June 3, 1982 FACILITY: lladdam liekk Plant LICEliSEE: C0firiECTICUT i Af1KEE AT0lilC POWER COMPAf1Y
SUBJECT:
MEETING SU!iMARY,fiAY 13, 1982 MEETIr1G BETWEEN tiRC STAFF AND CONNECTICUT YA!iKEE ATOMIC POWER COMPANY (CYAPC0) ON APP 8NDIX R FIRE PROTECTION FOR THE HADDAM fiECK PLAliT On Thursday, May 13, 1982, a meeting was held with representatives of CYAPCO. The purpose of that meeting was so that the licensee could explain and clarify its March 1, 1982 submittal on Appendix R - fire protection for the !!addam Neck Plant. The list of attendees is.
The licensee briefly discussed the 1978 fire protection SER, gave an overview of their !! arch 1,1982 submittal, discussed cable types in the Haddam Neck plant and briefly discussed their concept of customized administrative controls. An example of these is provided in Enclosure 2.
The bulk of the presentation concerned a detailed discussion of the 15 fire zone exemption requests from Appendix R that were contained in their itarch 1 submittal. Whera appropriate, these discussions were supplemented with. slides taken inside the various fire zones of the plant. Copies of the viewgraphs accompanying the presentation are provided in Enclosure 3.
The fiRC staff requested the licensee to provide to them, within 60 days, several additional pieces of information concerniag many of the fire zones; including such things as detailed sketches of areas where they fail to meet Appendix R, test reports on cable coatings, etc. The licensee felt that he could respond to these requests within 30 days.
Within this same 30-60 day period the fiRC staff will be preparing their official response to the 15 exemptions to Appendix R requested by Connecticut Yankee Atomic Power Company.
<E6/
Original signed by s
gu@g(ci Cheryl G. Tropf, Project Manager Operating Reactors Branch #5 Division of Licensing
Enclosures:
As stated cc w/ enclosures:
See next page 8207140208 820603 PDR ADOCK 05000 vw 0FHCE)
...h.h...f.h.... b fhh..
.h.b,...hdk..h.5...
ou- > cT.r.omcc..0 oC e i.iaio IWa.mb.ac.h.......
..c.6.l.d.1...(1.e...... 6b/.G....
om>
7 OFFICIAL RECORD COPY uso - -m uo Nac ronu sis omem uscu om
.s.
MEETIfG StN ARY DISTRIBUTI0tl Docket ilRC PDR Local PDR ORD Reading flSIC DCrutchfield HSraith CTropf OELD OIt.E ACRS (10)
SEPB BShields DKubicki RFerguson VPanciera TWambach FHolan REberly
!! Conner SVarga DEassallo.
RClark JStolz cc list OFFICE) sunnme >
...... ~... ~. ~....
~ ~ ~ -. ~ ~.
~.. ~ ~.. ~ ~ ~.
~ ~ ~ ~ ~.....
-... ~ ~ ~ ~
om>
.................... ~
.. ~..... ~. ~.....
~ "... ~ ~ ~ ~
~~.~ ~~-
~
-. ~
. ~ ~ ". * ~ ~ -
OFFICIAL RECCIRD COPY usom e-mm
- NRC FORM 318 (1080) P4RCM 0240
~
Mr. W. G. Counsil June 3, 1982 cc Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Superintendent Haddam Neck Plant RFD #1-Post Office Box 127E East Hampton, Connecticut 06424
. Mr. Richard R. Laudenat Manager, Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut 0Ffice of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06115 U. S. Environmental Protection Agency Region 1 Office ATTN:
Regional Radiation Representative JFK Federal Building Boston, Massachusetts 02203 Resident Inspector Haddam Neck Nuclear Power Station
.c/o'U. S..NRC East Haddam Post Office East Haddam, Connecticut 06423 Ronald C. Haynes, Regional Administrator Nuclear Regulatory Commission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 4
4 e
I.
