- 0 OPERATING DATA REPORT DOCKET NO. 50-348 DATE 6/03/82 COMPLETFD BY W.G. Ilairston, III TELEP110NE (20s) 899-5156 OPERA IING STAT US
- 1. Unit N.une:
Joset)h M. Farley - Unit 1 Notes 1) r.umulative data
- 2. Reporting Period: -_ May. 1982 since 12/01/77, date of
- 3. Licensed 1 hermal Power (MWI):
2652 commercial operation.
- 4. Nameplate Rating (Grow MWe):
860
- 5. Design Electrical Rating (Net MWe):
829
- 6. Maximum Dependabic Capacity (Gross MWe): 844.6
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity liatings (Items Number 3 Through 7) Since Last Report.Give Reasons:
N/A
- 9. Power Lesello Which Restricted.lf Any (Net MWe):
N/A
- 10. Reasons For Restrictiom,if Any:
N/A l
T his Month Yr. to-Date
'Cumulatis e
- 11. ilours in Reporting Period 744 3.623 39.431
- 12. Number Of Ilours Reactor Was Critical 744 2.122.1 23.103.9
- 13. Reactor Restne Shutdown flours 0
36.6 3.528.6
{
- 14. Ilours Generainr on Line 744 1.933.0 22.262.7 i
- 15. Unit Resene Shutdown liours O
n 0
- 16. Grow Ihermal Energy Generated (MWil) 1.955.244
_4.733.055 55.677.966
- 17. Grow Electrical Energy Generated (MWill 617.808
_1.491.910 17.728,862
- 18. Net Liectrical Energy Generated (MWil) 586.336 1.385.710 16.609.434
- 19. Unit Senice factor 100.0 53.4 56.5
- 20. Unit Asailability Factor 100.0 53.4 56.5
- 21. Unit Capacity I' actor (Using MDC Nes t 98.1 47.6 52.4
- 22. Unit Capacity Factor (Using DER Net) 95.1 46.1 50.8
- 23. Unit fmced Outage Rate 0.0 46.3 21.1
- 24. Shutdowns Scheduled Oser Next 6 Months (Typc.Date,and Duration of Each):
N/A
- 25. IIShut Down At End Of Report Period. I'stimated Date of Startup:
N/A
- 26. Units in lest Status (Prior to Commercial Operation):
Forecast Achiesed 1
INill A L CRI TIC All ry 8/06/77 8/09/77 l
iNillAL Ell'ClRICIIY 8/20/77 8/18/77 V
COMMERCI A L OPI:R A IION 12/01/77 12/01/77
/,
19/77) 8206140127 820608 DR ADOCK 05000348 PDR
,,4.j SC-348 DOCKET.'io.
~~
1R41T J.M. Erriny-Unit 1
(
D A gy, 6/03/82 i
COMPLETED BY W.C. hirston.;III I
'IELEPllONE (205) 899-5156 MONlli May t
DAY AVERAGE D AILY l'OWER LEVEL DAY AYERAGE DAILY POWER f,EVEL (MWe Net)
(MWe Net) 800 17 788' 2
RO1 gg 785 3
801 19 788 l
l
.g 802 20 788 5
791 21
791
)
790 6
792 22 790 7
791 23 g
792
- .g 791
]
9 795 25
'790
(:
1j 10 796 26 789 i
iI 796 27 772 749 793 a
12 791 783 13
- 9 789 785 g.g 30 745 787 g3 3g 789 16 INSTi1UCIIONS On this fonnu. list the sverage d.nly unit power levet in MWe Net for each d
- y in the reportmg month. Compute to
. the nearest whole ne;2 wait.
I i
i (9(17)
- i s
n 4
9 wom (,-
J' 41* *-
w e
W
n
- _\\
,s.
~
)
r UNITSiluTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J.M.
Farlev-Unit 1 DATE 6/03/82 REPORT MONTil May. 1982 COMPLETED BY U c Hairston. III TELEPllONE (205) 899-5156
'*L 3
t e.4 "A Licensee g r, g ".,
Cause & Corrective
-S*
c ce
.2 E
s e
g No.
Date g-58 5
.2 s 5 Event a 'a a-Action io 3.
E j5g Report =
j rN C Prevent Recurrence No Ur[it Shutdowns or Power Reductio ts in May, 1982 l
I I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D.Regulatusy Restsiction 4 Other (Explain) 0161)
E-Operator Training & Ucense Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
Il Other (Explain)
3 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MAY, 1982 There were no unit shutdowns or power reductions in the month of May.
