ML20054F435

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Amend 4 to Emergency Plan & Amend 1 to Nuclear Contingency Plan & Procedures.Plans Meet 10CFR50.47 & App E Requirements.Privacy Info Deleted.W/O Amend 4 to Emergency Plan
ML20054F435
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/12/1982
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20054F432 List:
References
NUDOCS 8206160333
Download: ML20054F435 (3)


Text

. 0 -

ARKANSAS POWER & LIGHT COMPANY FIRST NATIONAL BUILDING /P.O. BOX 551/UTTLE AOCK. AAKANSAS 722o3/t501) 371-4422 May 12, 1982 WILLfAM CAVANAUGH, lll Senior Vice President Energy Supply OCAN058205 Mr. John T. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Arkansas Nuclear One - Units 1 and 2 Occket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Amendment Number 4 to ANO Emergency Plan and Amendment Number 1 tn AP&L Nuclear Contingency P1an and Procedures' "

(File: 1510.4) l

! Gentlemen:

As required by 10CFR50.54 attached are thfrteen (13) copies (3 copies to Mr. Collins and 10 copies to Mr. Eisenhut) of Amendment Number 4 to the l AN0 Emergency Plan and Amendment Number 1 to the AP&L Nuclear Contingency Plan and Procedures. The changes which make up these amendments are a result of further refinement of these plans and-procedures, incorporating l NRC, INP0 and in-house comments. It was determined, followig a review of these Amendments, that these changes will increase the effectiveness of the plans. The plans, a', changed, continue to meet the standards of 10CFR50.47 and the requirements of Appendix E to that part. __

8206160333 820614 fDRADOCK 05000313 ph t l'

-i O Mr. John T. Collins 1 May 12, 1982 Mr. Darrell G. Eisenhut Revision 1 to Contingency Plan Procedure 9 will incorporate AP&L's agreement with Oak Ridge for high level post accident sampling as committed in our letter to Mr. Collins dated April 8, 1982 (9CAN648205).

This revision will be completed by July 31, 1982.

4 Names and telephone numbers have been deleted from the attached Contingency Procedure due to their proprietary nature.

4 Very truly your ,

b .

William Casanaugh III WC:DEJ:nak Attachments Amendment 3 ANO 3 copies to Mr. Collins Emergency Plan 10 copies to Mr. Eisenhut Amendment 1 AP&L Nuclear 3 copies to Mr. Collins Contingency Plan Procedures 10 copies to Mr. Eisenhut

. w

. i i _ _

1

,, ..r, - - - - , - e-.. , -- ~ - - -- ,,-- .

. ..e . w, .r. , -,.,-a----, e, , .--

.i RECORD OF REVISION l

RemovePage(sj.

Replace or Add Page(s)

All of Contingency Plan i, ii, iii and pages 1thr5 ugh 47 Cover sheet and Cover and identified identified Revised pages pages as shown on cover sheet l All of Appendix A l

s I

)

)

i

?

i