Forwards Response to NRC 820607 Request for Addl Info Re Environ Qualification of safety-related Electrical Equipment.Util NUREG-0737 Positions Which Have Been Accepted by NRC Identified
ML20054M444
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/08/1982
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.A.2, TASK-2.E.4.2, TASK-2.F.1, TASK-2.K.3.16, TASK-2.K.3.18, TASK-2.K.3.21, TASK-2.K.3.24, TASK-2.K.3.25, TASK-2.K.3.45, TASK-TM IEB-79-01B, IEB-79-1B, NUDOCS 8207130242
Download: ML20054M444 (3)


Text

.

4 PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 SHIELDS L. DALTROFF

""'"" " " " ~

July 8, 1982 Docket Nos. 50-277 50-278 Mr. John F. Stolz, Chief Operating Beactors Branch #4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stolz :

Your letter of June 7, 1982 to Mr. E. G. Bauer forwarded a Request for Additional Information (RAI)'regarding environmental qualification of safety related electrical equipment at Peach Bottom Units 2 and 3 (RAI-C5257-493 Rev. 4 and 494 Rev. 4, both dated May 28, 1982).

As per the instructions contained within the RAI, the requested information is being forwarded directly to Mr. C. J.

Crane at Franklin Research Center.

The requests are restated below followed by our Bl. Reference 1 does not provide adequate detail with respect to identification of TMI Action Plan equipment installed after 1/1/81.

Response :

Reference 1, in the Request for Additional Information, I

was not intended to identify TMI Action Plan equipment installed after 1/1/81. Please refer to our letter of l January 30, 1981 ( S. L Daltroff to B. H. Grier regarding D

l ,

i 8207130242 820708 PDR ADOCK 05000277 P PDR

, e Mr. John F. Stolz, Chief Page 2 IE Bulletin 79-01B Supplement 3), which is listed in your request as Reference 2, which forwarded Component Evaluation Worksheets (CEWS) and states "Each CEWS for TMI Action Plan items is identified by TMI-(MOD # xxx)."

B2. The qualification documents, e.g., the actual test reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified TMI Action Plan equipment are requested.

(The identification of those reports considered to be proprietary is requested so that proper control of documents can be maintained.)

Response :

1. Target Rock Corporation Test Report 2302C, submitted to FRC in August 1981.
2. Rockbestos Firewall III Cable Report, Rev. 1, 3 79; submitted to FRC in August 1981.
3. Rosemount Test Report 3788; not yet submitted to FRC; copy forwarded per this request.
4. General Atomic Test Report on Class IE Analog High Range Radiation Monitors E-254-960, Rev. 2; not yet j

submitted to FRC; copy forwarded per this request.

l i S. Columbia Labs.- Acoustic Monitor Sensor; test being conducted by Wylie Laboratories; test report due 1-83.

6. NDT, Inc. Acoustic Monitor Pre-Amp; test being conducted by Wylie Laboratories; test report due 1-l 83.

I B3. Where the Licensee has a standard Owners' Group position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this

, information is requested in order to incorporate it into the review.

Mr. John F. Stolz, Chief Page 3 Response :

Philadelphia Electric has endorsed the BWR Owners' Group positions on the following NUREG-0737 item.

II.K.3.16 Reduce challenges to safety-relief valves II.K.3.18 Automatic Depressurization System actuation logic II.E.4.2(5)* Containment pressure setpoint II.K.3.21* Restart of Emergency Core Cooling System logic II.K.3.24 HPCI/ FCIC Spare Cooling II.K.3.25 Power on pump seals II.K.3.45 Manual Depressurization Our positions on. items noted with an asterisk have been accepted by the Commission. The remaining items are pending NRC review.

The only uncompleted NUREG-0737 items for which we have requested a schedule implementation change are as follows:

a. II. A.2. Meteorological System - requested a January 1, 1983 completion date,
b. II.F.1(6) Containment Hydrogen Monitor - Requested that the environment qualification of the hydrogen monitor be performed in accordance with the schedule applicable to our efforts in response to IE Bulletin 79-01B.

If thera are any further questions, please do not hesitate to contact me.

Sincerely,

,/ l/ 4

,$ "l 'f cc: Mr. C. J. Crane Franklin Research Center The Parkway at Twentieth St.

Phila., PA 19103 C. J. Cowgill - Site Inspector