The following safety-related maintenance was performed in the month of May:
- 1. Performed preventive maintenance and completed some design changes on diesel generators.
- 2. Radiation Monitor R-21 (Plant Vent Air Particulate). pump was replaced.
- 3. "A" charging pump miniflow valve was repacked.
- 4. BTRS valve leaks were repaired.
- 5. Inlet isolation valve associated with the flow control valve from MDAFW pump to Steam Generator 1A was. repaired.
-1 t.
1 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MAY, 1982 There were no unit shutdowns or power reductf.ons in the month of May.
The following safety-related maintenance was performed in the month of May:
- 1. Performed preventive maintenance and completed some design changes on diesel generators.
- 2. Radiation Monitor R-21 (Flant Vent Air Particulate) pump'was replaced.
- 3. "A" charging pump miniflow valve was repacked.
- 4. BTRS valve leaks were repaired.
- 5. Inlet isolation valve associated with the flow control valve from MDAFW pump to Steam Generator IA was repaired.
0 OPERATING DATA REPORT DOCKET No. 50-348 DATE 6/03/82 COMPLETED BY W.G. Hairston, III TELEP110NE (205) 899-5156 OPERATING STATUS
- 1. Unit Name:
Joseph M. Farley - Unit 1 Notes 1) Cumulative data
- 2. Reporting Period:
May, 1982 since 12/01/77, date of
- 3. Licensed Thermal Power (MWt):
2652 commercial operation.
860
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWel:
829 844.6
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7).Since Last Report. Give Reasons:
N/A
- 9. Power Lesel To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasom For Restrictions.lf Any:
N/A This Month Yr.-to Date Cuniulatne 744 3.623 39.431 i1. Hours In Reporting Period
- 12. Number Of Ilours Reactor Was Critical 744 2.122.1 23.103.9
- 13. Reactor Resene Shutdown Hours 0
36.6 3.528.6 i4. Ilours Generator On-Line 744 1,933.0 22.262.7
- 15. Unit Resene Shutdown Hours 0
n 0
- 16. Grow Thermal Energy Generated (MWii, 1.955.244 4.733.055 55.677.966 17 Grow Electrical Energy Generated (MWHI 617.808 1.491.910 17.728.862
- 18. Net Electrical Energy Generated (MWH) 586.336 1,385.710
_16.609,434
- 19. Unit Senice Factor 100.0 53.4 56.5 l
- 20. Unit Availability Factor 100.0 53.4 56.5
- 21. Unit Capacity Factor (Using MDC Net) 98.1 47.6 52_4
- 22. Unit Capacity Factor (Using DER Net) 95.1 46.1 50.8
- 23. Unit Forced Outage Rate 0.0 46.3 21.1
- 24. Shutdowns Scheduled Oser Next 6 Months tType, Date.and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operationi:
Forceast Achiesed INITI A L CRITICA LITY 8/06/77 8/09/77 ps INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPER AIlON 12/01/77 12/01/77 (9/77)
50-348 DOCELT.'40.
LMIT J.M. F'rley-Unit 1 I]-
DA1E 6/03/82 s
CO.\\f!'LETED BY W.G. Hairston. III
/
1ELEPl!ONE (205) 899-5156 31070l!
May DAY AVERAGE D \\lLY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net!
800 17 788' I,
785 13 2
Ro1 788 801 19 3
802 20 788 4
5 791 21'~
791 790 792 3
6 790 7
791 23 791 g
792 2.g
]
795 25 790
~
9 10 796 26 789 772 11
_ 796
- 7 749 793 3
12 791 783 13
,9 789 785 I.1 30 745 787 gg 3g 789 16 t
i i
(NSTRUCI ONS I
i On this form 2r. list the svenge daily umt power levelin MWe Net for each d:y in the reporting inonth. Compute to
, the neare:t whole rne;2 wast.
i (9(77) j l
l l
I
...~.n
_, N 3,.
m
~
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNITNAME J.M. Farley-Unit 1 DATE 6/01/82 COMPLETED BY R c hiraton. III REPORT Af0 NTH May. 1982 TELEPHONE (205) 899-5156 3
.! ?
}
Ek Licensee
,Ev, Cause & Currective
}g5 Event u?
E" Action to No.
Date h
3g
$5 5
j@g Report
- j NC Prevent Recur ence d
No Ur 'it Shutdowns or Power Reductio ts in Miy, 1982 a
a 1
2 3
4 F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A Equipment Failure (Explain)
I-Manual for Prepaution of Data s
B Maintenance of Test 2 Manual Scram.
