i POWER AUTHORITY OF THE STATE OF NEW YORK to COLUMBUS CIRCLE NEw YORK. N. Y. loo 19 t2121 397 6200 G EOR,G,E 7. B ER RY o**"*"*
"'c'"
rnusvars JOHN W. BOSTON l
JowN s.DysoN lna'sio's'UNn'ocaounze
- =a'oa=a"c=
cronor t.
Noacts JCSEPH R. SCHedlEDEn vlC E CMaleMAN RES DE T & CMarr r
atCH AnD M. rLYNN noerar i. uittoNu tznoY w.,s, met,4m,_
raseenicx n. comme June 21, 1982
- ,,c;;,r,,"^acia' JPN-82-52 ygo,,,,.,,,y Director of Nuclear Reactor Regulation
."' 0,',',* ' ;",',* '."u' "'
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A.Fidzpatrick Nuclear Power Plant Docket No. 50-333 Inservice Inspection Program Request for Additional Information
Reference:
1.
D.B. Vassallo (NRC) to L.W.
Sinclair (PASNY) dated April 14, 1982 same subject 2.
P.J. Early (PASNY) to T.A.
Ippolito (NRC) dated September 10, 1979 (JPN-79-57) regarding Inservice Inspection Program Inservice Examination of Welds and Supports
Dear Sir:
The Power Authority submitted, via Reference 2, inser'vice inspection program relief requests for our FitzPatrick nuclear power facility.
As a result of your initial review, you req'uested additional information on these relief requests via Reference'~l.
For the reasons detailed below, additional time is required to provide the information requested by Reference 1:
1 Several of your questions require the detailed listing of the location, size and accessibility of welds and butting.
Plant records will have to be searched to compile this information in sufficient detail.
l
( 044 L
j 8206280078 820621 PDR ADDCK 05000333 G
I 2.
Several questions request sketches of specific piping wolds and, of the reactor vessel bottom head and vicinity to illustrate as-built interferences.
This will require some original work after these areas are physically detailed.
Much of this field work cannot be done while the plant is in operation.
3.
Requests for technical justification or proof (as requested for example by Item 8(a)) may require extensive research, analysis or discussion with industry and research groups.
Some of these requests require manufacturer design data, while others ask for justification and proof of industry accepted standards.
For these reasons, the Authority must postpone the submittal information by 120 days, or until October 15, 1982.
Responses requiring plant shutdown will be submitted 30 days after the end of the first outage of sufficient duration.
If you have any questions on this subject, do not hesitate to contact us.
Very truly yours, l,-
J.\\ MBatyn% N v
Senior Vice President IIuclear Generation cc: attached
-- =.. -._..-
i i
cc: Mr. J. Linville
' Resident Inspector U.S. Nuclear Regulatory Comission
. P. O. Box 136 Lycoming, New York 13093 4
l Mr. Ron Barton i
United Engineers & Construction, Inc..
30 S. 17th Street
- Philadelphia, PA 19101 s
2 l
h I
e j
i g
t i
t k
i l
4 l
l a
i s-r
, s,,
r rea
-e-v,-
, -,.. +
e-,
--r,-
-r
,-v.
,,n-a
, -, ~,,,
e-,na--
,..n.
e n, a,.-
e
.-v-
-, - -, -