Submits Mods to Be Made to Project Manager Handbook Outline Provided by Technassociates,Inc on 820305
ML20054E080
Person / Time
Issue date: 03/26/1982
From: Kerrigan J
Office of Nuclear Reactor Regulation
To: Linder G
EECTECNA
References
CON-NRC-03-82-094, CON-NRC-3-82-94 NUDOCS 8204260110
Download: ML20054E080 (2)


Text

Q.

D

  • d4L da, Q

o

~~

MARCH 2 6 1982

~

\\sA 4

\\

8%

Mr. Gilbert Linder, Project Manager

,.f Technassociates Incorporated S/

?, C j' @f 6001 Montrose Road 2

ak O $@f,y {

Suite 400 J

c*i Rockville, Maryland 20852 s

/

pt g

Dear Mr. Linder:

c l

\\ Q'

Reference:

Contract No. NRC-03-82-094 (SB 3-4-0-8(a)-C-418)

We have reviewed the PM Handbook outline you provided on March 5,1982, and as discussed verbally with you, the following modifications should be made:

1.

Section 1.1 (Statutory Authority) - The list of statutory requimments should be updated; in particular, add recent environmental legislation (e.g., Endangered Species Act);

2.

Section 1.2 (Nuclear Regulatory Connission) - Add a discussion of the Regional Administrators role; 3.

Section 1.2.7 (An Overview of the Licensing Process) - A discussion of LWAs, early site reviews, and the safeguards / safety interface should be added; l

4.

Sections 2.5, 2.6 (Construction Permits Review, Public Hearing Process) - Leave the text of these sections blank since there are only a small nuntper of CP applicants currently being reviewed by the NRC; 5.

Section 2.8 (Operating License Review) - This.section needs more detail, for exanple SER, SSER, DES, and FES issuance and the hearing process should be discussed in~ detail; 6.

Section 2.9 (Post-0perating License Activities) - This section, which discusses the role of the ORPM should be deleted. Instead, a full chapter should be devoted to this topic. As a minimum, a synoptic outline for the chapter shouldlbe provided; 7.

Section 2.10 (Other Areas of PM Responsibility) - Discussions of the

\\

' '{ /

l following should be included in this section or another appropriate 0

section: SALP meetings, Bevill report, biweekly status report, board i

notifications, changes to Bev111 schedules and relationship to OI&E 1

and Emergency Planning; 9

OFFICE )

= ".. " " " " * " "

SUR NA*'E )

......... ( )..

D.*.TF )

OFFICIAL RECORD COPY usom ion-mem NRC FORM 318 (10-80) NRCM ONO

  • Mr. Gilbert Linder MARCH 2 6 lilGit 8.

Appendix E (Review List for Issuance of CP) - Leave the text blank since emphasis on CP issuance is not needed at this time.

9.

Supplemental Guidance A (Agmement on NRR/IE Interface and Division of Responsibility) - This is no longer appropriate since the reorganization; delete entimly or leave text blank.

As noted above, the major revision is a shift of emphasis from discussion of

~

CP applications to discussions of operating reactor activities.

If you require ary additional guidance on the comments noted above, please contact us.

Sincerely,

" Original Signed Bya g Janis D. Kerrigan Technical Assistant vor cne Assistant Director for Licensing Division of Licensing DISTRIBUTION Document Control Center i

TERA NRC PDR R. Purple r

T. Novak R. Tedesco G. Meyer R. Coleman, Contracts J. Kerrigan 1

i

[

(p;(Y i

gs"'-

7 (< f'#

p

...DL-D@

l umc.,

J..K..e, n3.

f....

r

.. l..b..

f.......

.t..i.

suamue>

03

.v....

onep anc ronu ais oo.aomacu oua OFFICIAL RECORD COPY usam i.

. -..