ML20054K668

From kanterella
Jump to navigation Jump to search
Public Version of Temporary Change to Revision 3 to Emergency Plan Administrative Procedure 1053, Emergency Equipment Readiness
ML20054K668
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/17/1982
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20054K663 List:
References
1053-03, 1053-3, NUDOCS 8207060039
Download: ML20054K668 (18)


Text

.

.:53 [e i'5

.ievision 3 //

THREE MILE ISLAND 1UCLEAR STATION UNIT NO. 1 ADMINISTRATIVE PROCEDURE 1053 EMERGENCY EQUIPtENT READINESS Table of Contents Section Pao _e 1.0 GENERAL 3.0 1.1 Punose 3.0 1.2 Scope 3.0 1.3 References 3.0 2.0 RESPONSIBILITIES 4.0 2.1 Manager, Radiological Controls. 4.0

t ,%. 3 y ,E.,4 - ~ 44 C d Is,D I- Y,o 2.3 Radiological Controls Field Operations Manager /Mm+e 4.0 E.vi- 4 A C. A , ls ,TW .

2.4 Radiological Controls Field Operations Foreman /M-sw 4.0 6 -v 6 Y I C ,.d c.Is ,T m i.

2. !i Suppon Services Supervisor 5.0 3.0 REQUIREENTS 6.0 3.1 Inspections and Calibrations 6.0
3.2 Procedure 7.0 3.3 Final Conditions To,&
tT" l List of Enclosures I Minimum Requirements for Kits / Lockers 10.0 Il Processing Center U-I 11.0 lII Service Building Auditorium 14.0 IV Rad Con Lab / Control Point 15.0 V Control Room / Shift Supervisor's Office 18.0 VI Unit 1 Warehouse 20.0 VII Alternate EOF 21.0 VIII Emergency Operations Facility (EOF) 25.0 1.0 '

8207060039 820625 PDR ADOCK 05000209 F PDR

1053 Revision 3 List of Enclosures Section Pace -

8X Technical Support Center (TSC) 27.0 X EwA~ dd O l'off;--

XI Monthly Operational Check of Emergency Equipment 28.0 XII Quarterly Radio and Inverter Surveillance 31.0 XIII Inspection of Emergency Respiratory Equipment, SCSA's 33.0 IDE Inspection of Emergency Respirator 9y Equipment, SCBA 35.0 Cylinders

.II Inventory Checklist for Full Face Respirators w/ 36.0 -

Canisters l

l l

l l

i 1

a 2.0 l

l e

-- - . - , - , , - - - - , - - -- - - - ~

ICS3 2avision 3 1.3.6 Radiological Controls Procedure 1772, Dosimeter Calibra-tion and Leak Test.

1.3.7 Radiological Controls Procedure 1616.1, Selection and Use of Respiratory Protective Devices.

1.3.8 Prececures 1104-45A through L, Fir 2 Pr: taction. .

1.3.9 Administrative Procedure 1001, Document Control.

L.3.10 RPSP 1616.3, Respirator Cleaning and Testing' Facility.

2.0 RESPONSIBILITIES 2.1 The Manager, Radiological Controls has the ultimate responsibility for all radiological control emergency equipment and its avail-ability

+ w and .a_ reliabildb. W ab ^* ""1 " *

"Tf'if

-= 4 4 o440.4 .

t.2. A WL. p, L:_t_I C+,lh< +L J+ - L. <w-a4 b ll o.4i d g s l .m.J.to y q ui& (- % m 4 ,4 3 N c A =4 JAls.Hw.H. s v . ,f A .i / 4 A e.,A do!M.h ul yd; klt i,, , g -

2.3 ~

The s Radiological Controls Field Operations MaiIagey or. &T desig ~ j nee $ shall assignfNsIn:n4 '

el to perform inventory and calibration checks on the emergency kits and lockers undertG.'.lurisdiction.

2.# The Radiological Controls Field Operations /

%. ,E+ M+~l C h.,la,TW,T Foremanj\shall ensure

{

s~ ~

that tne following items are performed during an inventory:

,  ? 6 2.4 .1 Ccmplete all inventory checklists for that kit / locker.

ZA .2 Replace all missing items.

