Insp & Evaluation of NFS High Level Waste Storage Sys, Monthly Progress Rept for May 1982
ML20054K910
Person / Time
Site: West Valley Demonstration Project
Issue date: 06/15/1982
From: Deichman J
ROCKWELL INTERNATIONAL CORP.
To: Clark A
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
12-545-R44, 20831, NUDOCS 8207060276
Download: ML20054K910 (5)


Text

,

pp R.

RerclR U 396-35 go

.2c/

u,

'. ).

Rockwell Hanford Operations O

Energy sy;, terns Gr Rockwell o

Richland, WA 99352 International June 15, 1982 In reply, refer to letter #12,545 R44

/

gQ\\\\l(.0 Dr. A. Thomas Clark, Jr.

West Valley Wastes Nuclear Regulatory Commission jyt{p##$@ f,.

Nuclear Materials Safety and Safeguards I IF

'5 s

D Washington, D. C.

20555

$ M'p%[*

'b

Dear Dr. Clark:

cn j INSPECTION AllD EVALUATION OF NUCLEAR FUEL SERVICES HIGH-LEVEL WASTE STORAGE SYSTEM

Reference:

Statement of Work for Physical Characteristics of Waste Tank and Contents at West Va-ley (attachment to letter, August 3,1979, R. W. Brown, Jr., to A. G. Fremling)

Transmitted herewith are four copies of the May 1982 monthly report of the subject work, as requested.

If you need additional information, please contact Mr. R. E. Smith (FTS 440-2086) of my staff.

Very truly yours, y

/ D(

k

. i Niijg u?

co h

//

)

J.L.

ichman, Program Directo Jf.,

a q

Waste Management Program Office,;

[,][45/gN.,.C.:

DocxErm USMc JLD/RES/ccb 6

'w c,'W.

g

'f i.

4 b

JUN 2 5 gggg y

^

Enc. - 4 copies g,

g-nes 3

'a MAIL SECilOM cc:

R. W. Barber

- DOE-HQ cocxtretag

\\

E P. E. Rasmussen

- 00E-RL J. J. Schreiber

- DOE-RL 4

0 M. W. Shupe

- 00E-RL F. R. Standerfer - DOE-RL F. H. Allhoff

- DOE-SR

-e

  • M

.M R.

Stiens

- DOE-WV h h g[,}'d( t l

L. C. Rouse

- NRC Office of r9 "

Director NMSS - NRC

)

T. K. DeBoer

- NYSERDA M

I 8207060276 820615 DRADOCK05000g

i I

r e

MONTHLY PROGRESS REPORT WORK PACKAGE:

XI -- Inspection and Evaluation of Nuclear Fuel Services High-Level Waste Storage Syste,m WORK PERIOD:

May 1982 WORK OBJECTIVE:

The objective of this project is to determine the condition of the storage tanks and vaults at Nuclear Fuel Services

.(NFS), West Valley, New York.

ACTIVITY 1.0 PROGRAM MANAGEMENT Progress A response to the West Valley Nuclear Services (WVNS) request for proposal was completed and transmitted to West Valley as scheduled.

Problems None Planned Work Continue Program Management efforts in support of program activities.

ACTIVITY 2.0 TANK AND VAULT INSPECTION Progress The large area scanner which supports the annulus inspection and ultrasonic testing equipment was reassembled in the development laboratory. Additional testing and debugging of the equipment was performed. Minor modifications were made to enhance the assembly and operability of the equipment in the field.

Problems Complications with the waste tank inspection equipment occurred during final testing.

Consequently, shipment of the equipment to West Valley was post-poned impacting the June 7,1982 schedule start for the field operations.

Both the Nuclear Regulatory Commission (NRC) and West Valley Nuclear Services (WVNS) were appraised of the problems and concurred to delay the field operations one week.

Monthly Progress Report Page 2 May 1982 Planned Work Transport equipment to West Valley.

Perform field operations at West Valley Nuclear Services.

