ML20054F168
| ML20054F168 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 06/03/1982 |
| From: | Myrabo A NORTHERN STATES POWER CO. |
| To: | |
| Shared Package | |
| ML20054F166 | List: |
| References | |
| NUDOCS 8206150278 | |
| Download: ML20054F168 (4) | |
Text
-
JUN,
ISgg t
OPERATING DATA REPORT DOCKET NO.
5 0 - 2 6 3 _ _ _._._.
DATE 6-3-82___
COMPLETED BY A.
L.
Myrab.
TELEPHONE 612/2(75-515 OPERATING STATUS l Notes 1.
Ur I Name M o n t i c e L t o 1
2.
Reporiinq perind:
_._.______.______._.MAY l
3.
Licensed Thermal Pouer (hWt)
_._______ ___i670 l
4.
NamenIate Rating (Gross MWe)
._ _._ _ _._ _ _ _ _ _ _ _ 5 6 9 l
5.
Des i gn Elec tr ica l Rating (Net MWe)
______S45.4 1
6.
Maximum Depondable Capacity (Gross HWe)-
_.553 1
7.
Maxtmum Dependable Capacity (Net MWe)
_. 5 2 5 l______.______.__..__________.___.._
0.
If Changes Occur in Capacity Raiinas (Items Number 3 Through 7) Since Last Report. Give Reasons:
_._.N/A.___.____________._._.___..____._._._.__._________.__.__.
9.
Power Levei To Which Restritted, If Any (Nol MWe)
___.N/A
- 10. Reasons For Restrictions. If Any:
_N/A.___
Th i s lion t h Yr.-to-Dato Cumulative ti. Hours In Reporting Period
____._744
___._3623
. _ _ _ _ 957i'.
- 12. Number Of Hours Reactor Was Criticat
_._744.0
___31G1.O
_ _ _ 701 16. c
- 13. Peactor Reserve Shutdown Hours
_ __._._ __ 0. 0
._0.0
______940.
- 14. Hours Gwnerator On-Line
.__744.0
.__.3103.4
. _ _ 76313.
- 15. Unit Reserve Shutdown Hours
.__0.0
__.___._0.0
_ __ _. _ _ _ 0. (
- 16. Gross Thermil Energy Generated (MWH)
_ 995015
_ 4756274 12443061<
- 17. Gross Electrical Ener9y Generated (MWH)
_.33W739
__i597219
__3960257(
- 10. Net EtectricaL Energy Generatcd (MWH)
_._317595
__1533693
__3787691;
- 19. Unit Service Factor
__100.0%
.__ 85.7%
____ 7'7.7-
- 20. Unit Availabii.ity Factor
._100.0%
___ 05.7%
_ _ _. _ 79.7; 75.47
- 21. Unit Capacity Factor (Using MDC Net)
.__ 81.3%
__._ 00.6%
- 22. Unit Canocitv Factor (Using DER Net)
__ 79.9%
_ _ _ 79.2%
_ _ - 74.1h r rced Outage Rate 0.0%
3.0%
6.0d
- 23. Unii a
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
_..Sertember 4,
1982 - Refueling out me - 4 2 d a y s _ _.. _. _. _.__.__ __ _ _ __ _ __ _. _.
?5. If
'h " e Down fi t End uf Report Period, Esiimated Dato uf i =, r t u p.. _ __ N / A _. _ _.._
- 26. Units In Test Status (P-ior to Connaerc i a L Om w tion) dei Forecast Achieved INI TI A!. CRITICAL 1IY INITIAL ELECTRICITY COMMERCIAL OPERATION 8206150278 820610 PDR ADOCK 05000263 R
6 AVERAGE DAILY UNIT POWER LEVEL-
~
DOCKET N0'.
50-263______
UNIT. Mont i ce L Lo__
DATE 6-3-82____
' COMPLETED BY A.
L. Myrab.
TELEPHONE 612/295-515' MONTH ______MAY
. DAY AVER GE' DAILY POWER LEVEL DAY
' AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i
__________509____________
17
__________493____________
2-
____437____________
18
__________429______.._____.
3
__________511____________
19
__________435____________
4
__________501____________
20
__________437____________
5
__________501____________
21
__________435____________
6
__________492____________
22
__________390____________
7
_________445____________
23
__________249____________
8
__________454____________
24
__________487_..__________
o.
-_________458____________
25
__________422____.._______.
10
__________493____________
26
__________427____________
ii
__________426 27
__________476____________
__________19_9____________
9_8
__________468____________
i,c il.
__________434_______-_---
29
_-___-____417-_-----____-
p-a 30-
_ _ _ _ _ _ _ _ _ _ c,10 n
i,,
__________i->________.._..
15
__________400____________
31
__________268____________
16
__________250____________
INSTRUCTIONS On this format, List the average daily unit power Levet in HWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
NAPRATIVE
SUMMARY
OF-OPERATING: EXPERIENCE.
' DOCKET NO.
.50-263______;
DATE 6 '3-82____
COMPLETED-BY A. L.-Myrabo.
1 TELEPHONE 612/295-5151 MONTH.______MAY i
4 5-1-82 4
to Power operation.
g t, ' 31-82 i
f i
i 1
i i
1 4
I4 4
1 i
Note: Power operation defined as essentially 100% of rated power except for weekend load dropt for specified surveillance testing.
Unit in end-of-cycle coastdown status.
The unit load followed extensively throughout t h e (non t h.
I i
a
,i
50-263-DOCKET NO.
UNIT SilUTDOWNS tND POWI R REDUCTIONS Monticello UNIT N 4%f E t
D.\\TE 6-3-82 COMPLETED BY A. L. Myrabo REPORT MONTil MAy TELEPHONE 612/295-5151 jg 3
h=yi Licensee 5-r.,
hk Cause & Corre,tne
- lg Eseni 3
g.
aam,n io
- s..
Doc g
f:
y
~ f, 5 Reporr=
zL y --
Present Recurrente w
6 i
l 6
5-16-82 S
0.0 11 4
N/A ZZZZ ZZZZZZ Dispatcher-requested load reduction.
7 5-23-82 S
0.0 11 4
N '.s ZZZZ ZZZZZZ Dispatcher-requested load reduction.
~
8 5-30-82 S
0.0 11 4
N/A ZZZZ ZZZZZZ-Dispatcher-requested load reduction'.
l i
)
l l
l l
I 2
3 4
~
F: Forced Reason:
Method:
Exlubit G - lnstructies S. Sched:ded A Equipment Failure t F.xplaint 1 Manual for Preparation of Data -
l Bataintenance of Test 2-Manual Scram.
Entry Sheets for Licensee I
C. Refueling 3 Autonutie Scram.
Event Report (LER) File (NUREG.
D Reg 2tatory Restriction 4 Other (Explain) 0161)
E Gperator Trainingi License Eumination l
F-Adr.iinist rati.e 5~
G-Operational Error (Explain)-
Exhibit I - Same Source 08/77)
Il O:hcr (ExplainI l
m -
-t