ML20054K959
| ML20054K959 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 06/16/1982 |
| From: | Pliml G COMMONWEALTH EDISON CO. |
| To: | Harold Denton NRC |
| Shared Package | |
| ML17298A038 | List: |
| References | |
| A-82-231, NUDOCS 8207060352 | |
| Download: ML20054K959 (3) | |
Text
-
A-92-231 EPIP 700-1 NOTIFICATION OF FC.3~DJRE C.-iANGE Juna 16, 1982
-Q-W rs-a Mr/Ms fm h Bock #(s)
Sd -SV l
AOP - Abnormal Operating Procedures E0P Emergency Operating Procedures j
X EPIP - Emergency Plan Implementing Procedures l
FHI Fuel Handling Instructions COP General Operating Procedures MI
- Maintenance Instructions PT
- Periodic Test Procedures RP Radiation Protection Procedures SOI
- System Operating Instructions TSS Technical Staff Surveillances ZAP Zion Administrative Procedures Zion Chemistry Procedures ZCP ZED Zion Electrical Distribution ANNUtCIATOR RESR3NSE MANUAL CURVE BOOK FSAR - Final Safety Analysis Report ZION TECH SPECS - Technical Specifications Filino Instructions:
- Please revise per attached changes to EPIP 700-1, pgs. 1, 9.
Rev.
3.
June 15, 1982 Please acknowledge receipt of the above listed procedure (s), instruction (s) or revision (s) by returning this receipt letter to L. Minejevs, Zion Station.
Signed Date
/
G.' Pliml Asst Superintendent Zion Station FOR OFFICE USE OtLY Receipt Audit:
Date Of Audit Receiots Not Received Receiots Recuested All prccecure(s), instruction (s) or revision (s) listed were distributed on in accordance with the Zion Distribution List.
8207060352 820625
~
00 0019W
)
STATION PROCEDURE CHANGE REQUEST O Re O f{ Q.Q. &
' Procedure intent changes require Station Review before using.
CHANf2E
.[], Q[
REQUEST Procedure changes with prior Station Review do not need SRO approval.
PROCEDURE TITLE MM m,
NUMBER T'/
/' dI Permanent Change 0/
New procedure O
Special Procedure O
Desired El ctive "O
Date
'lJ.M.L. b t) i Yes O No O
[j/
J
&Y 11]_ UA)
?L 111J %1 Brief Description Ok?n) [ddludok llau inw>x lbm) Joi-twim U/o w
(
'la1) 9sN-ossb.$
Ga ?1) 9 Ahm)FiuJnifddab gg
'g
/
16 f1)
Reason for change
~
/*
/
l'
> /
/
M Department Date Requested By
/
'O ' '
W o
//
Temporary Change Approval (No intent change,14 days review)
Dept. Supervisor Date SRO Date FORM 5 514 Station Review Copy
{
~
/
i i
'}
1 Is a change to the Technical Specifications needed?
Yes
,No t
8 Is the probability of an occurrence or the consequence of an accident or l
malfunction of equipment important to saf ty as previously evaluated in j
the SAR increased?
Yes No
/. _Hecause' (f
i
)
Is the possibility for an accident or malfunction of a different t e
j than any previously evaluated in the SAR created? Yes No Because:
4
/
Is the margin of saf ty, as defined in the bpsis for any Technical Specification, reduced? Yes No d -Becauser 3
N Prepared B
/
Date 04 f.!
/
/
/
W Temporary Re_ view Per=anent Review Signature Date Appr.
Not Appr.
Signature Date Appr. Not Appr.
. C NId; e 'a O
~'
WA dAz. Y
~ Q
/lOX2 rnA a or Station Superintendent:
If not approved, explain:
b n
i ff6%)m 6'- /T4D J) i Station Superintendent Appr. Date Effective % e l
I (Appr. for perm, use)
(if different frem appr. date) i
_..,, _ _ _