h Commonwealth ECson

/ 72 WIst Ad*ms StrMt, Chicrgo, lihnois O } Addrass R: ply to: Port Offica Box 767 (f

Chicago. Illinois 60690 July 9, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washirgton, D. C.

23555 SURJECT: Zion Station Units 1 and 2 Fuel Management _ Topical Report NRC Docket Nos. 50-295 and 50-304 REFEREICE (a): May 29, 1981 letter from T. R. Tramn to H. R. Denton.

Dear Mr. Denton:

As indicated in Reference (a), Conmonwealth Edison Company (CBCo) personnel met with NRC Staff personnel on May 12, 1981 to discuss CECO's Pressurized Water Reactor (PWR) fuel management capability and the projected contents of CBCo's PWR Fuel Management Topical Report. A schedule for irrplementation of the CBCo program for Zion Unit 1 Cycle 8 in the Sprirg of 1983 was also presented.

Due to an extended outage for stean generator repairs at the end of Cycle 6 this Spring, the Cycle 8 schedule has been delayed six months to the Fall of 1983. CBCo's fuel managanent schedule has also been correspondirgly delayed. Attachnent 1 illustrates the original schedule dates contained in Reference (a) as well as the revised schedule dates.

'Ihis information is being provided at this time to accmmodate the NRC Staff in plannirg its topical report review priorities.

In adhering to this schedule, CECO has inposed nunerous internal schedular constraints. As such, CBCo requests the Staff's concurrence or conments on the revised schedule of Attachnent 1 by September 1,1982.

Please address any questions regardirg this matter to this office.

Very truly yours, Sk hk F. G. Iantine Nuclear Licensing Administrator EUL:WN:Im 0100N Attachment 8207200292 820709 gCD(

PDR ADOCK 05000 P

.. ~ ~

NRC DOCKET Nos.

50-295 and 50-304 ATTACHENT 1 Schedule For Implementation of CECO PWR Fuel Management Program Event Original Date Revised Date CECO meets with NRC to discuss Fuel Management 5/81 plans and Topical Report CEo Design Tasks cmmence on Zion 1 Cycle 8 11/81 5/82 CECO Smmary presentation to NRC of Topical +

3/82 1/83 Results CEo PWR Methodology Topical sulnitted to NBC 3/82 5/83 for review CEo Topical referenced in CBCo Reload "50.59" 1/83 7/83 letter to NHC for Zion 1, Cycle 8

~

NRC Approval of CECO Topical 4/83 10/83

+

Specifically, parameters benchnarked, results of benctuarking, and statistical analyses will be presented.

ID:0100N i