ML20054M523

From kanterella
Jump to navigation Jump to search
Forwards Proposed IE Bulletin Re Alteration of Radiographs of Welds in Piping Subassemblies.Requests That Crbr Review Be Expedited as Category I Requirement Under Provisions of III D of CRGR Charter
ML20054M523
Person / Time
Issue date: 03/09/1982
From: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20054M514 List:
References
82-035, 82-35, NUDOCS 8207130545
Download: ML20054M523 (1)


Text

.,

v, 4

? A escy 4

4 UNITED STATES h-)

/4

[

\\

NUCLEAR REGULATORY COMMISSION e-E WASHINGTON, D. C. 20555

\\

j R2-053 MAR. S 1982

/

MEf10RANDUM F6R: Victor Stello, Deputy Executive Director for Regional i

Operations and Generic Requirements, EDO FROM:

Richard D. DeYoung, Director, Office of Inspection and Enforcement

SUBJECT:

PROPOSED IE BULLETIN-ALTERATION OF RADIOGRAPHS OF WELDS IN PIPING SUBASSEMBLIES y

Enclosed for yogi' information is a copy of a draft of the subject proposed IE Bulletin, As soon as we receive and resolve comments from the various NRC offices,we will be submitting the bulletin for CRGR review.

We intend to request an expedited _CRGR review as a Category I requirement under the provisions of III D of the TRGR Charter. The urgency for action is based on the potential. safety significance of initiating operation at affected NT0L's before resolving que.stionable weld radiographs.

Resolution of this issue is required before a determination can be made that the affected facility has been

~

constructed substantially in accordance with NRC requirements and the application.

)

R l

Ri hard C. DeYoun Dir c r l

0,f ice of Inspection and Enforcement

Enclosure:

Draft IE Bulletin cc:

J. Sniezek, IE E. Jordan, IE t

R. Baer, IE J. Collins, IE

~

8207130545 820310 PDR REVQP NRCCRGR PDR 1

i