DESTCNATED ORIG 1NAL 7590-01 CortifiedB[
/
/$--
N ert
,j UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-336 NORTHEAST NUCLEAR ENERGY COMPANY, ET AL.
NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission)has issued Amendment No. 79 to Facility Operating License No. DPR-65, issued to Northeast Nuclear Energy Company, the Conn,ecticut Light and Power Company.,
the Hartford Electric Light Company, and 'the Western Massachusetts Electric Company (the licensee), which revised Technical Specifications for operation of the Millstone Nuclear Power Station, Unit No. 2 (the facility) located in the Town of Waterford, Connecticut. The amendment is effective upon issuance.
This amendment reduces the design reactor coolant flow rate from 370,000 to 362,600 gpm (2 percent r, eduction) and compensates for this re-I duction by reducing the allowable total plana'r and total integrated radial peaking factors by 2 percent. These changes are desirable to improve plant reliability by. compensating for reduced reactor coolant flow after plugging 704 steam generator tubes earlier this year.
The application for the amendment complies with the standards and re.-
quirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made' appropriate l
l findings as required by.the Act and the Commission's rules and regulations l
in 10 CFR Chapter I, which are set forth in the license amend 6.ent.
Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration, i
82072'10125 820702 PDR ADOCK 0S000336 PDR.
.. _.12,...___ f
-.,~.L...
7590-01 2-The Ccanission has determined that the issuance of this amendment will not result in any significant envirnemental impact and that
~
pursuant to 10 CFR 151.5(d)(4) an environmental impatt statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
~~
For further details with respect to this action, see (1) the application for amendment dated June 18, 1982 (2) Amendment No. 79 to License No. DPR-65, and (3) the Commission's relate'd Safety Evaluation.
All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D.C. and at the Waterford Public Library, Rope Ferry Road, Waterford, Connecticut. A copy of items (2) and (3) may be obtained upon request addressed to the U. S.
~ ~
~
Nuclear Regulatory Commission, Washington, D. '. 20555, Attention:
C Director, Division of Licensing.
Dated at Bethesda, Maryland, this 2nd day of July.19821 FOR THE NUCLEAR REGULATORY COMMISSION L.-
ocert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing O