O l.OUISIANA f,42 ouAnoNoE S1nn1 POWER S LIGHT / P O DOX 6008
- NEW OnLEANS. LOUISIANA 70174 * (504) 366 2345 U$\\ISlN)
June 14, 1982 G. D. McLENDON Senior Vice President W3K-82-0341 Q-3-A35.07.46 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Interim Report of Significant Conscruction Deficiency No. 46
" Cooper-Bessemer Emergency Diesel Generators Agastat Relay Defect" Second Interim Report Peference:
1)
Interim Report W3K82-0144 from LP&L to NRC dated March 9, 1982
- 2) Telecon - R. Bennett (LP&L) to L. Martin (NRC) on 6/11/82
Dear Mr. Collins:
We have now receiyed the first seventy-four (74) control relays from Diesel Generator "A".
Fifty-eight (58) each were verified acceptable and sixteen (16) each had to change the relay bases.
After reinstallation of the control relays for Generator "A" is complete, the remaining seventy-four (74) control relays for Diesel Generator "B" will be removed and returned to Amarace Corporation for repair / replacement. Turn around time has been reported to be four (4) weeks plus removal / reinstallation requirements.
A Final Report will be submitted to the USNRC by August 13, 1982.
Very truly yours, GDMcL/LLB/grf 8206210475 820614 PDRADOCK05000g
Mr. John T. Collins Page 2 cc:
- 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
- 2) Director Office of Management Information and Program Control i
U. S. Nuclear Regulatory Commission Washington, D. C. 20555