ML20054M006
| ML20054M006 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 06/15/1982 |
| From: | Pace P FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20054L998 | List: |
| References | |
| NUDOCS 8207090145 | |
| Download: ML20054M006 (9) | |
Text
.
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
50-250 UNIT Turkey Point 3 DATE IllM i " F COMPLETED BY P. Pace TELEPilONE
-(305)552-3654 s
MONTli May 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)
.(gwe. Net!
I 678 679 g7 2
6R4' 18 681
- I 3
687 39 595 4
691 20 496 693 573 5
yg 6
696 22 674 7
698 679 23 v..
8 644 24 679 9
696 25 674 10 690 677 26 II AAA 27 679 33 690 681 28 13 692 426 39 691 14 15 514 33 16 673 INSTRUCTIONS On this fonnai, he the nerage daily unit power leselin MWe-Nei for ca:h day m the reporting inanth. Compute :o the nearest who!e vpwatt.
19/771 C
0 R
I n
OPERATING DATA REPORT DOCKET NO. 50-250 ___
DATE dud D N COMPLETED BY. P pen TELEPHONE (305)S52-3654 OPERATING STATUS
{yit3operatedat S
- 1. Unit Name:
Turkey Point 3 May 1982
- 2. Reporting Period:
essentially full power
- 3. Licensed Thermal Power (MWt):
2200 except for the outages
- 4. Nameplate Rating (Gross MWe):
760 as shown'in'the 693 unit shutdown report.
S. Dnign Electrical Rating (Net MWe):
680
- 6. Maximum Dependable Capacity (Gross MWe):
646
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
NA None
- 9. Power Level To Which Restricted,if Any (Net MWe):
NA
- 10. Reasons For Restrictions.If Any:
This Month Yr. to-Date Cumulative 744 3623 83 168.6
- 11. Hours In Reporting Period
- 12. Number Of flours Reactor Was Critical 681.1 1 195.7 56 955.8 0
0 844.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 673.6 1 111.3 55 002.3 0
0 121.8
- 15. Unit Reserve Shutdown Hours 1 476 098 2 381 674
-111 579--229
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 480 040,_,
770 190 35 463 815 456 743 722 662 33 544 328
- 18. Net Electrical Energy Generated (MWH) 19.' Unit Service Factor 90.5 30.7 66.1
- 20. Unit Availability Factor 90_5 30.7 66.3 j
- 21. Unit Capacity Factor (Using MDC Net) 95.0 30.9 62.4 88.6 28.8 58.2
- 22. Unit Capacity Factor (Using DER Net) 9.5 9.4 5.2
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
None I
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION 19/771 n o -
n_
J
c UNil 5"UTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-250 UNIT NAAf E Turkey Point 3 DATE June 15, 1982 REPORT MONTil May 1982 COMPLETED BY P.
Pace TELEPtIONE (305) 552-3654
?
~
.{ g 3
4 Y 5-Licensee 3 r,,
h Cause & Corrective Date i
52 p
.s ~ 5 Event bb (7
@T Action to f5 y
jgg Report :
- v. O gV Prevent Recurrence 6
07 82-05-15 F
4.5 A
3 EB XXXXXX Reactor trip caused by loss of power tc the Rods due to problems with the Control Rod Drive MG sets. The problems are still being evaluated.
08 82-05-19 F
2.3 A
3 EB RELAYX Reactor trip caused by an inadvertent opening of the RCP breaker while maintenance was in progress.
09 82-05-20 F
8.5 A
3 EB XXXXXX Reactor trip caused by loss of power to the rods due to prob] ems with the Control Rod Drive MG sets. The problem is still being evaluated.
10 82-05-29 F
55.1 A
1 250-82-07 CP PUMPXX Unit removed from service to repair reactor coolant pump oil leak.
Outage continued to repair snubber on the S/G blowdown drain line.
