Category:CORRESPONDENCE-LETTERS
MONTHYEARML20054K2421982-05-27027 May 1982 Requests Withholding,Per 10CFR2.790,of Info Transmitted by EP Rahe to Tp Speis ML20054K2341982-05-27027 May 1982 Forwards Addl Data,Per 820413 Meeting W/Westinghouse,Nrc & Inel Re Fuel Rod Design & Info Re two-phase Reactor Coolant Pump Performance.Encls Withheld (Ref 10CFR2.790) ML20054B5731982-04-0707 April 1982 Responds to NRC 811006 Ltr Requesting Transient Analysis Data for Use in Calculations Performed for Reactor Sys Branch.Info Will Be Transmitted Via Westinghouse ML20039F6161981-12-29029 December 1981 Requests 2-yr Extension of RESAR-3S Preliminary Design Approval (PDA-7) to Allow for Continued Review of Significant New Safety Issues Raised Since TMI-2 ML19211A6641979-12-18018 December 1979 Forwards Amend 15 to RESAR-3S,in Response to NRC 791213 Request for Addl Info ML19249D8121979-08-11011 August 1979 Opposes Sale of Reactor to Philippines by Westinghouse. Other Ltrs & Petitions in Opposition Encl ML19208B6401979-08-0606 August 1979 Requests Issuance of Export License by Us.Full CP Issued After Review of PSAR & Topics Raised by 1978 IAEA Safety Mission ML19269C9021979-02-0202 February 1979 Responds to NRC Inquiry Re Choice of Custom Rather than Standardized Design for NSSS & Balance of Plant.Reliability Was Primary Goal for Turbine Generators ML20150E4121978-12-15015 December 1978 Forwards Copy of Amend 14 to RESAR-3S Documenting the Westinghouse 3411 Mwt Nuc Steam Supply Sys as Appl for 2-yr Extension of Preliminary Design Approval(PDA-7) for RESAR- 3S.None of Existing Matl in RESAR-3S Has Been Modified ML20244A4211977-10-24024 October 1977 Forwards Topical Rept Re Fuel Rod Bow Penalties.Application & Affidavit for Withholding Rept Also Encl.Rept Provides Basis for near-term Rev to Fuel Rod Bow Penalties 1982-05-27
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20054K2421982-05-27027 May 1982 Requests Withholding,Per 10CFR2.790,of Info Transmitted by EP Rahe to Tp Speis ML20054K2341982-05-27027 May 1982 Forwards Addl Data,Per 820413 Meeting W/Westinghouse,Nrc & Inel Re Fuel Rod Design & Info Re two-phase Reactor Coolant Pump Performance.Encls Withheld (Ref 10CFR2.790) ML20054B5731982-04-0707 April 1982 Responds to NRC 811006 Ltr Requesting Transient Analysis Data for Use in Calculations Performed for Reactor Sys Branch.Info Will Be Transmitted Via Westinghouse ML20039F6161981-12-29029 December 1981 Requests 2-yr Extension of RESAR-3S Preliminary Design Approval (PDA-7) to Allow for Continued Review of Significant New Safety Issues Raised Since TMI-2 ML19211A6641979-12-18018 December 1979 Forwards Amend 15 to RESAR-3S,in Response to NRC 791213 Request for Addl Info ML19249D8121979-08-11011 August 1979 Opposes Sale of Reactor to Philippines by Westinghouse. Other Ltrs & Petitions in Opposition Encl ML19208B6401979-08-0606 August 1979 Requests Issuance of Export License by Us.Full CP Issued After Review of PSAR & Topics Raised by 1978 IAEA Safety Mission ML19269C9021979-02-0202 February 1979 Responds to NRC Inquiry Re Choice of Custom Rather than Standardized Design for NSSS & Balance of Plant.Reliability Was Primary Goal for Turbine Generators ML20150E4121978-12-15015 December 1978 Forwards Copy of Amend 14 to RESAR-3S Documenting the Westinghouse 3411 Mwt Nuc Steam Supply Sys as Appl for 2-yr Extension of Preliminary Design Approval(PDA-7) for RESAR- 3S.None of Existing Matl in RESAR-3S Has Been Modified ML20244A4211977-10-24024 October 1977 Forwards Topical Rept Re Fuel Rod Bow Penalties.Application & Affidavit for Withholding Rept Also Encl.Rept Provides Basis for near-term Rev to Fuel Rod Bow Penalties 1982-05-27
[Table view] Category:VENDOR/MANUFACTURER TO NRC
MONTHYEARML20054K2421982-05-27027 May 1982 Requests Withholding,Per 10CFR2.790,of Info Transmitted by EP Rahe to Tp Speis ML20054K2341982-05-27027 May 1982 Forwards Addl Data,Per 820413 Meeting W/Westinghouse,Nrc & Inel Re Fuel Rod Design & Info Re two-phase Reactor Coolant Pump Performance.Encls Withheld (Ref 10CFR2.790) ML20039F6161981-12-29029 December 1981 Requests 2-yr Extension of RESAR-3S Preliminary Design Approval (PDA-7) to Allow for Continued Review of Significant New Safety Issues Raised Since TMI-2 ML19211A6641979-12-18018 December 1979 Forwards Amend 15 to RESAR-3S,in Response to NRC 791213 Request for Addl Info ML20150E4121978-12-15015 December 1978 Forwards Copy of Amend 14 to RESAR-3S Documenting the Westinghouse 3411 Mwt Nuc Steam Supply Sys as Appl for 2-yr Extension of Preliminary Design Approval(PDA-7) for RESAR- 3S.None of Existing Matl in RESAR-3S Has Been Modified 1982-05-27
[Table view] |
Text
,a N
)
v Westinghouse Nrear Tecmo!C2y Dmacn Water Reactor Electric Corporation Divislans e m 33 P,tisburgh Pentriana lb230 May 27, 1982 AW-82-30 Mr. Themis P. Speis, Assistant Director Reactor Safety Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
SUBJECT:
RESAR Data Acquisition via NRC to INEL REF: Westinghouse Letter, Rahe to Speis, NS-EPR-2607, May 27,1982
Dear Mr. Speis:
The subject material, as identified by the reference letter, is being pro-vided to the NRC pursuant to a meeting of April 13, 1982 at Bethesda, Maryland.
The material is to assist the NRC in confirming conservatism in the Westing-house models and calculations. It is generic plant information and not in-tended for docket at this time. To expedite review, the material as itemized in the reference letter was provided in draft form as a proprietary information precursor to subsequent material that may be needed for docket.
The material will not be employed as part of a license application or other action identified in 10CFR 2.790(a) at this time. It will be separately sub-mitted with an Application for Withholding accompanied by an Affidavit meeting the requirements of 10CFR 2.790(b) prior to such use.
Accordingly, we request that the material be treated as proprietary informa-tion within the provisions of 10CFR 9.5(4), " Freedom of Information Act Regu-lations." If there is a need to make public disclosure of the material prior to a separate Westinghouse submittal for docket in accordance with the pro-visions of 10CFR 2.790(a), please notify Westinghouse prior to making a dis-closure determination.
Correspondence with respect to the proprietary aspects of this submittal should reference AW-82-30 and should be addressed to the undersigned.
Very truly yours, 444A44 %
Robert A. Wiesemann, Manager
/bek Regulatory & Legislative Affairs -
cc: E. C. Shomaker, Esq.