ML20054M616

From kanterella
Jump to navigation Jump to search
Forwards TR-5633-2, Initial Status Rept Independent Design Review for Shoreham Nuclear Power Station, Technical Rept
ML20054M616
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/09/1982
From: King J
TELEDYNE ENGINEERING SERVICES
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20054M617 List:
References
5633-13, NUDOCS 8207140050
Download: ML20054M616 (2)


Text

-

"RTELEDYNE ENGINEERING SERVICES 130 SECOND Abf NLE Vb ALTH AM MASSACHUSETTS 02254 i6t h 830 3350 TA x 1710) 324 7580 Mr. Harold R. Denton July 9, 1982 Office of the Nuclear Reactor Regulation 5633-13 United States Nuclear Regulatory Comission Washington, D.C. 20555

Subject:

Independent Design Review for the Shoreham Nuclear Power Station

Dear Mr. Denton:

Enclosed please find sixty (60) copies of Teledyne Engineering Services' (TES) Technical Report TR-5633-2 entitled " Initial Status

Report, Independent Design Review for the Shoreham Nuclear Power Station" dated July 9, 1982.

If you have any questions or coments concerning the enclosed please contact Donald F. Landers, Senior Vice President, or the writer.

Very truly yours, TELEDYNE ENGINEERING SERVICES

%AM Jame King Assi t t Project Manager JPK/ao Enclosures cc:

M. Milligan (LILCO)

J. Smith (LILCO)

E. Montgomery (LILC0)

D. F. Landers (TES)

J. H. Malonson (TES)

G. Moy (TES) l TES Document Control I'l%d 8207140050 820709 PDR ADOCK 05000322 A

PDR ENGINEERS AND METALLURGISTS

TF M

@ Transmittal-Please Sign and Return Acknowledgement O Request for Information (RFI)

When Requested Assign Control Number Page_L,of 1 O Receipt (TES Use Only)

Control No.

Originator James P. Kina Transmit To: Mr. Harold R. Denton Project No.

5633 Off. of Nuclear Reactor Req.

Dato July 9, 1982 U.S.N.R.C.

363981 Washington D.C. 20555 Client PO Transmitted Under Separate Cover To:

Mr. M. Milligan LILC0 NOTE: Furnish complete identification for items transmitted (below).

O U

QTY TYPE ITEM IDENT NO.

REV DESCRIPTION - Title and Number of Sheets / Panes N

TR-5633-2

" Initial Status Report Independent Design Review 60 of Shoreham Nuclear Power Station."

ACKNOWLEDGEMENT OF RECEIPT BY TITLE DATE DISPOSITION FOR PREVIOUS REVISIONS O Return to TES O Mark Void O Destroy O Uncontrolled NOTE TO ADDRESSEE: Unless stated otherwise the listed items are furnished to you as Controlled

- Documents. Please sign and return the number 2 copy to:

TELEDYNE ENGINEERING SERVICES 130 Second Avenue Waltham, Massachusetts 02254 Attention: Document Control, Project RAl1 DISTRIBUTION: 1 and 2-Addressee 3-Document Control 4-Originator / Project Manager 4/81

TN

@ Transmittal-Please Sign and Return Acknowledgement O Request for Information (RFI)

When Requested Assign Control Number Page_1_of 1 Receipt (TES Use Only)

Control No.

Originator James P. Kina Transmit To: Mr. Harold R. Denton Project No.

5633 Off. of Nuclear Reactor Req.

July 9, 1982 U.S.N.R.C.

D:te 363981 Washington D.C. 20555 Client PO Mr. M. Milligan LILC0 Transmitted Under Separate Cover To:

NO'TE: Furnish complete identification for items transmitted (below).

9Uw QTY TYPE ITEM IDENT NO.

REV DESCRIPTION - Title and Number of Sheets /Paoes T

TR-5633-2

" Initial Status Report Independent Design Review 60 of Shoreham Nuclear Power Station."

e l

ACKNOWLEDGEMENT OF RECEIPT BY TITLE DATE DISPOSITION FOR PREVIOUS REVISIONS l

C Return to TES Mark Void Destroy Uncontrolled NOTE TO ADDRESSEE: Unless stated otherwise the listed items are furnished to you as Controlled D_ocuments. Please sign and return the number 2 copy to:

TELEDYNE ENGINEERING SERVICES 130 Second Avenue Waltham, Massachusetts 02254 Attention: Document Control, Project Em DISTRIBUTION: 1 and 2-Addressee 3-Document Control 4-Originator / Project Manager 4/81

_