1 I
2 3
F: Forced Reason:
4 Method:
S: Scheduled A Equipment Failure (Explain) 1 Manual Exhibit G. Instructions B. Maintenance of Test for Preparation of Data 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatie Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction QOther (Explain) 0161)
E Operator Training & License Examination F Administrative Y ~ O ' #' ""#
G. Operational Error (ExplainI 5
(9/77) li-Other (Explain) c. 4 e a o a t o w.v..et Exhibit i. Same Sourec l
i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-251 UNIT _ Turkey Point 4 DATE COMPLETED BY ~
o nar o TELEPilONE (305)552-3654 s
MONTH May 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe-Net)
. (MWe. Net)
I 658 37 675 2
680 679 gg 679 680 3
19 678 678 4
20 680 5
672 6
682 668 22 7
680 670
~3 450 %
673 g
24 9
676 663 25 674 668 10 6
II 675 27 672 12 680 675 2S 682 672 I3 14 6R0 30 669 IS 678 668 3
679 16 i
INSTRUCTIONS On this forinat.hst the average daily unit power leselin Mwe. Net for : h d y in the reporting snanth. Compute to the nearest whi>!e inegawart.
(9/771
OPERATING DATA REPORT DOCKET NO.
50-251 DATE JUN 1 F 1982 COMPLETED BY P.
Pace TELEPl!ONE (305) 55_2-3654 OPERATING STATUS Turkey Point Unit 4 Notes
- 1. Unit Name:
Unit 4 operated at
- 2. Reporting Period:
May 1982 essentially full power
- 3. Licensed Thermal Power (MWt):
2200 except to the outage
- 4. Nameplate Rating (Gross MWe):
760 listed in the unit 693 shutdown report.
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
690 646
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr to-Date Cumulative 744 3623 768(36
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 744 3444.1 57423.2
- 13. Reactor Reserve Shutdown flours 0
0 166.6
- 14. Hours Generator On Line 738.6 3396.7 55481.1 0
0 31.2
- 15. Unit Reserve Shutdown Hours
- 16. Gros. Thermal Energy Ge'nerated (MWH) 1619081 7443356 116659979 521225 2395685 37117752
- 17. Gross Electrical Energy Generated (MWH) 496 614 2 277 936 35 166 714
- 18. Net Electrical Energy Generated (MWH) 99.3 93.8 72.2
- 19. Unit Service Factor 99.3 93.8 72.2
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using-MDC Net) 103,3 97.3 70.8 96.3 90.7 66.0
- 22. Unit Capacity Factor (Using DER Net) i
.4 1.0 2.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachl:
Steam Generator repair program, October 1982, 9 months.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY INITI A L ELECTRICITY COM\\f ERCIAL OPER ATION (9/77) e
UNITSIIUTDOWNS AND POWER REDUCTIONS DOCA ET NO.5n m UNIT NA3f E T"*YF " -i DATE JUN 151982 i
REPORT Af 0 NTH May 82 COMPLETED BY P.L.
Pace TELEPIIONE f305) 552-3654
"'=
v.2.:
-=
.i ?
g 4,3 X Licensee
,Eg j '^u Cause & Corrective No-ILie i
5?
4 iss Event si b F7 f-?
Action to f
5 35=
Report =
'E C EV Prevent Recurrence f
G C
10 82-05-08 F
3.1 A
1 IIA HTr.XCll The unit was removed from service to repair a leaking cooling line in the turbine generator exciter.
11 82-05-08 F
0 B
5 IIA IITEXCII The unit'was operated at a reduced load for 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to dry out the exciter following the cooling line repair.
I 2
3 F: Torced Reamn:
4 Method:
S: Schedu!ed A. Equipment Failure (Explain)
I 4f anual Exhibit F Instructions B Maintenance of, Test for Preparation of Dars 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatie Seram.
Event Report (LER) File (NUREG.
D Regulatory Restriction
$0ther (Explain) 0161)
E-Operator Training & License Examination F Admunstrative p
G Operational Error (Explain) 5 (9/77) li Other (Explain) s
/.e ao,e.4cw.,..r/
Exhibit H. Same Source
~
\\
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-335 UNIT St. Lucie 1 j
DATE JU.\\' 1 = 1982 COMPLETED BY P.