4
..c 1
LIST OF ATTENDEES NRC CYAPC0 C. Tropf J. Roncaioli B. Shields T. Patrizz D. Kubicki G. Pitman R. Ferguson R. Kacich V. Panciera M. Cass
. T. Wambach N. Bdenett F. Nolan M. Whitelaw R. Eberly B.Tuthill M. Conner 1
4 i
f g
i
)
9 a
\\
)
1 r
+
- VT"'-"
F e - MN s-g=-e..w,,-._p.-..
,_wm m__ _,,,,,,. _, _,,, _ _ _
Enclosura 2 j
ADMINISTRATIVE CONTROLS
~ *
~~
~
FLAMMABLE LIQUID CONTROL Flammable liquids in volumes greater than 1/2 pint shall be restricted from the control room, cable vault, cable l
spreading room and switchgear room except under the following conditions:
i 1.
Written permission is obtained from the Supervising I
Control Operator or the Shift Supervisor 2.
The flammable liquids.are contained in a suitable container not to exceed one quart in volume, and 3.
A dedicated fire watch yith the proper fire fighting equipment is assigned to the activity.
1 h
- /
l i
t I
e k1 s',
N
-}
.'j,
+3" c
.\\.
r
,e 6
r,
. No t e : ' This (tem is intend,cd to' provide for reporting of potentially generic problems.
7 e.
,1 7,
/
,[
b' Thirty Day. Written' Reports.,The reportable occ a rences discussed below shall bo the.hubject of
~.
'4
'vritten reports t'o the' Director of tN appr.opricch Regional-Office'vithin thirt9 days of occurrence n,f the event.
The written report shall include, es..a minimum, a completed ;
^
l, '
ropy of a licenisce event report form..Information provided -
's /
on the licensee event report form shall be supplenented, si needed, by additional narrative caterial to provide
~
couplete explanation of the circumstances surrounding the-
,", event.
s a r, ; ' (1)
Reactor protection system or engineered safety feature instrument settings which are found to be less conserv-arive t,han those established by the technical specifica-tions but which do not preyent the fulfillment of the functional requirements of affected systems.
(2)
Conditions leading to operation in'3,d,cgraded mode permitted by a limiting condition for operation or plant shutdown requircd by a limiting condition for operation.
Note:
Routinc/ surveillance testing, instrument calibration, or preventative maintenance uhich require system.
configurations as described in items 2.b(1) and 2.b(2) i necd.not be reported except where test results themselves
, reveal a degraded modo as describe;d above.
O'bserved inafcquacies in the impicmentation,of admin-(3) istrative or procedural controls which threaten to
{
l causc reluction of degreci of redundancy provided in reactor protection systeed or engineered safety feature l
a.ystems.
i (4)
Abnormal degradation *of systems other than those '.
specified in item 2.a(3) above designed to contain radioactive material resulting from the fission process.
Note:
Sealed sources or calibration sources are not included under this item.
Lgakage of valve packing or gaskets a
'within the limits for identified leakage set forth in technical specifications need not be reported under i
this item.
(5) Unauthorized introduction of greater than 1/2 pint of flammable h
liquids into the control room, cable vaulc, cable spreading room, or switchgear room.
l 6-20 mm. m
.a
~
i i
5 FIRE PROTECTION - APPENDIX R
~
HADDAM NECK PLANT MEETING AGENDA - MAY 13, 1982 I
o INTRODUCTION
^
COMPLIANCE WITH 1978 SER o
o OVERVIEW 0F MARCH 1, 1982 SUBMITTAL o
CABLE TYPES AND SEPARATION l
o CREDIT FOR CUSTOMIZED ADMINISTRATIVE CONTROLS o
DISCUSSION OF EXEMPTIONS o
. CONCLUSIONS I
l
,. -.. -. -.. _ ~.
