Summary of 820527 Meeting W/Util,United Engineers & Constructors & Anl in Philadelphia,Pa to Resolve Open Items Re Electrical Portion of Power Sys Branch Safety Review of OL Application
ML20054H394
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/14/1982
From: Larry Wheeler
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8206240001
Download: ML20054H394 (5)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

, ,, c JUN 141982 Docket Nos. 50-443 and 50-444 APPLICANT: Public Service Company of New Hangshire FACILITY: Seabrook. Station, Units 1 and 2

SUBJECT:

N ETING SUP9%RY On May 27, 1982. the NRC staff representative from Power Systems Branch (PSB) met with applicant representatives at the United Engineers and Constructors, Inc. offices in Philadelphia, Pennsylvania. Enclosures 1 and 2 are copies of the meeting notice and attendance roster.

The meeting proceeded within the framework described in the agenda. It was agreed at the beginning of the meeting that di scussions should first focus on clarification of PSB (electrical) open items. Any remaining time would than be devoted to discussfog the adequacy of any proposed applicant responses.

The meeting produced the following results:

1. The entire time was ~ devoted to discussions of open item claftfica-tions.
2. The applicant has sufficient infomation to respond sptisfactori ly to most of the open items. Formal responses will be fomarded for staff review.
3. Time limitations prevented addressing all of the items. The few remaining items will be carried forward to the next meeting.
4. Also to' be carried fomardt.to the next meeting will be a small numberfof items requirihg more information than what was readily available at this mejeting.

~

All the open items discussed will appear in a preliminary draft of the Safety Evaluation Report (SER) to be forwarded to the applicant in the near future. The draft SER is not going to be delayed to accommodate the results of this meeting.

34aedBys Louis L. Wheeler, Project Manager Licensing Branch No. 3 Division of Licensing

Enclosures:

As stated 8206240001 820614 PDR ADOCK 05000443 A PDR a.. e.. .. a

"'c'> ..LBA D1. . . . .LB ... ... .. ... .. . . .. ........ .. . ..... . ........ ....... .. .......... ......... ..... .

""" Y .LM pf.;CZ- .. 1ia.. . .... . .. . . .. . .. .. . . ~........~ . .... . . ... ........... ..... ....... ~..

can) /82 82 l

............ 3 . . . . .............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

NRC FORM 310 #10s801 NRCM 0040 OFFICIAL RECORD COPY ' " " -329e24

1  ?

MEETING

SUMMARY

DISTRIBUTION _

LPDR umentControl(50-443[444) )

PDR 1 NSIC TERA LBf3 Flies 9 e

IJLee LWheeler PM
  1. 4 ttorney, OELD

[

-2 RECCfygg Regional Administrator, Region I  ?

NRC Participants L."gdONJ 7 h. --

9 J t

% y N

i i

i j cc: Service List i

i l

SEABROOK William C. Tallman Chairman and Chief Executive Officer Public Service Company of New Hampshire P. O. Box 330 ,i Manchester, New Hampshire 03105 John A. Ritscher, Esq. E. Tupper Kinder, Esq.

Ropes and Gray Assistant Attorney General 225 Franklin Street Office of Attorney General Boston, Massachusetts 02110 208 State House Annex Concord, New Hampshire 03301 Mr. Bruce B. Beckley, Project Manager Public Service Company of New Hampshire The Honorable Arnold Wight P. O. Box 330 New Hampshire House of Representatives Manchester, New Hampshire 03105 Science, Technology and Energy Committee State House G. Sanborn Concord, New Hampshire 03301 U. S. NRC - Region I 631 Park Avenue Resident Inspector King of Prussia, Pennsylvania 19406 Seabrook Nuclear Power Station c/o U. S. Nuclear Regulatory Commission Ms. Elizabeth H. Weinhold P. O. Box 700 3 Godfrey Avenue Seabrook, New Hampshire 03874 Hampton, New Hampshire 03842 Mr. John DeVincentis. Project Manager Robert A. Backus, Esq. Yankee Atomic Electric Company O'Neill . Backus and Spielman 1671 Worcester Road 116 Lowell Street Farmingham, Massachusetts 01701 Manchester, New Hampshire 03105 Mr. A. M. Ebner, Project Manager Norman Ross, Esq. United Engineers and Constructors 30 Francis Street 30 South 17th Street Brookline, Massachusetts 02146 Post Office Box 8223 Philadelphia, Pennsylvania 19101 Karin P. Sheldon, Esq.

Sheldon, Harmon & Weiss Mr. W. Wright, Project Manager 1725 I Street, N. W. Westinghouse Electric Corporation Washington, D. C. 20006 Post Office Box 355 Pittsburg, Pennsylvania 15230 Laurie Burt Esq.

Office of the Assistant Attorney General Thomas Dignan, Esq.

Environmental Protection Division Ropes and Gray One Ashburton Place 225 Franklin Street Boston, Massachusetts 02108 Boston, Massachusetts 02110 D. Pierre G. Cameron, Jr., Esq.

General Counsel Public Service Company of New Hampshire P. O. Box 330 Manchester, New Hampshire 03105

, , ,' s ENCLOSURE 1

  1. gSt EECog
  1. h,, UNITED STATES

! c NUCLEAR REGULATORY COMNilSSION

{  ; E WASHINGTON,0. C. 20555

. 9, a

%, * * * * * /

MAY 171982' Docket Nos.: 50-443 and 50-444 -

'I MEMORANDUM FOR: F. J. Miraglia, Chief, Licensing Branch No. 3, DL FROM:

L. L. Wheeler, Project Manager, Licensing Branch No. 3, DL

SUBJECT:

POWER SYSTEMS BRANCH MEETING WITH SEABROOK REPRESENTATIVES DATE & TIME: May 27, 1982 9:00 AM - 2:00 PM LOCATION: United Engineers and Construction, Inc.

30 South 17th Street Philadelphia, PA PURPOSE: Resolve open items related to tie electrical portion of the Power Systems Branch (PSB) safety review of the Seabrook OL application AGENDA:

Participants meet to discuss open items related to applicant responses to PSB requests for additional information. The sequence of items to be discussed is at the descretion of the participants. Within the time limits designated above, participants may discuss any other issues related to the PSB Seabrook review.

PARTICIPANTS: NRC L. Wheeler, J. Knox PSNH H. Katz, et. al. .

LM L. Yeeler, Project Manager Licensing Branch No, 3 j Division of Licensing cc: See next page NOTE: NRC meetings are open to interested members o'f the public to attend as observers. Members of the public who wish to attend this meeting must contact L. Wheeler (301/492-7792) no later than 3:45 pm, May 25,1982

,8Y

. >?

ENCLOSURE 2 4

ATTENDANCE ROSTER

~.

NRC Staff' L. Wheeler 4

J. Knox Yankee Atomic Electric Company D. Maidrand F..Baxter G. Tsouderos

United Engineers and Constructors, Inc 1

D. Rhoads H. Katz G. Aggarwal i G. Morris H. Parker A. Triboletti Argonne National Laboratory I.

R. Gusftason M. Musko 4

I

, __ . . _ . . . _ . _ _ _ , . - . . . - . . , . . . . . , . , , , - . . . , . . , , _ . _ . . . _ , , . . . _ , , ~ .