ML20054E447

From kanterella
Jump to navigation Jump to search
Submits Second Annual Rept on safety-relief Valve Challanges Per TMI Action Item II.K.3.3.No Challenges to Primary Coolant Sys Safety & Relief Valves Occurred During 1981
ML20054E447
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/08/1982
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut
Office of Nuclear Reactor Regulation
References
TASK-2.K.3.03, TASK-TM NUDOCS 8206110219
Download: ML20054E447 (1)


Text

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 SHIELDS L. D ALTROFF etac'fn'ic c'n'ooE ioes June 8, 1982 Docket Nos. 50-277 50-278 Mr. Darrell G.

Eisenhut, Director Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

1981 Annual Report on Safety-Relief Valve Challenges at Peach Bottom Atomic Power Station

Dear Mr. Eisenhut:

This represents the second annual report on safety-relief valve challenges for the Peach Bottom Atomic Power Station as required by NRC Action Plan, Item II.K.3.3.

The definition of challenges used to compile this report is the opening of the main steam safety or relief valves in response to a high reactor pressure condition.

During 1981, there were no challenges to the primary coolant system safety and relief valves on Peach Bottom Units 2 and 3.

Should you have any questions regarding this matter, please do not hesitate to contact us.

Very truly yours, l

}

m

//

]

fl cc:

C. J. Cowgill - Site Inspector gTeK#d%h R