,x LONG ISLAND LIGHTING COMPANY gg
< Nam /*w SHOREHAM NUCLEAR POWER STATION P.o. sox 618. NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 June 29, 1982 SNRC-723
/
i Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 SER Item No. 60 - Procedures & Training Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322
Dear Mr. Denton:
SER Item No. 60, which is presently classified as " Resolved Pending Confirmation", requires that procedures and training relative to a loss of AC power at Shoreham be completed before fuel load.
Please be advised that these emergency procedures have been completed and approved, and are designated as follows:
a)
SP 29.015.01 Rev. 2 - Loss of Off-Site Power b)
SP 29.015.02 Rev. 0 - Loss of All AC Power In addition, the training required for these procedures will have been fulfilled by July 3, 1982 for the first licensing group, which consists of those personnel anticipated to have licenses by fuel load.
This training includes self-study and a walk-through of the procedures and transient by each candidate at the Limerick simulator.
LILCO requests that appropriate confirmatory action be scheduled and performed by the NRC no that this item can be completely closed.
Should you have any questions or require additional information, please contact this office.
Very truly yours, O
L. Smith 0p Manager, Special Projects 7
Shoreham Nuclear Power Station 8207010083 820629 RWG/pg PDR ADOCK 05000322 A
PDR cc:
J.
Higgins All parties
-,