ML20054M658

From kanterella
Jump to navigation Jump to search
Confirms Correctness of NRC 820303 & 04 Evaluations for SEP Topic III-8.A Re Loose Parts Monitoring & Core Barrel Vibration Program.Need to Implement Program Will Be Determined During Integrated Assessment
ML20054M658
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 07/06/1982
From: Cagnetta J, Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-03-08.A, TASK-3-8.A, TASK-RR AO2334, NUDOCS 8207140141
Download: ML20054M658 (1)


Text

,

c.n. rot onic.. e s u.n ser..,, B.rno, conn.ceicu, gggeg ggggg 3

C.Zl,Y,CT"!r~

IEn *ro*n'o'. conscencur osiot C :::::,:::."' ::"*~

(2m> unsen L

L J ;:1.'K'2::::::

July 6, 1982 DOCKET NO. 50-213 50-245 M2334 Director of Nuclear Reactor Regulation Attn:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch #5 U. S. Nuclear Regulatory Commission Washington, DC 20555

References:

(1)

D. M. Crutchfield letter to W. G. Counsil March 4, 1982.

(2)

J. J. Shea letter to W. G. Counsil dated March 3, 1982.

Gentlemen:

Haddam Neck Plant Millstone Nuclear Power Station, Unit No. 1 SEP Topic III-8.A, Loose Parts Monitoring and Core Barrel Vibration Program Via References (1) and (2), the Staf f forwarded the evaluations for SEP Topic III-8.A, Loose Parts Monitoring and Core Barrel Vibration Program for the Haddam Neck Plant and Millstone Unit No. 1. Connecticut Yankee Atomic Power Company (CYAPCO) and Northeast Nuclear Energy Company (NNECO) have reviewed References (1) and (2) and determined that they are factually correct. The need to implement a Loose Parts Mon-itoring Program at either facility will be determined during the Integrated Assessment.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY CONNECTICUT YANKEE ATOMIC POWER COMPANY Jhf s

W. G. Counsil I

~

Senior Vice President 1*

A (Ar t By[J. /. Cagnett' gRu714cI42 Y'

I ADUCKofhj Envfr onmental Engineering p

PDR