Interim Deficiency Rept Re Deformation of Conductor Insulation in Multiconductor Cable Mfg by Okonite,Initially Reported 820421.No Addl Info Gathered.Cables to Be Examined by Vendor.Reportability to Be Determined by 820625
ML20054F022
Person / Time
Site: Washington Public Power Supply System
Issue date: 06/02/1982
From: Root R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, G1-82-277, GO1-82-0277, GO1-82-277, NUDOCS 8206150146
Download: ML20054F022 (1)


Text

ye O

.55(e) 50460/513,.O Docket Nos.

50 Report Washington Public Power Supply System yhD P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 June 2'0277 N'./$/'l 1982 G01 pgI?: 9'

'D4 l

Mr. R. H. Faulkenberry Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Subject:

NUCLEAR PROJECTS 1 AND 4 DOCKET NOS. 50-460 AND 50-513 P0TENTIALLY REPORTABLE CONDITION OKONITE CABLE

Reference:

Telecon ME Rodin, Supply System to PP Narbut, Region V Nuclear Regulatory Commission, dated April 21, 1982.

In the above reference, the Supply System informed your office of a potentially reportable deficiency under 10CFR50.55(e). The subject deficiency deals with deformation of the conductor insulation in multi conductor cable manufactured by Okonite.

The Project has met with Okonite and requested that they examine / test a series of cable samples to determine the extent of the identified discrepancies.

The information gained from that effort will be used by the Project to determine reportability. However, this examimtion and testing by Okonite will take longer than the thirty (30) days allotted under 10CFR50.55(e). Due to this extended evaluation period, we are unable at this time to provide your office with additional information beyond what was reported in the telecon of April 21, 1982.

It is antici-pated that all pertinent information will be gathered and reviewed by the Project to make a reportability determination by June 25, 1982.

If you have any questions or desire further information, please advise.

R. W. Root Acting Program Director RWR:MER:Im a

cc: CR Bryant, BPA/399 EW Edwards, Bechtel/860 V. Mani, UE8C/896 V. Stello, Director of Inspection, NRC A. Toth, NRC FDCC/899 8206150146 820602 PDR ADDCK 05000460 j