f OPERATING DATA REPORT
[t DOCKET NO.
50-335_
DATE _ Juno A; 1982 COMPLETED BY
.1 Pard.l.) o y
TELEPliONE -(203)-447-1791
{
OPERA IING S TATUS
}
t Items 22 and 21 I. Unit N4me: _ 44i n stone-2 2 !!c portin; Period: __May._1987 Cumulative are a weighted ave.
- 3. Licenwd Thennal Power (\\lWt):
2700 Unit operated at 2560MW prior
)
- 4. Nameplate Rating (Grins \\!Wel:
909 to uprating to its current S. Design Electrica! Rating (Net atWe):
R7n 2700MW thermal power level.
- 6. Mnimum Dependable Capacity (Gross MWeh 895
- 7. Masimum Dependable Capacity (Net MWe):
864
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Lesel To which Restricted,if Any (Net MWe):
Njg
- 10. Reasons For Restrictions. If Any:
N/A This Month Yr..to.Date Cumulative'
- 11. Ilours in Reporting Period 744 1623 56375
- 12. Number Of Ilours Reactor Was Critical 74a 1908_a a049s 7 3
- 13. Reactor Resene Shutdown llours 0
1R 6*
'9115:5*
- 14. Ilours Generator On-Line 744 1729.4 38730.9'
- 15. Unit Reserve Shutdown llours 0
0
'468.2~
- 16. Gross Thermal Energy Generated (*-.Hj 19R2946.
_..4362244.7 K '8192.
- 17. Gross Electrical Energy Gener6u itWil) 655050._______. --.
la3s17n*
21_ a 4666R*
- 18. Net Electrical Energy Generated '.,1Wil) 632011 R 1966450.4*
'301116A2*
- 19. Unit Senice Factor 100.0 47.1 68.7
- 20. Unit Asailability Factor 100.0 42 l 6M
- 21. Unit Capacity Factor (Using MDC Net) 9L3_ _
43J 64 2
- 22. Unit Capacity Factor (Using DER Net) 97.6 43.4 63.2
- 23. Unit Forced Outage Rate 0.0 7n 20.2
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Each1:
N/A l,
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior o Commercial Operation):
Forecast Achiesed INITIA L CRI flCA LITY
_li/A
,._f{ /A.
INiflAl ELECIRICITY
_H/ L N/A-CO\\l\\lERCI A L Ol' ERA IlON N/A N/A-Corrects minor math errors in April 1982 Report 8207090247 820608 PDR ADOCK 05000336 R
AVf P. 4GE D AILY L* NIT l'Ob ER LEVEL DochET NO. _ Sn_13A UNIT Millstone 2 DATE.innn R 1982 CO'.1PI.ETED BY L_Parillo TELEPHONE _f.203) 447 1791 Ext 4419 MONTH
__.May lS89 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY f OWER LEVEL WWe Net) 0;we. Net )
I 729 17 860 2
Ran is 860 3
858 19 858 4
859 858 yo s
R60 23 856 6
R61 22 856 7
860 856.
23 8
860 24 854 9
834 25 855 to, R60 26 820 11 862 27 831 12 862 28 RE4 13 861 29 RSS 14 861 30 812 15 861 31 853 16 860 INSTRUCTIONS On this faimn.liit the neNIe daily uni: p.m er leselir..'. We. Net for ca:h day in the repunin; mar.th. Compute to '
- he r.tsiest whole mepwait.
('8 0 7 )
i
l UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKi'N0 Co W UN;T N A3;E HiiIstone 2 DATE
<luno R.
109?
COli'll'.::D!!Y
.1 -
Parillo REPORT MONTil Mw loo?
TEl...*J ION E
(?O3) 447-1791 Ext 4419 5.5
.) _;
?
p._s 3 Liccinec 15";,
=
5%,
E Cause & C.i etaive y
y" -
gdie 6.~
A,non in l
f 'f 7,
7E 4
2 ; a:
Even:
~7 l'reveut Recurrence l
- 3. 5 j5 RcP"'I "
1 I
10 820501 S
0.
B N/A N/A HH Instru Power reduction to 70% to correct Heater Drain Pump control valve problem and clean Condenser water boxes.
11 820509 S
0.
B N/A N/A HF Htexch Power reduction to 90% for mussel l
cooking in Condenser g
12 820526 F
0.
A N/A N/A XX Instru Power reduction to 85% as a result of I
process computer failure. A failed circuit card was replaced and full power operation was resumed.
i 8
13 820530 S
0.
B N/A N/A HF Htexch Power reduction to 90% to clean Condenser water boxes i
l 1
('l/77 )
Date
.1,mo s. 1 opp 4
Unit Name
)
.. m -+ m Completed By J.' Paciffo Telephone r 9nu 447_,7o, CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month nw 1999 DATE SYSTEM' COMPONENT MAINTENANCE ACTION l
May 3, 1982 ESAS GR-7 Actuation Mo'dule in Cabinet 5 Replace l
l May 4, 1982 ent e closure ard nment purge fire c'amper Replace fusable link l
May 6, 1982 Containment Structure Outer door gasket on personnel acce is Replace hatc.h Service Water "B" Service Water pump Remove, overhaul and reinstall 1
i May 7, 1982 Station Electrical Micro Switch in 4.16KV Breaker Reolace A-306 on "A" Service Water oumo May 10. 1982 ESAS Channel "B" Bistable module BA208 Reolace Process and Area Rad Hiah Ranae Stack Monitor Reolace circuit card Monitors Service Water 2-SW-97A valve ooerator Replace sheared ein May 11. 10R9 Service Water "B" RBCCW Heat Exchanaer Replace hanger on Service Water relief discharae line May 17-24 Service Water "B" Service' Water Pumo motor Disassemble. clean.insoect and reassemble May 25. 1982 Station Electrical A 502 Breaker. "B" Service Replace UT fuse holder Wa'ter pump O
e
Docket N3.
50-336 Date:
anno n ions Completed By: J. J. Parilin Telephone: (203) 447-1791 X 4419 REFUELING INFORMATION REQUEST 1.
Name of facility:
Millstone 2 2.
Scheduled date for next refueling shutdown:
Comenced refuel outage April 16, 1983.
3.
Schedule date for restart following refueling:
June 4, 1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments.
5.
Scheduled date(s) for submitting licensing action and supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
217' (b) 288 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, t
in number of fuel assemblies:
667 9.
The projected date of the last refueling that can be discharged to the spent f
fuel pool assuming the present licensed capacity:
~iS85, Spent Fuel Pool, full core off load capability is reached.
i 1987, Core Full, Spent Fuel Pool contains 648 bundles.
l l
l i