' THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P O DOX 5000 m CLEVEL AND. OHIO 44101 m TELEPHONE (216) 622-9800 e ILLUMINATING OLOG e 55 PUBLIC SOUARE Serving The Best Location in the Nation Dalwyn R. Davidson oy v1C[ PRE SIDENT T

s rs n u (NoiNE r nino Aso constauctioN g

?

A a

.e t S /' Z' ip April 15, 198 P th - '

f ;&j L.

Mr. A. Schwencer c'

.f J

Chief, Licensing Branch No. 2 1

gO y'

Division of Licensing

/

/ hx/

U>

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441

" Fast Scram" llydrodynamic Loads on Control Rod Drive Systems

Dear Mr. Schwencer:

This letter is provided in response to your request for information dated March 29, 1982, regarding hyirodynamic loads on the Control Rod Drive (CRD) system.

In a letter dated March 11, 1982, to Mr. James G. Keppler, Director Region III, we identified possible deficiencies in the stress analysis for the CRD piping system, in accordance with 10 CFR 50.55(e). Ilydrodynamic loads due to " fast scram" valve operation were not considered in the original CRD system piping stress analysis and pipe support design. Evaluation of these loads resulted in stresses in excess of ASME III Code Class 2 allowable stress limits on the CRD insert and withdrawal piping.

As a result modifications to socket weld joint configurations have been implemented and modifications to piping supports are planned to eliminate the overstressed condition. These support modifications are thought to be minor; however, the details of these design modifications are not yet final.

In response to your specific requests, we offer the following information:

1.

The above referenced evaluation was based on the use of 20 millisecond as an effective opening time for the scram valves.

2.

An evaluation was performed of the hydrodynamic loads in the CRD system resulting from a valve actuation Sool Z

8204260 d

Mr. A. Schwencar

. April 15,, 1982 Page 2

. Con't)

(

2.

using the 20 millisecond effective opening time. This initial evaluation indicated ASME III Code Class 2 allowable stress limits were exceeded for both piping and supports. A subsequent evaluation has been conducted, following the weld configuration modifications ' identified above which eliminated the overstressed condition on the piping.

3.

The " worst case" situation resulting in maximum hydro-dynamic loads in the CRD system would be a scram during the start-up phase of the plant with no pressure in the reactor vessel. This cold scram condition was used as a basis in the above referenced evaluation.

4.

The mathematical model used' to calculate the hydrodynamic loads in the CRD system is based on RELAP-5 and conservatively represents the actual system condition.

Investigations are continuing in an ef fort to refine the analysis and reduce the impact on pipe support modifications.

5.

A comparison of existing design basis to the hydro-dynamic loads evaluated in-Item 2 above_results in stresses in excess of ASME III allowables for certain piping supports. Support modifications, which are not yet finalized, will be implemented to eliminate the overstress condition for the piping supports.

It is expected that all investigations and design modifications will be completed by July 1, 1982. The proposed plan for struc-turally reinforcing the affected supports will be provided at that time.

In any event, the allowable stress limits of ASME III Code Class 2 will be met for the CRD system insert and withdrawal piping.

If you require any further information, please let us know.

Very Truly Yours, b

Vice resident System Engineering and Construction DRD: mlb cc: John Stef ano Max Gildner Jay Silberg, Esq.