Initiate preparation of topical report of the waste system inspection.

l

PROGRAM MANAGEMENT

SUMMARY

REPORT 139.,

INSPECTION AND EVALUATION OF NFS END FUNCTION: ilIGil-LEVEL WASJ_E_ STORAGE SYSTEM

_X_.1 0 & R NUMBER:

50-19-01-02' REPORT PERIOD: ' MAY 1987 PROGRAM OIRECTOR:

J. L. DEICitMAN PROGRAM MANAGlin R. E. SMITH'

. ' =

MILESTONE STATUS - FISCAL YEAR 1982 First Guarter Second Ouarter Third Quarter Fourth Qygrtgt O lN D

J F

M A

M J

J A

S.

i 1.

DEVELOPMENT OF ANNULUS INSPECTION EQUIPMENT COMPLETED.....

A OO i

}

~2.

DESIGN AND DEVELOPMENT OF WALL THICKNESS MEASUREMENT EQUIPMENT

,A Dj COMPLETED...........................

3.

EINAL PROCEDURES FOR INSPECTION OF Ti!E !!IGH-LEVEL WASTE STORAGE

/\\ Qj TANKS AT WEST VALLEY ISSUED.........'..........;

M 4.

Pl10T0GRAPilIC INSPECTION OF TANK INTERIOR COMPLETED.......

5.

PHOTOGRAPHIC AND TELEVISI0t{ INSPECTION OF VAULT ANNULUS AND O,

TANK EXTERIOR COMPLETED....................

A Q,

6.

WALL THICKNESS MEASUREMENT COMPLETED......

^

0, I

7.

TOPICAL REf0RT OF WASTE SYSTEM INSPECTION ISSUED........

1 j

l I

l I

f I

1 I

h I

I l

h Major Melestone A Key Milestone A Completed'

'0 Approved Schedule Deviation (Late)

+

^ Early Cornpletion. Schedule Devletion 3

. Tirne Now 8 Cancelled or Deferred,(out of current fiscal yearl O Unapproved Schedule Deviation (Late)

BD-0100 684 (R.9-80) oo........

PROGRAM MANAGEMENT

SUMMARY

REPORT 141 INSPECTION AfiD EVALUATION OF NFS END FUNCTION: HIGH-LEVEL WASILSTORAGE SYSTEM - XI O & R NUMBER:

50-19-01-02.

REPORT PERIOD: *_UAL1982 PROGRAM DIRECTOR:

J. L. DEICHMAN PROGRAM MANAGEn R. E. SMITH

-(Dollars in ' Thousands)

FISCAL YEAn 1982 FINANCIAL PLAN STATUS N o,

,Q;itq Amount TB0

$588 s

$688 pd 600--

/'

,/

i

/

,./.

400A-

/

Current FY 1982 f

Dudget $l8S

/

p Legend 200--

/

audget Actual j#

Current Es:imate To Completo MM.

Rockwell Equiva!cnt Man-Months

,f (Over)/ Under OCT.

NOV.

DEC.

JAN.

FEB.

MAR.

APR.

MAY JUN.

JUL.

AUG.

SEP.

Chanac_CD11tt01 6.2 6J 7.3 10.8' 10J 1.0 6

'11,1 1.6,.0__10.J5 3_._6 17 2.3 DVDGET MM 1

a.

0044-82-5 ACTUAL MM 3.7 7.3 4.8 4.4 6.2 15.3 17.9 14.7 x

DUDGET 34 54/-12 4R 77 57 58 69 127D 92 21 31 38

-o 2

ACTUAL

'18 58 44 3ji 41 92 106 112 VARIANCE 12 (16 )

(2) 42 17 (34 I

(37 14 50h

'sqa BUDGET

.34 76 118 195 2_5_2 310 379 61S 650 688 o-18 76 120_ _ 1 53 196 288 394 507 ACTUAL VARIANCE

.12 0

(2 )

40 56 22 (15]

(1 )