ML20054H940
| ML20054H940 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 06/17/1982 |
| From: | Mclendon G LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3K82-0354, W3K82-354, NUDOCS 8206250232 | |
| Download: ML20054H940 (1) | |
Text
LOUISIANA f 242 ottanoNot sinen POWE R & L1G HT/ P O BOX 6008
- NEW OnLEANS. LOUISIANA 70174 * (504) 366-2345 E?lth s*<sYOj June 17, 1982 G. D. McLENDON Senior Vice President W3K82-0354 Q-3-A35.07.20 Mr. John T. Collins, Regional Administrator, Region IV
$)h U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 i
l j,
JUN 2 2 EE2
. i i
(
h
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 20
" Inadequate Design / Design Review of Instrumentation Seismic Support Drawings" Third Interim Report
Reference:
- 1) LP&L Letter W3K81-0432 to NRC dated December 3, 1981
- 2) Telecon - L. Martin (NRC) to L. Bass (LP&L) on June 16, 1982
Dear Mr. Collins:
In reference (1) LP&L committed to submit a final report on the subject Significant Construction Deficiency by June 15, 1982.
Ebasco Nonconformance Report W3-2333 addresses this problem and is being used to track corrective action. Mercury Company is in the process of reworking supports which were identified as being deficient. At this time rework is not complete.
It is anticipated that the corrective action will be complete and a Final Report submitted by August 2, 1982.
Very truly yours, GDMcL/LLB/ncd cc:
1)
Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 bY' 2)
Director Office of Management 2
Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8206250232 820617
~