Updates Status Re Installation of Wide Range Containment Water Level Monitors in Accordance W/Requirements of NUREG-0737,Item II.F.1(5),per 820707 Telcon
ML20054M385
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/08/1982
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM NUDOCS 8207130056
Download: ML20054M385 (1)


Text

PHILADELPHIA ELECTRIC COMPANY 23ol M ARKET STREET P.O. BOX 8699 PHILADELPHIA, PA 19101 SHIELDS L. DALTROFF

~

~

July 8, 1982 Docket Nos. 50-277 50-278 Mr. Darrell G.

Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

NUREG-0737, Item II.F.1(5), Containment Water Level Monitors, Peach Bottom Atomic Power Station - Unit 3

Dear Mr. Eisenhut:

This letter updates the status of our efforts to install wide range containment water level monitors on Peach Bottom Unit 3 in accordance with the requirements of NUREG-0737, Item II.F.1(5).

The information was requested by the NRC Project Manager in a July 7, 1982 telephone conversation.

As of July 6, 1982, both channels of the new containment water level monitoring system were complete and in-service on Unit 3.

Additionally, a similar system has been installed on Peach Bottom Unit 2 as previously noted in correspondence dated June 23, 1982 ( S.

L.

Daltroff, PECo. to D.

G.

Eisenhut, N RC ).

Therefore, we are in compliance with the requirements of NUREG-0737, Item II.F.1(5).

Should you have any questions regarding this matter, please do not hesitate to contact us.

Very truly yours,

/

A dTW cc:

C.

J.

Cowgill - Site Inspector O

i 8207130056

~

fDRADOCKO hs PDR

.