Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Testing Results of Type W-2 Control Switches Revealed No Failures. Malfunction of W-2 Switches Not Attributed to Design
ML20054K591
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 06/24/1982
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-6820 IEB-80-20, IP-JAS-1940, NUDOCS 8207020356
Download: ML20054K591 (1)


Text

POWER AUTHORITY OF THE STATE OF NEW YORK INDIAN POINT NO. 3 NUCLEAR POWER PLANT P. O. BOX 215 BUCHANAN.N.Y.10511 TELEPHONE: 914 739.8200 9

June 24, cn e.

1982 IP-JAS-1940 Ronald C. Haynes, Regional Administrator Office of Inspection and Enforcement Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

I.E.Bulletin 80-20 Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches

References:

1.

Letter-S.S.Zulla to B.H. Grier IP-CMC-9902 of 9/12/80 2.

Letter-J.C.Brons to B.H. Grier IP-SLM-12025 of 2/10/81 3.

Letter-J.C.Brons to B.H. Grier IP WDH-12269 of 3/3/81

Dear Mr. Haynes:

The continuity testing of the thirty-eight (38) Type W-2 Control Switches as committed to in our responses (References 1, 2, and 3) has been performed on a monthly basis and at other required times. The results of this testing program to date have indicated no failures of the identified control switches.

The man _!acturer of these switches, Westinghouse Switchgear Division, has performed and completed a thorough evaluation of the W-2 switch with spring return to neutral as a result of the reported failure. The manufacturer has concluded that the malfunction of the W-2 switches was not attributable to any generic design failure. This conclusion was confirmed by independent tests at the Westinghouse Research Laboratories.

It is the Authority's position based on the results of the testing program to date and the evaluation performed by Westinghouse Electric Corporation that it is not necessary to install the status lights as committed to in our September 12, 1980 response (Reference 1).

Therefore, the testing program being performed on Type W-2 Control Switches as committed to in our referenced responses will be terminated on August 1, 1982 unless otherwise notified.

Very truly yours, n.

J. C. Brons JAS:ms Resident Manager J

I h' l i

8207020356 820624 PDR ADOCK 05000286 7

G PDR

-