ML20054E389

From kanterella
Jump to navigation Jump to search
Forwards LERs 82-019/03L-0,82-023/03L-0,82-024/03L-0 & 82-020/03L-0
ML20054E389
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/02/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20054E390 List:
References
NUDOCS 8206110165
Download: ML20054E389 (1)


Text

Malling Addr:ss ,

, , , Alabama Power Company

  • 600 North 18th Street '

Post Office Box 2f41 , !' l U9O

^'

p.,>^

Birmingham Alabama 35291 ,,

4 ,j 7~( ' y '" ,

Telephone 205 783-0081 ,

F. L. Clayton Jr.

R"%; *%7"' 32 JU// 7 Alabama Power q, Sg nn soortwrn curre systern June 2, 1982 Docket No. 348 Docket No. 364 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Reports Nos. LER 8 2-019/0 3L-0, LER 82-023/03L-0 and LER 82-024/03L-0 and also Unit 2 Licensee Event Report No. LER 82-020/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written notification of the occurences.

If you have any questions, please advise.

Yours very truly, 1

F. L. Clayt , Jr.

FLCJ r/KWM:n ac i

Enclosures l

l xc: Director, IE (30 copies)

Director, MIPC (3 copies) oyFiGN 8206110165 820602 PDR ADOCK 05000348 i O PDR