December 10, 1981 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report United States Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of November, 1981.
Very truly yours,
{
e Ji J. Carey, Vice President Nuclear Division Enclosures cc:
NRC Regional Office, King of Prussia, PA hq\\</
V pd 8207090077 811210 PDR ADOCK 05000334 R
v o
c
.n DUQUESNE LIGHT COMPANY Beaver Valley Power Station NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE-NOVEMBER, 1981 November 1 Station in Operational Mode 1 at nominal 90% power for fuel conservation, through November 15 November 16 Station in Operational Mode 1 at n ninal 90% power.
Between 0535 hours0.00619 days <br />0.149 hours <br />8.845899e-4 weeks <br />2.035675e-4 months <br /> and 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> the load was increased to nominal full power by request of the system operator.
November 17 Station in Operational Mode 1 at nominal full power.
through November 25 November 26 Station in Operational Mode 1 at nominal full power. Between 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> through on the 26th and 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on the 27th the load was reduced to nominal 90%
November 27 power for fuel conservation.
November 28 Station in Operational Mode.1 at nominal 90% power.
through November 30 l
i
+
I i
l'
0 DUQUESNE LIGHT COMPANY f
Beaver Valley Power Station MAJOR SAFETY-RELATED MAINTENANCE-NOVEMBER 1981 1.
Seals replaced on the refueling water storage tank recirculation pump QS-P-2A.
2.
Primary drains transfer pump (DG-P-1A) replaced with a spare pump due to an electrical short in the motor.
3.
- 2 rod drive motor generator set shutdown to replace generator inboard bearing.
I I