ML20054F082
| ML20054F082 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/04/1982 |
| From: | J. J. Barton GENERAL PUBLIC UTILITIES CORP. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20054F083 | List: |
| References | |
| 4400-82-L-0092, 4400-82-L-92, NUDOCS 8206150200 | |
| Download: ML20054F082 (1) | |
Text
.
GPU Nuclear (Id
]
g gg P.O. Box 480 2
Middletown, Pennsylvania 17057 717-944-7621 Writer's Direct Dial Number:
June 4, 1982 4400-82-L-0092 Office of Inspection and Enforcement Attn:
Mr. Ronald C. Haynes, Director Region 1 U. S. Nuclear 14alatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Sir:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 Quarterly Dose Assessment Report - First Quarter 1982 Attached per the requirements of Section 3.2.c of Appendix B to the Recovery Technical Specifications is the Quarterly Report of radio-logical releases and estimated doses. Attachment 1 represents the summary of releases listing estimates of total activity of each nuclide and the time rate of release of each nuclide. Attachment 2 is the interpretation of Attachment 3, the Dose Summary Table. The reporting period includes the time period from January 1, 1982 to March 31, 1982.
The dose summary table presents a summary of the maximum hypothetical and/or real doses to individuals and the general population. These doses were extracted from the calculational models and are the bounding dose for all cases.
Sincerely,
(
J. J. Barton Acting Direc or, TMI-2 JJB:RBS:djb Attachment cc:
L. H. Barrett. Deputy Program Director - TMI Program Office Dr. B. J. Snyder, Program Director - TMI Program Office 206150200 820604 DR ADOCK 05000320 PDR 4
GPU Nuclear is a part of the General Public Utilities System I
.,, _.