,,a
CHRONOLOGY OF COMPLIANCE 1978 SER HADDAM NECK PLANT I
OCTOBER 3, 1978 FIRE PROTECTION SER ISSUED LICENSE CONDITION o
COMPLETE 19 ITEMS PRIOR TO STARTUP FROM 1980 REFUELING o
PROVIDEADDITIONALINFORMATIONBYJULY1,1979 o
DEFER ALTERNATE SHUTDOWN SYSTEM EVALUATION AND DESIGN TO THE SEP JULY 19, 1979 REVISED JULY 1, 1979 DATE TO JULY 31, 1979 JULY 31, 1979 PROVIDED ADDITIONAL INFORMATION IN ACCORDANCE WITH SER PROVIDED SCHEDULE FOR ALTERNATE SHUTDOWN SYSTEM FEBRUARY 22, 1980 FIRE PROTECTION SER SUPPLEMENT 1 MAY 29, 1980 ADDITIONAL INFORMATION IN P.ESPONSE TO SUPPLEMENT 1
-,n
~
NOVEMBER 24, 1980 o
APPENDIX R PROVIDED TO LICENSEES
~ ~
~
o ALTERNATE SHUTDOWN SYSTEM EVALUATION AND DESIGN SCHEDULE SUPERSEDED BY SECTION III.G AND III.L 0F APPENDIX R
~
FEBRUARY 6, 1981 o
FIRE PROTECTION SER SUPPLEMENT 2 NOVEMBER 11, 1981 EXEMPTION GRANTED FOR OIL COLLECTION SYSTEM, SER ITEM 3.1.18 MARCH 1, 1982 REVIEW 0F COMPLIANCE WITH APPENDIX R, ALTERNATE SHUTDOWN SYSTEM EVALUATION e
e 9
APPENDIX R REVIEW MARCH 1, 1982 o
INTRODUCTION
~
o PROBABILISTIC RISK ASSESSMENT o
CLARIFICATION OF TECHNICAL ISSUES ASSOCIATED CIRCUITS LOSS oF oFFSITE POWER HIGH/ low PRESSURE SYSTEM INTERFACE RESPONSE To G.L. 81-12 con' Trol ROOM EXEMPTION l
o METHODOLOGY OF FIRE PROTECTION EVALUATION o
SAFE SHUTDOWN DISCUSSION o
SAFE SHUTDOWN CONCEPT o
FIRE ZONE ANALYSIS o
COMPLIANCE SCHEDULE l
i m
_-.. _ - _ =
o APPENDICES A.
PRA REPORT
~
B.
REPAIRS OF EQUIPMENT FOR COLD SHUTDOWN C.
SAFE SHUTDOWN SYSTEM DESCRIPTIONS t
l D.
FIRE ZONE LAYOUT l
E.
FIRE ZONE / CABLE ROUTING l
l V
l I.
SYSTEMS REQUIRED FOR HOT
^ ~
~~
~
~
SHUTDOWN - NO 0FFSITE POWER 0
SERVICE WATER PUMPS / VALVES i
O CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING PUMP RWST VALVES 0
DIESEL GENERATOR AND ASSOCIATED EQUIPMENT 0
MAIN STEAM ATMOSPHERIC DUMP VALVES MSI,V MAIN STEAM SAFETY VALVES STEAM TO AUX FEED PUMP O
AULILIARY FEEDWATER SYSTEM TURBINE PUMPS PWST DWST VALVES 0
INSTRUMENTATION PRESSURIZER LEVEL
~
PRESSURIZER PRESSURE STEAM GENERATOR LEVEL PRIMARY TEMPERATURE (TH OR INCORE T/C)
SOURCE RANGE NEUTRON MONITOR
SYSTEMS REQUIRED F0, COLD R
SHUTDOWN - NO 0FFSITE POWER RESIDUAL HEAT REMOVAL SYSTEM
_o SERVICE WATER PUMPS / VALVES o
DIESEL GENERATOR AND ASSOCIATED EQUIPMENT o
CHEMICAL AND VOLUME CONTROL SYSTEM o
CHARGING PUMP RWST VALVES o
INSTRUMENTATION PRESSURIZER LEVEL PRESSURIZER PRESSURE STEAM GENERATOR LEVEL PRIMARY TEMPERATURE (IH OR INCORE T/C)
SOURCE RANGE NEUTRON MONITOR L
PROBABILISTIC RISK ASSESSMENT I
OBJECTIVES OF QUANTITATIVE EVALUATION o
DETERMINE THE VULNERABILITY OF THE PRESENT DESIGN OF THE PLANT IN ACHIEVING SAFE SHUTDOWN AFTER A POSTULATED FIRE.
