PHILADELPHIA ELECTRIC COMPANY 23ol M ARKET STREET P.O. BOX 8699 PHILADELPHIA, PA 19101 SHIELDS L. DALTROFF
~
~
July 8, 1982 Docket Nos. 50-277 50-278 Mr. Darrell G.
Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
NUREG-0737, Item II.F.1(5), Containment Water Level Monitors, Peach Bottom Atomic Power Station - Unit 3
Dear Mr. Eisenhut:
This letter updates the status of our efforts to install wide range containment water level monitors on Peach Bottom Unit 3 in accordance with the requirements of NUREG-0737, Item II.F.1(5).
The information was requested by the NRC Project Manager in a July 7, 1982 telephone conversation.
As of July 6, 1982, both channels of the new containment water level monitoring system were complete and in-service on Unit 3.
Additionally, a similar system has been installed on Peach Bottom Unit 2 as previously noted in correspondence dated June 23, 1982 ( S.
L.
Daltroff, PECo. to D.
G.
Eisenhut, N RC ).
Therefore, we are in compliance with the requirements of NUREG-0737, Item II.F.1(5).
Should you have any questions regarding this matter, please do not hesitate to contact us.
Very truly yours,
/
A dTW cc:
C.
J.
Cowgill - Site Inspector O
i 8207130056
~
fDRADOCKO hs PDR
.