ML20054H918
| ML20054H918 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 06/17/1982 |
| From: | Mclendon G LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, Q-3-A35.07.26, W3K82-0355, W3K82-355, W3K82-35555E, NUDOCS 8206250194 | |
| Download: ML20054H918 (1) | |
Text
Lo uisiama,
,.e ouAmoNo< s1eu, P O W E F1 & L I G H T / P O BOX 0008
- NEW OALEANS LOUISIANA 70174 * (5041 366 2345
'$$biUSSSIO L
June 17, 1982 G D McLENDON Senior Vice President W3K82-0355 Q-3-A35.07.26 NI [
Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission vi
)
611 Ryan Plaza Drive, Suite 1000 l
g7 Arlington, Texas 76012 l
b e
" ~ ',
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 26 "Feedwater Isolation Valves - Temperature Maintenance of Actuators" Third Interim Report
Reference:
- 1) LP&L Letter W3K81-0363 to NRC dated October 1, 1981
- 2) Telecon - L. Martin (NRC) to L. Bass (LP&L) on June 16, 1982
Dear Mr. Collins:
The physical work on the corrective action for the protection of the actuators is complete. However, NCR W3-3872 and NCR W3-3483 resulted from work accomplished as part of the corrective action. The conditions addressed on the two nonconformance reports must be corrected prior to reporting the final corrective action complete.
LP&L respectfully requests an extension on SCD No. 26 until July 13, 1982 at which time a final report will be submitted.
Very truly yours, M
GDMcL/LLB/ncd v
i cc:
1)
Director Office of Inspection & Enforcement U. S..iuclear Regulatory Commission Washington, D. C. 20555 2)
Director Office of Management N
Information and Program Control U. S. Nuclear Regulatory Commission p
Washington, D. C. 20555 8206250194 820617 PDR ADOCK 05000382 C