes:
?
- This letter is to confirm our verbal notification of yorpMriRalph Architzel of the inoperability of both Auxiliary Feedwater Purr.ps while in Mode,7 At 0905 on 6-25-32, U-l entered Mode 3. At $2d, he NRC Resident Irspectx noticed that the handswitches for the Main Steam Isolation
. Valves for the Auxiliary Feedwater Pumps were.iri Pull-to-lock. These handswitches were immediately returned to the normal p6sitio1..
The starty procedure, OP-1, has been modified to kify these handswitches in the normal position. prior to enteriri Mode:3. Abo,.,
Surveillance Test Procedure, STP-0-62 will be modified to re<pire an
~
additional check of these valves prior to entering Mode 3. T#
~
A complete desoiption of this event, including causes and corrective.
action will be addressed in a follow-up report.
r Very truly yours, i
L. B. Russell
' ~ ' "
l Plant Sgerintendcat LBR:fid 4