Monthly Operating Rept for June 1982
ML20055A352
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/09/1982
From: Richardson J
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20055A348 List:
References
NUDOCS 8207160190
Download: ML20055A352 (3)


Text

, , -. . -. .

Attachment to AECM-82/319 Page 1 of 3 APPENDIX B .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-416 UNIT 1 D' ATE 7/9/82 COMPLETED BY J. D. Richardson TELEPIIONE 601-969-2630 MONTil June (No power generated) ,

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 17 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27 12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this form, list the average daily unit power Icvel in MWe-Net for each day in the rcporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacityis used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

8207160190 820714 1.16-8 PDR ADOCK 05000416 R PDR

Attachment to AECM-82/319 Page 2 of 3 APPENDIX C OPER ATING DATA REPORT DOCKET NO.

50-416 UNIT DATE 7/9/82 COMPLETED BY J. D. Richardson TELEPHONE 601-969-2630 l

OPER ATING STATUS

1. REPORTING PERIOD:

une GROSS HOURS IN REPORTING PERIOD: 720

- 191 M AX. DEPEND. CAPACITY (MWe Net): N/A

2. CURRENTLY AUTHORIZED POWER LEVEL (MyJU DESIGN ELECTRICAL RATING (MWe-Net):
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
4. RE ASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL .

0 0 0

6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0 O O O
7. HOURS GENERATOR ON LINE 0 0 0
8. UNIT RESERVE SHUTDOWN HOURS .

0 0 0

9. GROSS THERMAL ENERGY GENER ATED JMWH) . . .

0 0 0

10. GROSS ELECTRICAL ENERGY GENER ATED (MWH) . .
11. NET ELECTRICAL ENERGY GENERATED (MWH) . . . . .

0 0 0

12. REACTOR SERVICE FACTOR . . . ..

N/A

13. REACTOR AVAILABILITY FACTOR .. . . . . ... .

N/A

14. UNIT SERVICE FACTOR ,. ... .. ... . .

N/A

15. UNIT AVAILAGILITY FACTOR . .. . ..

N/A

16. UNIT CAPACf TY FACTOR (Using MDC) . . . .

N/A

17. UNIT CAPAglTY FACTOR (Using Design MWe) . . . . .

N/A

18. UNIT FORCED OUTAGE RATE . . . .. . . ..

N/A

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH): N/A -
20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITI AL CR* TICALITY Jul 82 INITI AL ELECTRICITY Nov 82 COMMERCI AL OPE R ATION Feb 83 1.16 9

O APPENDIX D DOCKET NO. 50-416 l

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAMEGrandGulfNuiear seation Unit DATE 7/9/82 COMPLETED BY J. D. Richardson REPORT MONTij June ~TLEPIIONE 601-969-2630 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR N O. DATE S: SCHEDULED (HOURS) RE ASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS  ;

(1) REASON

^ ^' ' '

N/A N/A N/A N/A N/A N/A B: MAthT.OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATORTRAINING AND

-- LICENSE EXAMINATION

$ F: ADMINISTRATIVE

" C: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAlb)

(2) METHOD m>

1: MANUAL j" 2: MANUALSCRAM oD 3: AUTOMATIC SCRAM yh*

4: OTHER (EXPLAth) o@

  • 5 w ,

c o

Y l$

SUMMARY

GGNS Unit I received Facility Operating License No. NPF-13 on June 16, 1982. Initial Fuel Loading O is in progress. No shutdown or power reductions have occurred.