ML20054F209

From kanterella
Jump to navigation Jump to search
Forwards Heavy Loads Handling Review - Control of Heavy Loads Over or in Close Proximity to Irradiated Fuel or Critical Safety Sys Components, Per NRC 801222 Request. Open Items Will Be Resolved Per NUREG-0612 Guidelines
ML20054F209
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/03/1982
From: Tauber H
DETROIT EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20054F210 List:
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR EF2---57-432, NUDOCS 8206150316
Download: ML20054F209 (2)


Text

,

herry Tauber h;

r nd Ccostruc*e Detfoit Edison ist?AB "i>-

June 3, 1982 EF2 - 57,432 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Eisenhut:

References:

1.

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 2.

Reactor Building Crane - T31 3

NRC letters from D. G. Eisenhut, December 22, 1980 and Feburary 3, 1981 4.

NUREG-0612, " Control of Heavy Loads at Nuclear Power Plants - Resolution of Tap A-36" 5

Detroit Edison Partial Response December 3, 1981 - EF2 - 55,382

Subject:

Control of Heavy Loads over or in Proximity to Irradiated Fuel Your letter of December 22, 1980 requests that the control of handling heavy loads in close proximity to irradiated fuel or shutdown safety systems, be reviewed to determine the extent to which NUREG 0612 guidelines are being satisfied and to identify any necessary changes to achieve satisfactory compliance with these guidelines.

NRC Requested Action l

l For applicants for Operating Licenses, it is requested j

that a report be submitted within 6 months providing j

the information requested in Section 2.1 of enclosure 3 l

of the December 22, 1980 letter.

It is further requested that an additional report be submitted within 9 months providing the information required in sections l

2.2 and 2 3 of this same enclosure.

1 i

9206150316 B20603

! f. pMd PDR ADOCK 05000341 A

PDR I g

14r. D. G. Eisenhut June 3, 1982 EF2 - 57,432 Page 2 Edison Response The attached report contains Edison's response to your requests.

This report also covers the information already included in our partial response of December 3, 1981.

Because the Fermi 2 heavy load handling review has to address certain handling situations that still cannot be clearly defined, complete resolution of all the NRC requested actions cannot be achieved at this time.

However, it is Edison's intention to achieve resolution of any open items, addressing the NUREG-0612 guidelines.

The attached report identifies those items requiring further Edison action and provides a commitment requiring each action to be completed prior to any ini-tial heavy load handling involvements after the plant is in operation.

If you have any questions, please contact Mr. L. E.

Schuerman, (313) 649-7562.

Sincerely, N

Attachment cc:

L. L. Kintner B. Little l

.