Enity Sheets for Licensee C Refuchng 3 Automatsc Scram.
Event Reporn (LER) File INUREG-D Regulatory Resirkiion 4-Other (Explain) 01611 E-Operatur Training & 1Jcense Examination F-Adnunistrative 5
G Opeutional Error (Emplain)
Eshibit 1. Same Source (9/77) 11 Othes (E mplain)
?
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MAY, 1982 There were no unit shutdowns or power reductions in the month of May.
The following safety-related maintenance was performed in the month of May:
- 1. Performed preventive maintenance and completed some design changes on diesel generators.
- 2. Radiation Monitor R-21 (Plant Vent Air Particulate) pump was replaced.
- 3. "A" charging pump miniflow valve was repacked.
- 4. BTRS valve leaks were repaired.
- 5. Inlet isolation valve associated with the flow control valve from MDAFW pump to Steam Generator IA was repaired.
l
a OPER ATING DATA REPORT DOCKET NO.59-348 DATE 6/03/82 COMPLETED BY W.G. Hairston, III TELEPliONE (20% 891-5156 OPERAliNG STATUS N"I'5 1) Cumulative data I. Unit Name:
Joseph M. Farley - Unit i _
- 2. Reporting Period:
May. 1982 since 12/01/77, date of
- 3. Licensed Thermal Power (MW:).
2652 commercial operation.
860
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWei: - 829 844.6
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:
N/A
- 9. Power Lesel To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions. lf Any:
N/A This Month Yr. to Date Cumulatne 744 3.623 39.431
- 11. Hours in Reporting Period
- 12. Number Of flours Reactor Was Critical 744 2.122.1 23.103.9
- 13. Reactor Resene Shutdown llours 0
36.6 3.528.6
- 14. Ilours Generator 0n.Line 744 1.933.0 22.262.7
- 15. Unit Resene Shutdown Hours 0
n 0
- 16. Grow Thermal Energy Generated (Mwil 1.955.244 4.733.055 55.677.966 17 Grow Electrical Energy Generated (MWil) 617.808 1.491.910 17.728,862
- 18. Net Electrical Energy Generated (MWii) 586.336 1.385.710 16.609.434
- 19. Unit Senice Factor 100.0 53.4 56.5
- 20. Unit Asailability Factor 100.0 53.4 56.5
- 21. Unit Capacity I-actor (Using MDC Nett 98.1 47.6 52 1
- 22. Unit Capacity Factor (Using DER Net) 95.1 46.1 50.8
- 23. Unit Forced Outage Rate 0.0 46.3 21.1
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INI TI A L CRITIC A LITY 8/06/77 8/09/77 O.,%
INITI A L ELECTRICITY 8/20/77 8/18/77 COMMERCI AL OPER A TION 12/01/77 12/01/77 (9/77 )
50-348
, ' ~
DOC);ET NO.
UNIT J.M. Fntlay-Thit 1
.s DA"It _ 6/03/82
.O C05tPLETED DY W.G. Hairston. III
/
IILEPl!ONE (205) 899-5156 MON 111 May DAY AVERAGE DAILY POWER LEVEL
- DAY AVERACE DAll POWER LEVEL (MWe Net)
(MWe-Net) 800 37 788' g
785 33 Rn1 788 4
3 803' 39 802 20 788 4
5 791 21
791 790 6
792 22 790 791 73 7
791 g
792
- 4
]
790
,95 25 9
10 796 26 789 772
~ lI 796 27 749 793
,a 12 791 783 13 29 789 785 g.:
30 745 787 gg 33 789 16 INSTRUC110N5 On this formir. list the svenge daily umt puwe levelin MWe Net for each d:y in the reporting snunch.Cornpure to
, the nease:t whole ne;2 wast.
b (9(77)
,l J
i
+
m g wp.
q'h g
3 UNITSIIUIDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J.h. Farley-Unit 1 DATE 6/03/82 COMPLETED BY u r Hntrnton. III REPORT hf 0NTil May. 1982 TELEPilONE (205) 899-5156 "i
.$ E
}
h Ek Licensee E
Cause & Currective No.
Date g
g jg5 Event u?
- o. "
Action to
$E 5
j di g Report *
[
N0 Prevent Recurrence H
6 No Ur 'it Shutdowns or Power Reductions in Miy, 1982 I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Pseparation of Data B-Mamtenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-R4fuchng 3 Automatic Scram.
Event Report (LER) File (NUREG-U Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training a license Exannnation F Admimstranve 5
G Operational Error (limplain)
Exhibit I - Same Source (9/77) 11 Other (E xplain)