2.4.3 Ensure all individual procedures contained in kits / .!

P lockers are controlled ccpies. '

2 J(.4 Verify calibrations, perfor.3 operational checks, note 7 discrepancies on inventory checklist, and notify the f Radiological Controls Field Operations Manager /Fo an4 - '

% "~ 6. % _ + I c d I,,TMt.w e m . f-these discrepancies and/or breken locks or smalt-

1053 Revision 3 2.45 Emergency instrumentation removed from lockers / kits shall be replaced prior to end of working shift except during l

actual emergencies.

2.s The Support Services Supervisor, or his designee, shall conduct the required inspections for all respiratory protective equipment.

This will be accomplished by ensuring completion of the following:

2'.f.1 Replace any equipment which is missing or requires maintenance.

2. f.2 Inspect each item per the requirements of Radiological Controls Procedure 1616.1 and RPSP 1616.3.
2. f. 3 Place an Emergency Respiratory Equipment Inspection tag with each piece of equipment found acceptable.

2.f.4 Complete the Inventory Checklist for Full Face Respira-tors w/ Canisters (Enclosure XIV), the Inspection of Emergency Respiratory Equipment for SCBA's (Enclosure l XII), and the Inspection of Emergency Respiratory Equip-ment for SCBA Cylinders (Enclosure XIII). Retain the originals for review and filing by the Support Services i

Supervisor, with copies to the Site Emergency Prepared-ness Manager and the Supervisor Respiratory fren~, E- m- Prote]ijn 9.W ,o l

2.f The Radiological Controls Field Operations Foremadshall be noti- 1 s

j fied of all emergency equipment usage at the end of its usage. 3 h

L P

5.0

v 1053 Revision J 3.0 RE0VIREMENTS 3.1 Inspections and Calibrations 3.1.1 Emergency kits / lockers shall have inventory and calibra-tion checks perfomed quarterly, with the exception of items listed on Enclosure .If and respiratory protection equipment which shall be checked after each use and once each calender month.

3.1.2 Prior to removing an instrument for repair / calibration from any emergency equipment storage location, an alter-nate equivalent instrument shall be provided.

i 3.1.3 Calibritions of emergency instrumentation shall be perfomed in accordance with references 1.3.2 through l 1.3.6.

i 3.1.4 Emergency lockers / kits.shall be visually inspected for lock / seal integrity monthly. Lockers or kits with l

! suspect integrity shall be inventoried. Emergency l lockers / kits shall be inventoried after each use includ-ing use for training.

NOTE: Lock / seal integrity shall be checked prior to  :
opening lockers / kits for operational check of  :
portable radiation monitoring and air sampling  :
equipment. Locker / kits may be. resealed innediately  :
after operational checks are complete and equipment  :

l

returned.  :

3.1.5 Perform an inventory / inspection or calibration at any time as directed by the Radiological Controls Field Operations Manager / A- y Ob J *5' '

6.0

1053 Revision 3 3.2 Detail s 3.2.1 Emergency equipment and/or radiac instruments shall be located in the following areas in accordance with the TMI Unit 1 Emerg ncy Jo g protection of Emergency Personnel /andavailabilityofequipment:

a. Unit 1 Processing Center
b. Unit 1 Service Building Auditorium
c. Unit 1 Reactor Building Access Control Point / Unit 1 Radiological Controls Laboratory
d. Unit 1 Control Room / Shift Supervisors Office (SS0)
e. Unit 1 Warehouse
f. Near site Emergency Operations Facility (EOF) (TMI Observation Center)
g. Alternate Emergency Operation Facility (AEOF)(Crawford Station, Middletown, Pa.)

h.

i. Technical E - /. e -- Suppor(t b Center ((TSC) j, % Ambulance cd - s e F A (+4 L h Om'%2 J J lhf.,

i

)s j. Fire Brigade Vehicle

NOTE: The Ambulance and the Fire Brigade Vehicle are  :
inventoried by Unit II. Checklists for these  :

inventories are located in Administrative Procedure  :

1057.  :

l I

1 7.0 e

1053 Revision 3 3.2.2 Inventories shall only be considered ccmplete when 'all required items are returned to the kit / locker, all instruments in the kit / locker are within calibration and all operational checks on equipment / instruments are complete.

a. Operational checks shall consists of battery check, response check and visual inspection for obvious damage.