Pace TELEPilONE (305) 552-3654 s
MONTil May 1<382 DAY AVER AGE DAILY POWER I.EVEL DAY AVER AGE DAILY POWER LEVEL iMWe Net)
-(MWe-Net) 1 g-840 00 2
gg 841 3
39 4
840 20 5
644 6
22 7
23
..v.
8 108 24 9
821 25 10 26 gg
- 840 8M 12 23 I3 840 29 I4 841 30 15 M
3, 16 INSTRUCTIONS On this forinat. !n' the netage daily unit power leselin MWe Net io: sa:h day in the reporting month. Con;pute to the neafett WIiole "Pg1WJf f, (9/77)
I
OPERATING DATA REPORT DOCKET NO. 50-335 DATE JUN 1 F 1992 COMPLETED BY P.
Pace TELEPilONE (305) -552-3654 OPERATING STATUS St. Lucie Unit 1 Notes
- l. Unit Name:
May 1982 Unit 1 operated essentially
- 2. Reporting Period:
at full Power except for a 27
- 3. Licensed Thermal Power (MWr):
steam generator inspection g9 I
- 4. Nameplate Rating (Gross MWe):
outage.
'See Unit shutdown 830
- 5. Design Electrical Rating (Net MWe):
report.
862
- 6. Maximum Dependable Capacity (Gross MWe):
817
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:-
None
- 9. Power Level To Which Restricted,if Any(Net MWe):
- 10. Reasons For Restrictions,if Any:
A This Month Yr to-Date Cumulative 744 3623
-47711
- 11. Ilours in Reporting Period 301.4 3180.4 38009.8
- 12. Number Of flours Reactor Was Critical 0
0 205.3
- 13. Reactor Reserve Shutdown licurs 297.2 3158.2 37171.1
- 14. Ilours Generator On-Line 0
0 39.3
- 15. Unit Reserve Shutdown flours 768 617 8 413 176 91 737 095
- 16. Gross Thermal Energy Ge'erated (MWil) n 252 920 2 759 300 29 817 415
- 17. Gross Electrical Energy Generated (MWil) 236 099 2 614 307
'28 093 854
- 18. Net Electrical Energy Generated (MWil) 39.9 87.2 77.9 li
- 19. Unit Service Factor ll, 39.9 87.2 78.0
- 20. Unit Ava!! ability Factor 38.8 91.0 75.7
- 21. Unit Capacity Factor (Using MDC Net) 38.2 88.7 73.3
- 22. Unit Capacity Factor (Using DER Net) 0 0
5.1 l
- 23. Unit Forced Outage Rate l
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Each):
i I
l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status lPrior to Commercial Operation):
Forecast Achiesed l
j INITIA L CRITICALITY i
INITIA L ELECTRICITY COM\\lERCI A L OPERATION 19/771 no - s 1
50-335 UNITS!!UTDOWNS AN!s POWER REDUCTIONS DOCKET NO.
UNIT NAME
.st. Lucie 1 DATE _ JUN.15 mR9 REPORT MONTH May 82' COMPLETED BY r
7-na-n TELEPHONE (305) 552-3654 e.
[
E
~
}?
3
$ $5 Licensee
~g Cause & Corrective W.
DJte
}
i 3=
4
.:se Event 12 b
?
f-?
Action to A_ E 35g Report :
CL 5'
Prevent Recurrence l
e O
5 01 82-05-05 S
446.9 B
1 HB HTEXCH Unit removed from service for steam generator inspection,. Outage extended for maintenance of reactor coolant pump seal.
I 2
3 F: Forced Reason:
4 Method:
S: Sched uled A. Equipment Failure (Explain) 1-Manual Exhibit G. !nstructions IbMaintenance of Test for Preparation of Data 2-Man ual Seram.
Entry Sheets for Licensee C-Refueling 3 Automatie Scram.
Event Report (LER) File (NURFG.
D Regulatory Restriction Cl Other (Explain) 0161)
E Operator Training & License Examination F Administrative Y ~ 0 """""
(9/77)
. G Operational Error (Explain) 5 li Other (Esplain)
,v _ /.o a o sr cove.w.et Exhibit ! Same Soaree
.