O e
JUL 81982 OPERATING DATA REPORT DOCKET NO.
50-263______
DATE 7-2-82____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS INotes l
- 1. Unit Name : ________________________Monticetto l
l
- 2. Reporting period: ___________________ JUNE l
l
- 3. Licensed Thermal Power (MWt):
____________1670 l
l
- 4. Namep late Rat ing (Gross MWe)- _____________569 l
l S. Design Electrical Rating (Net MWe):
_____545.4 l
l
- 6. Maximum Dependabte Capacity (Gross MWe)
__553 l
l
- 7. Maximum Dependable Capacity (Net MWe):
____525 l__________________________l 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
__N/A_____________________________________________
- 9. Power Level To Which Restricted, If Any (Net MWe):
___N/A___________________
- 10. Reasons For Restrictions, If Any:
__N/A_____________________________________
_____________~________________-_-_______-__________-.._-_--_______-__--_-
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
_____720
_____4343
____ 96432
- 12. Number Of Hours Reactor Was Critical
___720.0
___3901.0
__ 78836.6
- 13. Reactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hours Generator On-Line
___720.0
___3823.4
__ 77033.1
- 15. Unit Reserve Shutdown Hours
_____0.0
______O.0
_______0.0
- 16. Gross Thermal Energy Generated (MWH)
_ 956443
_ 5712717'
_125395059
- 17. Gross Electrical Energy Generated (MWH) __315937
__1913156
__39918533
- 18. Net Electrical Energy Generated (MWH)
__299569
__iO33262
__38176481
- 19. Unit Service Factor
__100.0%
___ 88.0%
____ 79.9%
- 20. Unit Availability Factor
__100.0%
___ 88.0%
____ 79.9%
- 21. Unit Capacity Factor (Using MDC Net)
__ 79.3%
___ 80.4%
____ 75.4%
- 22. Unit Capacity Factor (Using DER Net)
__ 77.9%
___ 79.0%
____ 74.1%
- 23. Unit Forced Outage Rate 0.0%
2.5%
6.0%
- 24. Shutdowns Scheduled-Over Next 12 Months (Type, Date, and Duration of Each)
__ September 1, 1982 - Refueling Outage - 42 days _..________________.._____
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:___N/A__..___
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8207160064 820709 PDR ADOCK 05000263 R
s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263______
UNIT Monticello__
DATE 7-2-82____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JUNE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i
__________480____________
17
__________438____________
2
__________461____________
18
__________436____________
3
__________457____________
19
__________427____________
4
__________458____________
20
__________370__________.._
5
__________454____________
21
__________402_________.___
6
__________277____________
22
...________432____________
7
_.._______466____________
23
________._426____________
8
__________450____________
24
__________424____________
9
__________450____________
25
__________420____________
10
__________408____________
26
__________417____________
11
__________403____________
27
__________344____________
12
__________398____________
28
__________423____________
13
__________234____________
29
__________410____________
14
__________427____________
30
__________412____________
15
__________446____________
31 16
__________436____________
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporwing month.
Compute to the nearest whoie megawatt.
)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263______
DATE 7-2-82____
COMPLETED BY A.
L.
Myrabo TELEPHONE 612/295-5151 HONTH ______ JUNE 6-1-82 to Power operation.
6-30-82 Note: Power operation defined as essentially 100% of rated power except for weekend Load drops for specified surveillance testing.
Unit in end-of-cycle coastdown status.
The unit load-followed extensively throughout the month.
UNIT SliU1 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-263 9
UNil N etE Sbnticolin DATE 6
-R7 REPORI \\1ON fil June C041PLETED BY A. L. Wralm TELEPitONE 612/295-5151
=
=
=_
n-c
\\"
t h:e j;
y
-gj Ligen w
--g -7.,
g3 Cause i Corte,t ne 4
y;~
f.sent
- ~g
- c. !
Action to 5E jf; Report =
,E '"
Present Recurrente i
l 8
6-06-82 S
0.0 11 4
N/A ZZZZ ZZZZZZ Dispatcher requested load reduction.
9 S
0.0 11 4
N/A ZZZZ ZZZZZZ Dispatcher requested load reduction.
6-13-82 I
2 3
4 F Forced Renon.
Method :
Eslubit G - Instruttuis S Schedu!ed A Eqwpment Failure (Explaint
!-Manual for Preparation of Data B-Maintenance of Test 2-Ma..aal Scram.
Entry Sheets for Licensee C Refueling 3-Autonutic Scram.
Event Report t LER) File t NUREG-D-Rc;u!atory Restriction 4-Other ( E splam l 0161)
E-Operator Training & License Eumination F-Ad r: inat rati.e 5
G-Operational Error (Esplain t Eshibit I - Same Source 19!77)
Il-O:her i E splau.)