o DETERMINE INDIVIDUAL IMPROVEMENTS WHICH WOULD RESULT IN REDUCTION OF FIRE VULNERABILITY.
o QUANTIFY THE REDUCTION OF FIRE VULNERABILITY THAT WOULD RESULT FROM INDIVIDUAL MODIFICATIONS.
o SELECT THOSE IMPROVEMENTS WHICH REDUCE THE FIRE VULNERABILITY TO ACCEPTABLE LIMITS WITH MINIMAL IMPACT ON PLANT SAFETY AND OPERATIONS
ELEMENTS OF METHODOLOGY o
MODELING - TO DETERMINE VULNERABILITY OF THE PLANT TO FIRES.
o FIRES - INITIATION AND SEVERITY USING EVENT TREES o
PLANT - COOLING SYSTEM COMPONENTS, POWER CABLES, CONTROL CABLES, AND PLANT OPERATORS USING FAULT TREES o
DATA BASE:
BASED ON DOMESTIC NUCLEAR POWER PLANT EXPERIENCE, PROVIDE FREQUENCY OF FIRE OCCURRENCE, FIRE SEVERITY PROBABILITIES, AND RELIABILITY DATA FIRES:
NUREG/CR-2258 RELIABILITY' DATA:
WASH 1400 IEEE-500
RESULTS OF PRA EVALUATION
~
MEAN FREQUENCY PER REACTOR YEAR OF FAILURE TO ACHIEVE
~
SAFE SHUTDOWN DUE TO A POSTULATED FIRE:
CURRENT AFTER CONFIGURATION MODIFICATIONS OVERALL PLANT 6.5 x 10-4 7,9 x 10 -6 e
e I
COMPLIANCE / EXEMPTION
SUMMARY
1.
FIRE ZONES CURRENTLY COMPLYING (5)
I 1
2.
FIRE ZONES F0k WHICH COMPLIANCE IS PROPOSED (6) 3.
FIRE ZONES EXEMPTION REQUESTED (7) l DIESEL FORWARDING FUEL OIL PUMPS 11.
FIRE ZONES EXEMPTION REQUESTED (8) l l
l l
s-
CABLES / SEPARATION o
ORIGINAL PLANT CRITERIA CABLES I
SEPARATION o
IMPROVEMENTS MADE SUBSEQUENT TO STARTUP DIESEL GENERATORS (AREAS D-1 a D-2 MEDIUM VOLTAGE SWITcHGEAR (AREAS D-1 & D-2)
CONTAINMENT CABLE / SEPARATION (AREA R-4)
CABLE VAULT CABLE / SEPARATION (AREA R-1)
IEEE STANDARD 383 QUALIFIED CABLE (ALL NEW WORK)
CHARGING PUMP POWER CABLE FIRE RETARDANT COATINGS o
REROUTE OF INSTRUMENTATION CABLING o
SWITCHGEAR ROOM MODIFICATIONS
,--m.
w
.,e.
-.-,,,.e-,
r.
y
ADMINISTRATIVE CONTROLS
.o WRITTEN PERMISSION FROM SHIFT SUPERVISOR OR SUPERVISING CONTROL OPERATOR
~
o FLAMMABLE LIQUIDS MUST BE CONTAINED IN SUITABLE CONTAINERS o
CONTAINER VOLUME OF ONE QUART o
DEDICATED FIRE WATCH WITH THE PROPER FIRE FIGHTING EQUIPMENT WILL BE ASSIGNED TO ACTIVITY o
SIGNS WILL BE POSTED AT ALL ENTRANCES TO THE FIRE ZONES i
IDENTIFYING RESTRICTIONS ON FLAMMABLE LIQUID TRANSPORT o
30-DAY LER IF UNATHORIZED FLAMMABLE LIQUIDS ARE INTRODUCED e
CONTAINMENT FIRE PROTECTION FEATURES 0
DLTECTION IN LOOP AREA O
DETECTION IN ELECTRICAL PENETRATION AREA O
PHYSICAL SEPARATION DISTANCE CONCRETE WALLS 0
SAFETY RELATED CABLES IN CONDUIT
~
O OIL COLLECTION SYSTEM PROPOSED MODIFICATIONS 0
INSTALL CURB / DIKE IN LOOP AREA e
SCREENWELL PUMP HOUSE FIRE PROTECTION FEATURES o
DETECTION 0
PUMPS A & D ARE 23' APART O
CABLES ARE IN CONDUIT 0
NO INTERVENING COMBUSTIBLES PROPOSED MODIFICATION
~
0 ENCLOSE SERVICE WATER PUMP WITH CURB / DIKE O
ENCLOSE CABLE RUNS FOR TWO SERVICE WATER PUMPS NOTE:
APPLICATION OF WATER SPRAY IN PUMP AREA COULD DAMAGE THE PUMPS (OPENED CASED VENTILATION) e e
n-.
