Third Interim Rept Re Feedwater Isolation Valves - Temp Maint of Actuators.Physical Work on Corrective Action Complete.Extension Until 820713 to Submit Final Rept Requested
ML20054H918
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/17/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, Q-3-A35.07.26, W3K82-0355, W3K82-355, W3K82-35555E, NUDOCS 8206250194
Download: ML20054H918 (1)


Text

Lo uisiama , ,.e ouAmoNo< s1eu, P O W E F1 & L I G H T / P O BOX 0008

'$$biUSSSIO L

June 17, 1982 G D McLENDON Senior Vice President W3K82-0355 Q-3-A35.07.26 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission vi NI [

611 Ryan Plaza Drive, Suite 1000 )

g7 .

Arlington, Texas 76012 l l

b ,'

" e~ ',

SUBJECT:

Waterford SES Unit No. 3 .

Docket No. 50-382 Significant Construction Deficiency No. 26 "Feedwater Isolation Valves - Temperature Maintenance of Actuators" Third Interim Report

Reference:

1) LP&L Letter W3K81-0363 to NRC dated October 1, 1981
2) Telecon - L. Martin (NRC) to L. Bass (LP&L) on June 16, 1982

Dear Mr. Collins:

The physical work on the corrective action for the protection of the actuators is complete. However, NCR W3-3872 and NCR W3-3483 resulted from work accomplished as part of the corrective action. The conditions addressed on the two nonconformance reports must be corrected prior to reporting the final corrective action complete. LP&L respectfully requests an extension on SCD No. 26 until July 13, 1982 at which time a final report will be submitted.

Very truly yours, GDMcL/LLB/ncd < v M i

cc: 1) Director Office of Inspection & Enforcement U. S. .iuclear Regulatory Commission Washington, D. C. 20555

2) Director Office of Management N Information and Program Control U. S. Nuclear Regulatory Commission p Washington, D. C. 20555 8206250194 820617 PDR ADOCK 05000382 C PDR