(See Enclosure E for operational check of emergency equipment).

l 3.2.3 All emergency kits and lockers shall have seals or l

padlocks, as appropriate.

3.2.4 Key control for all emergency kits / lockers shall be ,, _ ( ( g f.

maintained by the Radiological Controls Department /with  ?

?

duplicates maintained in the Emergency Control Center 5 (Control Room / Shift Supervisors Office).

3.2.5 All completed inventory checklists shall be returned to '

the Radiological Controls Field Operations Foreman / .!

/M.-~,~ e%.;J a C, ( nls.1% I Support Services Superviso$ as appropriate, for review }

q and filing. A copy of the inventories shall be sent to  !

a the Site Emergency Preparedness Manager and Supervisor -

Respiratory Protection (Respiratory Checklists Only).

8.0

1053 Revision 3 3.3 FINAL CONDITIONS 3.3.1 All equipment / instruments have been inventoried, and inventory checklists have been reviewed by the Radio-logical Controls Field Operations Fo an

  • Support

/M ~~f -- En .;~~ .in ls , rm t Services Supervis as appropriate, ano copies forwarded to the Site Emergency Preparedness Manager.,and the Supervisor - Respiratory Protection (Respiratory Checklists Only). -

3.3.2 Used kits / lockers are reinventoried, resupplied and locked / sealed.

1 1

\

9.0 ,

1053 Revision 3 ENCLOSURE 1 Minimum Requirements for Kits / Lockers LOCATION UNIT-1 KITS / LOCKERS REOUIRED

1. Processing Center 4 Kits (5 instruments,

,zemergency)

2. Service Building Auditorium 1 Locker (Protective Clothing Only)
3. Rad Con Lab / Control Point 1 Locker (Protective Clothing, Respirators, Instruments) 1 Ambulance Kit
4. Control Room / Shift Supervisor's Office 1 locker (Respirators, instrs)
5. Warehouse (Unit I) 1 Emergency Locker 1 Personnel Monitoring Kit
6. Alternate Near Site Emergency 1 Locker (Protective Clothing, Operations Facility Respirators, Instruments Kit, Decontamination Materials)
7. Near Site Emergency Operations Facility 1 Locker (Protective Clothing, Respirators, Instrument Kits)
8. Technical Support Center 1 Locker (Protective Clothing, Respirators) 9, E-va. - ~4.5 d it OML 4 k: t.s (z iks k 4 s, 2 r .y. )

l l

l l

10.0

1053 Revision 3 .

ENCLOSURE II INVENTORY CllECKLIST - EMERGENCY EQUIPIENT -

Kit Location: Processing Center U-I Type: Emerg. -

Inst. -

Emerg. -

Inventory Date:

Kit ___ Kit _ Locker _

Inventory Performed By: Reviewed: Date:

: NUMBER  : NUMBER  :  : CAL DATE/  : OPERATIONAL  :
ITEM  : REQUIRED : PRESENT : S/N  : REV. NO.  : CllECK  :
REMP Map  : 1  :  : N/A  : N/A  : N/A  :
Site Map  : 1  :  : N/A  : N/A  : N/A  :
Directions to  :  :  :  :  :  :
Monitoring Stations  : 1  :  : N/A  : N/A  : N/A  :
Procedures EPIP 1004.10,  :  :  :  :  :  :
1004.12, 1004.31  : 1 ea. :  : N/A  :  : N/A  :
Attachments -  :  :  :  :  :  :
1004.10 Att I  : 10 ea. :  : N/A  :  : N/A  :
Flashlight with spare  :  :  :  :  :  : ,
__bulh and batteries  : 1  :  : N/A  : N/A  :  :
Tablets, Pens, Pencils,  :  :  :  :  :  :
Wax Pencils  : 4 ea. :  : N/A  : N/A  : N/A  :
Polyethylene Sheeting (8' x'16' min): 2  :  : N/A  : N/A  : N/A  :
Polyethylene Sheeting (4' x 8' min): 2  :  : N/A  : N/A  : N/A  :
Smear / Air Sample Envelopes  : 100  :  : N/A  : N/A  : N/A  :
Air Sample Filters  : 2 boxes :  : N/A  : N/A-  : N/A  :
Disc Smears  : 2 boxes :  : N/A  : N/A  : N/A  :

