ML20054J202

From kanterella
Jump to navigation Jump to search

Confirms GE Completion of Reanalysis of Limiting Transient Load Rejection W/O Bypass,Using Corrected Odyn Computer Code.Cleanup Tech Spec Submitted 820430 Not Affected
ML20054J202
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/21/1982
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Vassallo D
Office of Nuclear Reactor Regulation
References
LQA8200156, TAC-48385, NUDOCS 8206280286
Download: ML20054J202 (1)


Text

'l

" ""u'h5khbst""*"

Nebraska Public Power District LQA8200156 June 21, 1982 U.S. Nuclear Regulatory Commission Attention:

Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing Washington, DC 20555

Subject:

ODYN Transient Analysis Code Correction Cooper Nuclear Station NRC Docket No. 50-298, DPR-46

Dear Mr. Vassallo:

As discussed with our Project Manager June 18, 1982, this letter is written to confirm that General Electric has completed its reanalysis of the Limiting Transient (Load Rejection Without Bypass) for Cooper Nuclear Station, Cycle 8, using the corrected ODYN. computer code.

The results show an increase in uncorrected ACPR of 0.01 for all fuel types (8x8, 8x8R, and P8x8R) for this transient. The 10CFR50.59 Cleanup Technical Specifications submitted April 30, 1982, are not affected by this minor change in the limiting transient.

Sincerely,

. WM ay M. Pilant Division of Licensing and Quality Assurance JMP:JDW:cmk l

l 0

B206280286 820621 PDR ADOCK 05000298 p

PDR

_ _ _ _ _ _ _ _ _ _ _ _ _