ML20054H613
| ML20054H613 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/18/1982 |
| From: | Will Smith INDIANA MICHIGAN POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20054H614 | List:
|
| References | |
| NUDOCS 8206240262 | |
| Download: ML20054H613 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
Y vstNn--lN0lMAAMlCMlGM POWER COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458 Bridgman, Michigan 49106 (616) 465-5901 June 18, 1982 Mr. J.G. Keppler, Regicmal Administrator Unital States Nuclear Regulatory Ommission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
Dear Mr. Keppler:
Pursuant to the requirements of the Appendix A Technical Specifications, the following report /s are submitted:
RO 82-041/03L-0 RO 82-042/03L-0 Sincerely, cubR W.G. 9nith, Jr.
Plant fhnager
/bab cc:
J.E. Dolan 2.S. Ihnter R.W. Jurgensen R.F. Kroeger K.J. Vehstedt E. Swanson/N. D2Bry RO:III R.C. Callen MPSC G. 01arnoff, Esq.
J.M. Hennigan W. Lavallee EPRI INPO PNSRC J.F. Stietzel (1p E.L. 'Ibwnley Dir., IE (30 copies) 8206240262 820618
~
g>4/
Dir., MIPC (3 copies)