REMARKS: L. (O kits, each containing the material Emergency Kit Lockeil or Sealed: )

listed, are stored in the Processing Center. 3 Signature i

11.0 l

1053 R visicn 3 ENCLOSURE II INVENTORY CllECKLIST - EERGENCY EQUIPKNT -

Kit Location: Processing Center U-I Type: Emerg. -

Inst. Emerg.r- Inventory Date:

Kit _ Kit _

K Locker L_

l i

. Inventory Performed By: Revle.ded: ,

Date:

: HUMBER .: HUMBER  :  : CAL DATE/  : OPERATIONAL  : l
ITEM  : REQUIRED  : PRESENT : S/N  : REV. NO.  : CHECK  :
Air Sampler (H809V/equiv)  : 1*  :  :  :  :  :

h Dose Rate Meter (RO-2/equiv) 1 $ $ $ $

Stabflized Assay Meter (SAM-II)  : 1  :  :  :  :  :
Stopwa tch  : 1  :  : N/A  : N/A  : -
12 Volt AC/DC Inverter  : 1*  :  : N/A  : N/A  :  : l
7wo Way Radio (w/ beeper a id  :  :  :  :  :  :
magnatic antenna)  : 1*  :  : N/A  : N/A  :  :

$ Inventory Checklists (Gl.~h)  : As Required :  : N/A  :  : N/A  :

RDMRKS:

  • May be kept in locker Emergency Kit Locked or Sealed: l f-e (2) kits each containing the above material, are stored in the Processing Center.

Signature 13.0

1053 Revisten 3 .

ENCLOSURE I I VENTORY CllECKLIST - EMERGENCY EQUIPENT f*w C*~ ls O f(.' a .

K1t Location: Type: Emerg. -

Inst. -

Emerg. -

Inventory Date:

Kit _ Kit _ Locker _

inventory Performed By: Reviewed: Date:

: NUMBER  : NUMBER  :  : CAL DAIE/  : OPERATIONAL  :
ITEM  : REQUIRED  : PRESENT : S/W  : REV. NO.  : CllECK  :
REMP Map  : 1  :  : N/A  : N/A  : N/A  :
-Site:May .
Directions to
-k=-  :  : W: M-  : "/A -- :
Monitoring _ Stations  : 1  :  : N/A  : N/A  : N/A  :
Procedures EPIP 1004.10,Mit f**% U :  :  :  :  :  :
GM8*,torvat , de Pi 'fios, viov, /&or, N7  : 1 ea. :  : N/A  :  : N/A  :
Attaciments -  :  :  :  :  :  :
_ _1004.10 Att ! , Jor /,ro 4tf f  : 10 ea. :  : N/A  :  : N/A  :
Flashlight with spare

~

bulb and batteries  : 1  :  : N/A  : N/A  :  :
Tablets, Pens, Pencils,  :  :  :  :  :  :
Wax Penctis  : 4 ea. :  : N/A  : N/A  : N/A  :
Absgeb M b ls  : 2 k M a r ::  : N/A  : N/A  : N/A  :
Polyethylene Sheeting (4' x 8' min): 2  :  : N/A  : N/A  : N/A  :
Smear / Air Sample Envelopes  : 100  :  : N/A  : N/A  : N/A  :
Air Sample Filters _
2 boxes :  : N/A  : N/A  : N/A  :
Disc Smears _.
2 boxes :  : N/A  : N/A  : N/A  :

N 1 l

REMARKS: har-d4 kits, each containing the material Emergency Kit Lockeit or Scaled:

listed, are stored in the 6avie.~ - Al d vd: O 4fi.4 .d W lv h Ori h M *//4 k e., Signature 27.l l

1053 R:visten 3 .

~

ENCLOSURE I g INVENTORY CllECKLIST - EERGENCY EQUIPKNT b-l Q i, OEF,L. 'i E- % . .

Kit Location: Type: Emerg. -

Inst. -

Emerg. -

Inventory Date:

Kit d Kit _ Locker _ .

