OPERATING DATA REPORT DOCKET NO. 50-293 DATE 06/09/82 COMPLETED BY.
G.
G. Whitney TELEPHONE A17 7AA-7900 OPERATING STATUS Pilgrim I Notes
- 1. Unit Name:
- 2. Reporting Period:
May, 1982 1998
- 3. Licensed Thermal Power (MWt):
678
- 4. Nameplate Rating (Gross MWe):
655
- 5. Design Electrical Rating (Net MWe):
690
- 6. Maximum Dependable Capacity (Gross MWe):
670
- 7. Maximum Dependable Capacity (Net MWe):
- 3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
'Ihis Month Yr to.Date Cumulative 744.0 3623.0 83063.0
- 11. Hours In Reporting Period 703.9 1350.4 57383.7
- 12. Number Of Hours Reactor Was Critical
- 13. React < r Reserve ShutdowTi Hours 0.0 0.0 0.0
- 14. Hours Generator On.Line 679.9 1128.9 55406.8 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 1198176.0 1849224.0 94667112.0
- 16. Gross Thermal Energy Generated (MWH) 414360.0 635770.0 31547004.0 17 Gross Electrical Energy Generated (MWH) j
- 18. Net Electrical Energy Generated (MWH) 399189.0 611774.0 30306258.0 91.4 31.2 66.7
- 19. Unit Service Factor
- 20. Unit Availability Factor 91.4 31.2 66.7 80.1 25.2 54.5
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 81.9 25.8 55.7 8.6 12.5 10.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Unit Operatinst
- 26. Units in Test Status t Prior to Commercial Operution):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8207090024 820609 PDR ADOCK 05000293 (4/77)
R PDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-293 UNIT Pilgrim I DATE 06/09/82 COMPLEED BY G. G. Whitney TE1.EPHONE 617-746-7900 MAY, 1982 MONTH DA'l AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net 1 (MWe-Net) 665.
667.
1 37 666.
2 661.
18 662.
332.
3 39 662.
20 4
663.
542.
y
,3 663.
664.
6 529.
665.
,3 7
665.
474.
S 74 469.
9 655.
,3 472.
658.
26 10 470.
666.
,7 g3 470.
389.
,3 12 0.
470.
13 39 309.
14 30 631.
493.
g5 33 665.
16 r
INSTAL'CTIONS On this format. list the average dady unit power levelin MWe Net for each day in the reporung month. Campute to the nearest whole meg 2 watt.
i /77) 0
-w
l 50-293 UNIrSilU1 DOWNS AND POWER REDUCTIONS DOCKET NO-UNIINAME Pilgrim I DATE 06/09/82 COMPLETED ilY C. G-Ubirney REPORT A10 Nill MAY TELEPilONE 617-746-7000
% -n =E
.a E E
7 ~s ;1 Licensee g-t, g"1 c
er c
Cause & Currective E,
Action to No-Ihte R
E8 2
5 Event ay l
g$ E E
3@g Report,,
,p 0 gu Present Recurrence H
u
- o 21 82/05/12 F
40.7 A
3 N/A IA INSTRU Reactor scram caused by defective ATWS trip unit found during ATWS high risk test.
Trip unit repaired.
22 82/05/19 F
23.4 A
3 N/A HA INSTRU Reactor scram due to APRM high flux when turbine ran back caused by failed temperature sensing unit for stator cooling.
23 82/05/23 FG 0.0 A
5 N/A HH PUMPXX B Condensate pump failed. New pump being installed.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Inst ructions S: Scheduled A.Equipruent Failur.e (Explain)
I Manual for Preparation of Data B. Maintenance or Test 2-Manual Scram.
Entry Shects for I.icensee C-Refueling 3-Autunistic Scrain.
Event Reporn (Ll!R) File (NURI G.
