Informs That Insp of All Cycle 2 Fuel Assembly Holddown Springs Has Been Completed During Current Refueling.One Spring Reported Broken.Broken Spring from Heat Treatment HT2405X Replaced
ML20054L148
Person / Time
Site: Davis Besse 
Issue date: 06/28/1982
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
A82-494B, NUDOCS 8207070192
Download: ML20054L148 (1)


Text

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

TOLEDO Docket No. 50-346 cm License No. NPF-3 Serial No. 832

'e m2ei A82-494B June 28, 1982 Director of Nuclear Reactor Regulation Attention:

Mr. John F. Stolz Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stolz:

A commitment was made in a Toledo Edison letter dated July 10, 1980, (Serial No. 627) to inspect all Cycle 2 Fuel Assembly Holddown Springs at the Davis-Besse Nuclear Power Station Unit No. I during the second refueling outage. That inspection has been completed during the current refueling with one spring reported broken.

The broken spring at Davis-Besse has be en replaced and was from heat treatment number HT2405X which is used t.n all B&W operating reactors.

Out of the 177 fuel assemblies examined at Davis-Besse, only the single spring has been identified as broken and is currently under evaluation by B&W.

This failure is considered an isolated instance within the realm of statistically expected occurrences.

Very truly yours,

/ f RPC:LDY: lab cc:

DB-1 NRC Resident Inspector h

8207070192 820629 L

PDR ADOCK 05000346 g

PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652