SERVICE WATER CABLES / MEN'S LOCKER ROOM FIRE PROTECTION FEATURES o
CABLES ARE COATED WITH FLAMMATIC o
ENCLOSED BY TWo LAYERS OF 5/8" GYPSUM BOARD o
SATISFY SER ITEM 3.1.15 o
SPRINKLER PROTECTION EXEMPTION REQUESTED o
TWENTY F00T SEPARATION REQUIREMENT e
S
AUXILIARY FEED PUMP ROOM FIRE PROTECTION FEATURES 0
PUMPS ARE 21' APART 0
NO INTERVENING COMBUSTIBLES O
LIMITED ACCESS PROPOSED MODIFICATIONS 0
INSTALL DETECTION 0
EXTEND FIRE WATER LOOP TO OUTSIDE AREAS 0
INSTALL HYDRANT HOSE STATION NEAR ENTRANCE NOTE:
APPLICATION OF WATER SPRAY COULD DAMAGE STEAM PUMPS 7
e e
0
SWITCHGEAR ROOM FIRE PROTECTION FEATURES 0
TOTAL FLOODING HALON SYSTEM 0
DETECTION 7
O LIMITED ACCESS 0
LIMITED COMBUSTIBLES 0
CABLES MEET IEEE-383 STANDARD PROPOSED MODIFICATIONS 0
RELOCATE 1 BATTERY BANK 1 CHARGER AND DC BUS 2 STATIS INVERTERS 2 CHANNELS OF INSTRUMENTATION O
PROVIDE REDUNDANT PROTECTION AND DETECTION TO 480 VOLT LOAD CENTER AND MCC 5 0
IMPLEM' INT CUSTOMIZED ADMINISTRATIVE CONTROLS
CABLE SPREADING AREA FIRE PROTECTION FEATURES o
LIMITED ACCESS LAEDER MEZZANINE AREA o
SPECIALLY DESIGNED SPRINKLER SYSTEM 0
CABLE AND FLAMMASTIC
. PROPOSED MODIFICATION r,
REDUNDANT SPRINKLER SYSTEM FOR HALLWAY 0
CUSTOMIZED ADMINISTRATIVE CONTROLS o
REROUTE Two CHANNELS OF INSTRUMENTATION CABLES ONE RHR PUMP CABLE MOV 373 CABLE e
4 4
d
i CONTAINMENT CABLE VAULT FIRE PROTECTION FEATURES 0
LIMITED ACCESS 0
DOUBLE SHOT CO2 PROTECTION I
O DETECTION O
LIMITED FIx COMBUSTIBLE O
SAFETY DIVISIONS IN CONDUIT - IEEE-383 0
CABLE SEPARATION O
CABLE LOCATED LOW TO FLOOR >
PROPOSED MODIFICATION O
CUSTOMIZED ADMINISTRATIVE CONTROLS 6
m
CONTROL ROOM,
FIRE PROTECTION FEATURES o
RESTRICTED AREA o
LIMITED COMBUSTIBLES o
CONTINUOUSLY MANNED 0
DETECTION o
NO HIGH OR MEDIUM POWER CABLES o
PORTABLE EXTINGUISHERS PROPOSED MODIFICATION o
CUSTOMIZED ADMINISTRATIVE CONTROLS t
e-l l
p c--
- - - - - -. - - - - - -