D Regulatory Resitiction 4-Other (Explain) 0161)
E.Operatur Training A License Examination F Adeninistrative 5
G. Operational 1:rror (Explain)
Exhibit I - Same Source 19/17)
II Other (Explain)
SUMMARY
OF OPERATIONS FOR MAY 1982 s
May 1, the unit was on the line operating at 98% power. Commencing Fby 3, reactor power was trimmed on the low tide to maintain condenser JST below 32* F.
On May 12, at 1403 hours0.0162 days <br />0.39 hours <br />0.00232 weeks <br />5.338415e-4 months <br />, the reactor scrammed while performing high risk testing on the ATWS System.
Front panel checks were performed and condenser was backwashed. On May 13, commenced a reactor start-up and before critcality was reached, the reactor scrammed while performing maintenance on the ATWS System. Reactor was brought critical at 2052 on May 13.
On May 14, at 0643, the unit was synchronized to the grid and power increased to 50%.
Continued raising power to 80%, then reduced to 50% to adjust rod pattern.
On May 15, while increasing power, experienced oscillations on the EPR.
Continued to increase power to 98% which was reached on May 16.
May 19, the reactor scrammed on APRM hi flux when turbine ran back due to stator cooling temperature problems. The reactor was brought critical on May 19 at 2108 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02094e-4 months <br />.
While bringing unit up, condenser was backwashed, mode switch to run at 0031 on May 20.
May 20, at 1118 hours0.0129 days <br />0.311 hours <br />0.00185 weeks <br />4.25399e-4 months <br />, unit was synchronized to the grid. On May 23, "B" condensate pump failed, power was reduced to 60%, then increased to 70%.
May 30, backwashed and heat treated condenser and power increased to 75%.
Safety / Relief Valve Challenges for May, 1982 Report Requirement: TMI T.A.P. 11.K.3.3 No challenges reported for the month of May, 1982.
PILCRIM NUCLEAR POWER STATION Month of MAY, 1982 MAJOR SAFETT RELATED MAINTENANCE SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE CORRECTION ACTION TO ASSOCIATED LER #
PREVENT RECURRENCE 29 E SSWP Vibration Unbalanced Balanced N/A -
B 13 1301-17 Packing
.. Packing Backseat N/A Blowing Leaking
}
(
29 A SSWP Vibration Unbalanced Balanced N/A 82-12/03L-0 Unbalanced (
^ """"
^
29 D SSWP Vibration 13 1301-16
, Backseat Trouble shooting high dry temp.
Valve no problem 23 2301-5 Blowing Packing Backseat N/A Leaking
- E" 61
'A' diesel Would not Component
" Tack Pak" N/A 82-12/03L-0 29 E SSWP N/A Cutlass Install bearing was support N/A j
worn bracket 33 Motor Did not meet 150%
Worn Rebuilt driven Flow Test re-Internals pump N/A fire pump quirements (1) Procedural Code acceptance criteria may be more restrictive than vendor recommendations.
(2) Review procedure to determine if revision is required to make it consistent with vendor recommendations.
I
~
REFUELING INFORMATION The following refueling information is included in the Monthly Rep' ort as
~
requested in a letter to Mr. G. C. Andognini dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that o
each number corresponds to equivalent notation utilized in the request.
1.
The name of this facility is Pilgrim Nuclear Power Station, Docket Numb'er 50-293.
2.
Scheduled date for next Refueling Shutdown:
Sep tember, 1983, l
3.
Sche'duled date for restart following refueling: November, 1983 4.
5.
Due to their cimilarity, requests 4, 5, & 6 are responded to collect'ively:
6.
The fuel, which had been loaded during the 1981 scheduled refueling outage, is of the same P8x8R design, as loaded the previous outage con-sisting of 112 P8DRB282 assemblies and 60 P8DRB265 assemblies.
7.
(a)
There are 580 fuel assemblies in the core.
(b) There are 936 fuel assemblies in the speEt fuel pool.
~
8.
(a)
The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.-
(b)
The planned spent fuel storage capacity is 2320 fuel assemblies.
9.
With precent spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblics.
9 e
.