' . 1 . .+diMb e ,

THE CINCINNATI GAS & ELECTRIC COMPANY W CINCINNAT1, OHIO 4520t E. A. BORG MANN SENIOR veCE PRESLDENT June 11, 1982 QA-1811 U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler Regional Administrator RE: Wm. H. ZIMMER NUCLEAR POWER STATION UNIT 1 10CFR50.55(e) - ITEM E ELECTRICAL SEPARATION - DOCKET NO. 50-358 - CONSTRUCTION PERMIT NO. CPPR W.O. #57300 JOB E-5590 FILE NO. NRC-7 E-19 Gentlemen:

This letter constitutes an interim report concerning the subject condition reported under the requirements of 10CFR50.55(e).

As a result of preliminary evaluations concerning elec-trical separation, CG&E has deemed that Item E-19 is reportable.

The Architect-Engineer did not adequately translate applicable electrical separation criteria into the installation specifica-tions and/or drawings for those items to be routed by the contractor.

As a result, the site general contractor could not adequately develop all inclusive electrical separation inspection criteria.

Corrective Action Reports have been issued to the Architect-Engineer instructing him to adequately translate the design basis into the installation specifications. Further evalua-tion is required to properly assess proposed corrective action replies and the design basis for electrical separation to determine the proper corrective action to be taken. This evaluation and 8206170349 820611 PDR ADOCK 05000350 S PDR JUN 141982

{Ea'l

Mr. J. G. Keppler 1

Regional Administrator Region III June 11, 1982 - QA-1811 Page 2 corrective action is expected to be completed by August 6, 1982.

A final report will be rubmitted by August 16, 1982.

We trust the above will be found acceptable as an interim report under 10CFR50.55 (e) .

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By E. A. Borgmann Senior Vice President EAB:aml cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 ,

i NRC Senior Resident Inspector Attn: W. F. Christianson