Inventory Perfomed By: Reviewed: Date: __

: NUMBER  : NUMBER  :  : CAL DATE/  : OPERATIOilAL  :
ITEM  : REQUIRED  : PRESENT : S/N  : REV. NO.  : CilECK  :
Iodine Cartridges (Sliver Zeolite) : 5 Min /25 Max  :  : N/A  : N/A  : N/A  :

. : Rad. Warning Signs / Ribbon  : 5/50'  :  : N/A  : N/A  : N/A  :

Water Sample Bottles  : 5  :  : N/A  : N/A  : N/A  :
First Aid Kit  : 1  :  : N/A  : N/A  : N/A  :
Masking Tape  : 2 Rolls  :  : N/A  : N/A  : N/A  :
RCP 1605, and 1607  : 1 each  :  : N/A  :  : N/A  :
Emergency TLD's w/ issue forms  : 50 *  :  : N/A  :  : N/A  :
: low  :  :  :  :  :
Pocket Dosimeters :5 range _:  : N/A  :  : N/A  :
Dostmeter Charger  : 1  :  :  : N/A  :  :
S c i s . .,- s  : 1 3.-  :  : N/A  : N/d  :

N/A  :

$ Sun,ms C loqu f [1 -

s, f f p/A f p/A l /w/4 [

l LA., cLal,6 (gi_L) l <.ec ../ l l u A. : l /v/4 l REMARKS: -

Emergency Kit Locked or Scaled: l Signature 2.7. L

ONMo Revision 3 ENCLOSURE I .

IN ENT RY CllECKLIST - EERGENCY EQUIPKNT .

Ems'm > 0FF. L .

Kit Location: Type: Energ. -

Inst. -

Eme rg .

Inventory Date:

Kit _ Kit I Locker _

inventory Performed By: Reviewed: Date:

: NUMBER  : NUMBER  :  : CAL DATE/  : OPERATIONAL  :
ITEM  : REQUIRED  : PRESENT : S/N  : REY. NO.  : CilECK  :
Air Sampler (il809V/equiv)  : 1*  :  :  :  :  :
Dose Rate Meter (RO-2/equiv)  : 1  :  :  :  :  :
Stabili ed Assay Meter (SAM-II)  : 1  :  :  :  :  :

N.Mder(EM-}V)hid Nf-210f.k :' \  :  :  : j i .

Stopwatch  : 1  :  : N/A  : N/A  :  :
12 Volt AC/DC Inverter  : la  :  : N/A  : N/A  :  :
Two Way Radio.(w/ beeper and  :  :  :  :  :  :
magnetic antenna)  : 1*  :  : N/A  : N/A  :  :

$ inventory Checklists (GlM) AsRequired$ $ N/A $ N/A $

REMARKS:

  • Hay be kept tw IL v!dUt9 af N kd. Emergency Kit Locked or Scaled: l Tw. I'll kits each containing the above material are stored in the .Ewi#..

d Mr.L offJc. J Wtok ov Joy pl W/d+,& . signature 27,5

. '.- 1053 Revision 3 ENCLOSURE XI Monthly Operational Check of Emergency Equipment

NOTE: Initial each step as operational check of emergency  :
equipment is performed.  :

Monthly (Initial as each instrument is checked Sat.)

Battery Check and Source Check of Portaole Instrumentation

:  :  : Source  :  :
Location and Instrument Tyne  : Serial No.: Battery : Check  : Initial :
Pc  :  :  :  :  :
Kit No.1 R0-2 or Eouiv.  :  :  :  :  :

!  : SAM II  :  : N/A  :  :  :

VC  :  :  :  :  :
Kit No. 2 R0-2 or Eouiv.  :  :  :  :  :
SAM II  :  : N/A  :  :  :

.a-

. m. . . .

~.,.n

-t/T  :  :  :

.. ac .. .-. ,_ , -. -

nu-s v, . , - . --.

