Forwards Public Version of Page 7.9 to Emergency Plan Committing to post-accident Primary Sys Sampling Sys Personnel Training & Identifying Site That Could Be Used in Event of large-scale Emergency Response
ML20054M662
Person / Time
Site: Maine Yankee
Issue date: 06/23/1982
From: Garrity J
Maine Yankee
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), Office of Nuclear Reactor Regulation
Shared Package
ML20054M661 List:
References
JAG-82-110, MN-82-119, NUDOCS 8207140159
Download: ML20054M662 (2)


Text

.

.g 0

AUGUSTA A NE

%)W (207) 623-3521 O

June 23, 1982 MN-82-119 JHG-82-110 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

- Washington, D.C.

20555 and Regional Administrator U.S. Nuclear Regulator / Commission 631 Park Avenue Kiry of Prussia, Pennsylvania 19406

References:

(a) License No. DPR-36 (Docket No. 50-309)

(b) MYAPCo Emergency Plan dated December 31, 1980 (c) MYAPCo Letter MN-82-63 to USNRC dated March 29, 1982 (d) MYAPCo letter MN-82-108 to USNRC dated June 3, 1982

Subject:

Maine Yankee Emergency Plan and Revised Commitment for Post Accident Primary System Sampling System' Personnel Training

Dear Sir:

Pursuant to 10 CFR 50.54 (q), please find enclosed the appropriate number of copies (ten (10) copies for tRR, three (3) copies for Region I) o' a page revision to Refererce (b).

This revision is to include in the emergercy plan a site that could be l

used by an expanded support organization in the event of a large scale Iemonse to an emergerry.

i This letter also revises our commitment for procedures and training for I

the new post accident sampling system (completed by June 26, 1982). The procedures are complete but the personnel training will not be completed by June 26, 1982 as we had previously anticipated.

j 8207140159 s20706 fDRADOCK 05000309 PDR

,n

--n - y - _,

MAINE YANKEE ATOMIC POWEO COMPONY Director of Nuclear Regulation June 23, 1982 and Page Two Director, Region I, Office of Inspection and Enforcement In Reference (d) we explained that the post accident sampling system is not operable because of manufacturer repair to certain components. We are attempting to have this system operable as soon as possible but no later than the end of the 1982 refueling outage. Once the system becomes operable, training will be implemented on the system's operation. It is anticipated that this training will be completed by January 1,1983.

If you have any questions on this information, please contact us.

Sincerely yours, MAINE YAM (EE ATOMIC POWER COMPANY f

John H. Garrity, Senior DiId: tor Nuclear Engineering & Licensing JHG:pjp Enclosure - Page 7.9 - Rev. to Emergency Plan l

E o