MARCH 2 6 1982
~
\\sA 4
\\
8%
Mr. Gilbert Linder, Project Manager
,.f Technassociates Incorporated S/
?, C j' @f 6001 Montrose Road 2
ak O $@f,y {
Suite 400 J
c*i Rockville, Maryland 20852 s
/
pt g
Dear Mr. Linder:
c l
\\ Q'
Reference:
Contract No. NRC-03-82-094 (SB 3-4-0-8(a)-C-418)
We have reviewed the PM Handbook outline you provided on March 5,1982, and as discussed verbally with you, the following modifications should be made:
1.
Section 1.1 (Statutory Authority) - The list of statutory requimments should be updated; in particular, add recent environmental legislation (e.g., Endangered Species Act);
2.
Section 1.2 (Nuclear Regulatory Connission) - Add a discussion of the Regional Administrators role; 3.
Section 1.2.7 (An Overview of the Licensing Process) - A discussion of LWAs, early site reviews, and the safeguards / safety interface should be added; l
4.
Sections 2.5, 2.6 (Construction Permits Review, Public Hearing Process) - Leave the text of these sections blank since there are only a small nuntper of CP applicants currently being reviewed by the NRC; 5.
Section 2.8 (Operating License Review) - This.section needs more detail, for exanple SER, SSER, DES, and FES issuance and the hearing process should be discussed in~ detail; 6.
Section 2.9 (Post-0perating License Activities) - This section, which discusses the role of the ORPM should be deleted. Instead, a full chapter should be devoted to this topic. As a minimum, a synoptic outline for the chapter shouldlbe provided; 7.
Section 2.10 (Other Areas of PM Responsibility) - Discussions of the
\\
' '{ /
l following should be included in this section or another appropriate 0
section: SALP meetings, Bevill report, biweekly status report, board i
notifications, changes to Bev111 schedules and relationship to OI&E 1
and Emergency Planning; 9
OFFICE )
= ".. " " " " * " "
SUR NA*'E )
......... ( )..
D.*.TF )
OFFICIAL RECORD COPY usom ion-mem NRC FORM 318 (10-80) NRCM ONO
- Mr. Gilbert Linder MARCH 2 6 lilGit 8.
Appendix E (Review List for Issuance of CP) - Leave the text blank since emphasis on CP issuance is not needed at this time.
9.
Supplemental Guidance A (Agmement on NRR/IE Interface and Division of Responsibility) - This is no longer appropriate since the reorganization; delete entimly or leave text blank.
As noted above, the major revision is a shift of emphasis from discussion of
~
CP applications to discussions of operating reactor activities.
If you require ary additional guidance on the comments noted above, please contact us.
Sincerely,
" Original Signed Bya g Janis D. Kerrigan Technical Assistant vor cne Assistant Director for Licensing Division of Licensing DISTRIBUTION Document Control Center i
TERA NRC PDR R. Purple r
T. Novak R. Tedesco G. Meyer R. Coleman, Contracts J. Kerrigan 1
i
[
(p;(Y i
gs"'-
7 (< f'#
p
...DL-D@
l umc.,
J..K..e, n3.
f....
r
.. l..b..
- f.......
.t..i.
suamue>
03
.v....
onep anc ronu ais oo.aomacu oua OFFICIAL RECORD COPY usam i.
. -..