W  : *
H. P. LAB /  :  :  :  :  :
Control Point R0-2 or Eouiv.  :  :  :  :  :
R0-2 or Equiv.  :  :  :  :  :
Teletector  :  :  :  :  :
Teletector  :  :  :  :  :
Teletector  :  :  :  :  :
Teletector  :  :  :  :  :
Teletector  :  :  :  :  :
Teletector  :  :  :  :  :
RM-14 or Equiv.  :  :  :  :  :

28.0

. , . , - . . - , . -------.-..w,- .- .- - - - , - - , , - - - - , - - - - - = . - - . . . - - - - - . - -

1053 Revision 3  ;

l ENCLOSURE XI l Monthly Operational Check of Emergency Equipment

:  :  : source  :  :
Location and Instrument Type  : Serial No.: Batterf : Check  : Initial :
Alternate  :  :  :  :  :
NEOF R0-2 or Eauiv.  :  :  :  :  :
: R0-2 or Eauiv.  :  :  :  :  :
RM-14 or Ecuiv.  :  :  :  :  :

l  :  :  :  :  :  :

RM-14 or Eauiv.  :  :  :  :  :
Unit I  :  :  :  :  :
Warehouse R0-2 or Eauiv.  :  :  :  :  :
_ R0-2 or Eauiv.  :  :  :  :  :
E520 or Eauiv.  :  :  :  :  :
RM-14 or Eauiv.  :  :  :  :  :
Control Room  :  :  :  :  :
Area R0-2 or Equiv.  :  :  :  :  :
R0-2 or Eauiv.  :  :  :  :  :
RM-14 or Equiv.  :  :  :  :  :

i s AA E l } N/A l 1 l

EOF R0-2 or E0uiv.  :  :  :  :  :
- R0-2 or E0uiv.  :  :  :  :  :
RM-14 or Equiv.  :  :  :

Wr

. s

. Tsc. i  ; N/A  : i  : 4

.c t.

I s; ek;s<t

  • I SO *1 d ". ' '

1

! $dME i { N[A. i i i j g.H . E A.  :

.g.v. -

i k;+ b 2. t i

i i

. N L u Ge.aw . .

! MMd h i M&

2 i i W.M u Eau,'v. 5

- 5 i

u Data Completed Reviewed By

1053 Revision 3 ENCLOSURE XIt Quarterly Radio and Inverter Surveillance Ouarterly 12 V. DC/115 V. AC Inverter Check

NOTE: Electrical Department Personnel shall assist  :

Radiological4Controls Personnel to perform Steps 1  :

/6ae ---- onrougn d for each inverter.  :

1. Hook-up inverter to 12V power supply. .
2. Turn inverter on and allow to operate for one (1) minute.
3. Load inverter by plugging in air sampler unit and turn Air Samplev

! unit on.

j 4. With volt-ohm meter check output of second female plug. Voltage should be 115 V. AC + 10 Volts.

Remarks

5. Turn off Air Sampler and measure output voltage of female plug.

Voltage should be 140 V. AC + 10 V. ,

Remarks

6. Remove Air Sampler Unit plug from inverter. Remove volt-ohm unit from inverter.
7. Turn off inverter and disconnect from 12V. power supply.

l 8. Return 12 V. AC/DC 115V. Power inverter to cabinet.

l 1

Inverter  : Ghecreo sat. :
Serial Number  : Initial s  :

l  :  :  :

l  :  :  :

Date Completed Reviewed By 32.0

1053 Revision 3 ENCLOSURE XV Inventory Checklist Full Face Respirators W/ Canisters Month Year

:  : NumDer Present  :  :
: Number : Model  : Type  :  :  :
Location  : Recuired : Faceoiece : Canister : Quantity : Date/ Signature  :
HP Lab /  :  :  :  :  : -
Control Pt : 25  :  :  :  :  :
Control Rm :  : -
SSO  : 25  :  :  :  :  :
U-1  :  :  :  :  :  :
Warehouse : 25  :  :  :  :  :
Alternate  :  :  :  :  :  :
EOF  : 25  :  :  :  :  :
EOF  : 25  :  :  :  :  :
Isc (may De:  :  :  :  :  :
stored at :  :  :  :  :  :
HP Lab /  : 25  :  :  :  :  :
Control Pt :  :  :  :  :  :
g_g pc  :  :  :  :  :  :
: y  :  :  :  :  :
J(IT5  :  :  :  :  :  :

g$%t. Cob.

  • y t
g.4 6  : (  :  :  :  :

55  :

  • N.h.: L. kn s .4 1. L J .J & G A d J C 4. *Is 0 9 A..

. A % t. k . W , M d l L. h ,9 .

Conuments:

Reviewed By

,