ML20054M516
| ML20054M516 | |
| Person / Time | |
|---|---|
| Issue date: | 06/18/1982 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Wahl H BECHTEL GROUP, INC. |
| Shared Package | |
| ML20054M517 | List: |
| References | |
| REF-QA-99900501 NUDOCS 8207130538 | |
| Download: ML20054M516 (2) | |
Text
_
i
,s
. = =
- f
'/
t JUN 1 8 Docket No. 99900501/82-01 Bechtel Phwer Corporation Ann Arbor Power Division e
ATTN: Mr. H. W. Wahl
~
Vice President and General Manager 777 East Eisenhower Parkway t
Ann Arbor, Michigan 48106 Gentlemen:
This refers to the inspection conducted by Mr. J. R. Costello of this office on May 3-6, 1982, of your facility at Ann Arbor, Michigan, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
Areas examined during this inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examina-tion of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, we found no instance where you failed to meet the commitments of your Topical Report No. BQ-TOP-1 or NRC requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe'to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established.
Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information shculd be withheld from public disclosure.
This section further requires the statement BC:VPh D:IESq[
RA:RIV
~
CI RSS
/
SC:RSS JRCostel rf CJHale UPo a vs EHJohnson JTColb s 6/11/82 6/11/82 6/ \\ /82 6/i S/82
- //f/ 2t
$N &f926 9207130530" B20618 PDR GA999 EECBECH t Ig 99900501 PDR ILL
)
Bechtel Power Corporation to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information. sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Uldis Potspovs, Chief Vendor Program > Branch
Enclosures:
1.
Appendix B - Inspection Report No. 99900501/82-01 2.
Appendix C - Inspection Data Sheets (6 Pages) bec:
IE Files AE0D i
QAB NRC:PDR l
Reg. Administrators, I, II, III, IV, V i
EHJohnson, RIV i
l l
r l
[
l I
I i
L-