50320-820714 July 14 1982 0
NOTIFICATION OF EVENT OR UNUSUAL OuCURRENCE--PNO-TMI-82-16 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance.
The information is as initially received without verifi-cation or evaluation and is basically all that is known by NRC staff on this date.
Facility: GPU Nuclear Corporation Licensee Emergency Classification:
Three Mile Island, Unit 2 X
Not Applicable Docket Number 50-320
Subject:
VIDEO INSPECTION OF TMI-2 REACTOR CORE The licensee is commencing preparations today for insertion of a closed circuit television (CCTV) camera into the reactor vessel head through a control rod drive mechanism (CRDM) housing. The evolution will provide the first visual assessment of conditions inside the reactor vessel.
The evolution consists of: (1) Venting of the hot leg piping through the RCS high point vents and placing a nitrogen blanket on the hot legs, scheduled for July 14, 1982.
(2)
Venting of the pressurizer and a selected control rod drive mechanism through which the camera is to be inserted, and start of the partial drain down process of the RCS scheduled for July 15, 1982.
(3) Uncoupling and rei.aval of the CRDM leadscrew, scheduled for July #9,1982.
(4) Insertion of the CCTV camera into the reactor vessel head through the CriDM (leadscrew) opening, scheduled for July 21, 1982.
This process was successfully tested on the TMI-1 reactor core earlier this year.
The NRC TMI Frogram Office staff reviewed and approved the licensee safety analysis for this evolution and the procedures which will be used to conduct it.
Media interest will occur because the licensee plans to issue a press release. The NRC does not plan to issue a press release. The Commonwealth of Pennsylvania was informed.
This PN will be updated as each of the above milestones are completed. The TMI Program Office staff plans to continue monitoring events as they occur.
The NRC TMI Program Office received notification of this occurrence through continuous monitoring of licensee activities. This information was current as of 11:00 AM today.
W(.Wiebe kM
- h. k. fNwyd 590-1134 R. Conte 590-1125 R. Bellamy 590t'1138
Contact:
Distribution:
Phillipsuu.1 E/W geWillste/J:23 Air Rights /hr-H. St. /J:J ~
MNBB Q.a 7
/
Chairman Pal adino EDO NRR IE NMSS ST Comm. Gilinsky PA OIA RES
- 8. Snyder Comm. Ahearne MPA AE0D Comm. Roberts ELD INP0 /J!3/,
MAIL:
Comm. Asselstine NSAC ja:24 DCS Processing-SECY R:I atW' R:II /J 39 R:III/3 ADM:DMB ACRS R:IV e R:V OELD:
CA J. Tourtellotte POR DOT:(Trans. Only) 8207160058 820714 PDR I&E PNO-TMI-82-016 PDR Ae__.J'/