ML20054M672
| ML20054M672 | |
| Person / Time | |
|---|---|
| Issue date: | 07/12/1982 |
| From: | Schwink W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Committee To Review Generic Requirements |
| References | |
| NUDOCS 8207140190 | |
| Download: ML20054M672 (3) | |
Text
r-
?,
y JUL 121992 tiOTE TO: CRGR Members Enclosed is a copy of the CRGR activities monthly report for the period fiay 28, 1982 through July 2,1982. The report will be included in the ED0's Weekly Report to the Commission for the week s
ending July 9,1982.
u
[
a Walt Schwink DEDROGR Staff 1
Enclosure:
As stated t
~
Distribution:
VStello TEMurley DEDR0GR cf Ce'ntral File
^
POR (NRG/CRGR)
DEDROGR Staff w
8207140190 82071 l
PDRREvCPNRGCRck PDR Q'
I id S;.,,.61
.e,ncr>...D..E..D..R..O..G..R../.S.....
R./.S./.0 sua m > Mchninluh9.
.ydex....
..U.1.2.l.82........U&f.8.2.....
om>
sac ronu ais omem sacu cao OFFICIAL RECORD COPY uscro. mi--mm
r- --
DEPUTY EXECUTIVE DIRECTOR FOR REGIONAL OPERATIONS & GENERIC REQUIREMENTS (DEDROGR)
Week Ending July 9,1982 CRGR The Committee to Review Generic Requirements (CRGR) did not meet between May 28,1982 and July 2,1982.
Open items from previous CRGR meetings are listed on the attached, as requested by the Commission.
O
.~.n...
P12344h3 NUCLEAR R EGUL ATO R T COMMISSION MAT 27 1982 PAGE 2 Of 2 COMMITTEE TO R EVIE'd 3
GENERIC PEQUIREMENTS
.** oPEN ITEnS Fn0d PREVIOUS MEETINGS
- e
{
LI En N O 1I13 DESCPl[ TION:
A L&lfEI_CPGP ST8CES:
810001 IE BULLETIN ON ELASTOMEPS (VITCN) USED IN ASCO 02/17/82 PETURNED TO IE 11/25/81 FDP P E ASSESSMENT OF NP-1 VALVES SAFETT DENEFITS: TO DE SESUDMITTED TO CDGR i
AFTER PEASSESSMENT.
s OP.IG OFC: IE C ATDG OR T: 2 IT LA PLCD: 11/13/01 CPGR REVIEW I
l e. e e e e e...................................... e.................... e...........
COMPLETED:
(ACTION: I E)
J
...e............e.......e...........................
I 810006 QU ALITY ASSURANCE P30CEDUP ES AT NPPS O2/17/82 REQUESTED (12/14/P1) FUTRRE CBGP PEVIEW UDEN REQUIRE 5ENTS ARE DETTER DEFIN ED*.
ORIG OFC: IE C ATEGOR Y: 2 ITr.5 RECD: 12/10/81 CPGP DEVIEW: 12/10/81 COMPLETED:
( ACTIO N : IE
.eeeeee.........................................................................................................
D20014 PROPOSED POST CP CliA NG C RULE 02/2e/92 DEQUESTED FUTURE CRCP PEVIEW WHEN STAFF WORK NAS BEEN COMPLETED.
ORIG OFC: R ES CATEGODT: 2 ITEM PECD: 01/20/82 CRGE D E VIEW:
02/24/82 COMPLETED:
ACTION RES es es se e. ee ee.. e. ee ee ee e e..ee.e.e.e ee ee e. ee.e e e e e ee 820017 DRArt REGnLATORY A N ALYSIS PR OC EDU9 ES 03/17/02 SEVERAL SUGGESTIONS WEPE MAEE TO A DM REGADDING THE DRAFT PPOCEDUFF.S.
FURTilEP CBGR REVIEW WAS REQUESTED.
071G OFC: A DM CAT EGOR Y: 2 ITEM D ECD:
03/10/82 CRGR R E VI E W':
03/17/82 COMPLETED:
ACTION oseeeeee.............................................e..........................................................(ee.....:.ADn) ee 9
0 e
a e
,