' ta Consumers Power James W Ceek b
f Vice President - Projects, Engineering and Construction General offices: 1945 West Pernell Road, Jackson, MI 49201 e (517) 7880453 June 16, 1982 Harold R Denton, Director Office of Nuclear Reactor Regulation Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT MIDLAND DOCKET NOS 50-329, 50-330 AFW SYSTEM FILE: 0926 SERIAL:
17311 ENCLOSURE:
(1) AFW Three Pump Reliability Analysis
REFERENCES:
(a) J W Cook Letter to II R Denton, Serial 16008, Dated 3/1/82 (b) J W Cook Letter to H R Denton, Serial 16872, Dated 4/27/82 (c) J W Cook Letter to 11 R Denton, Serial 11223, Dated 2/23/81 i
During the past year we have been working with the Staff in attempting to provide information sufficient to demonstrate that the upgraded Midland Plant AFW system met the NRC criteria for system unavailability (Reference (a)).
When it became apparent that no two pump systems would be acceptable to the Staff, CP Co decided to commit to the installation of a third auxiliary feedwater pump for each unit by the end of each units second refueling outage (Reference (b)).
Enclosure (1) is a revision to the original AFW reliability analysis submitted on February 28, 1981 (Reference (c)) in response to the NUREG-0737 Item II.E.1.1.
This analysis shows that the 3 pump AFW system unavailability is clearly in the range of the unavailability goal set forth in SRP Section 10.4.9.
In addition, the analysis has been revised to show the unavailability for both the 2 and 3 pump systems at 15 minutes which would still ensure adequate core cooling.
oc0582-1013a131 8206180084 820616 PDR ADOCK 05000329 A
PDR U
A 2
t,.
In summary, we believe the Staff will concur that our proposed three pump AFW -
system clearly meets the SRP reliability criterion, provides the additional margin of safety sought by the Staff and is thus satisfactory. With this i
submittal the Staff should be able to close-out the followup requirement of SER Section 10.4.9.
JWC/ PEP /fms CC RJCook, Midland Resident Inspector RHernan, US NRC OParr, US NRC DBMiller, Midland Construction (3)
RWHuston, Washington 4
oc0582-1013aI31
CONSUMERS POWER COMPANY Midland Units 1 and 2 Docket No 50-329, 50-330 Letter Serial 17311 Dated June 16, 1982 At the request of the Commission and pursuant to the Atomic Energy Act of 1954, and the Energy Reorganization Act of 1974, as amended and the Commission's Rules and Regulations thereunder, Consumers Power Company submits the AFW three pump reliability analysis.
CONSUMERS POWER COMPANY l
By L
W Cooic, Vice President Pro ' cts, Engineering and Construction Sworn and subscribed before me this lh day of June, 1982.
~_
Nwsmer Jackson County, Michigan My Commission Expires September 8, 1984 oc0582-1013b131 r
r
~
'e Enclosure (1) to Letter Serial No 17311 1.
Updated Tables 6 and 9 From Original AFW Reliability Analysis 2.
Conceptual Schematic of the Midland 3 Pump AFW System 3.
Reliability Analysis - 3 Pump AFW System
.